• 제목/요약/키워드: Cable-stayed concrete bridge

검색결과 89건 처리시간 0.023초

제2돌산대교와 세풍대교의 공사비 분석 (Analysis of Construction Cost of the Second-Dolsan Bridge and the Sepung Bridge)

  • 서영재;이경재;김재홍
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2010년도 춘계 학술대회 제22권1호
    • /
    • pp.21-22
    • /
    • 2010
  • 사장교 형식 중에서 가장 경제적인 콘크리트 사장교가 최근 많이 건설되고 있다. 이 논문에서는 현재 시공 중인 콘크리트 사장교인 제2돌산대교와 세풍대교의 공사비를 비교 분석하여 콘크리트 사장교의 공사비 특성을 조사하였다.

  • PDF

Reasonably completed state assessment of the self-anchored hybrid cable-stayed suspension bridge: An analytical algorithm

  • Kai Wang;Wen-ming Zhang;Jie Chen;Zhe-hong Zhang
    • Structural Engineering and Mechanics
    • /
    • 제90권2호
    • /
    • pp.159-175
    • /
    • 2024
  • In order to solve the problem of calculating the reasonable completed bridge state of a self-anchored hybrid cable-stayed suspension bridge (SA-HCSB), this paper proposes an analytical method. This method simplifies the main beam into a continuous beam with multi-point rigid supports and solves the support reaction forces. According to the segmented catenary theory, it simultaneously solves the horizontal forces of the main span main cables and the stay cables and iteratively calculates the equilibrium force system on the main beam in the collaborative system bridge state while completing the shape finding of the main span main cable and stay cables. Then, the horizontal forces of the side span main cables and stay cables are obtained based on the balance of horizontal forces on the bridge towers, and the shape finding of the side spans are completed according to the segmented catenary theory. Next, the difference between the support reaction forces of the continuous beam with multiple rigid supports obtained from the initial and final iterations is used to calculate the load of ballast on the side span main beam. Finally, the axial forces and strains of each segment of the main beam and bridge tower are obtained based on the loads applied by the main cable and stay cables on the main beam and bridge tower, thereby obtaining analytical data for the bridge in the reasonable completed state. In this paper, the rationality and effectiveness of this analytical method are verified through a case study of a SA-HCSB with a main span of 720m in finite element analysis. At the same time, it is also verified that the equilibrium force of the main beam under the reasonably completed bridge state can be obtained through iterative calculation. The analytical algorithm in this paper has clear physical significance, strong applicability, and high accuracy of calculation results, enriching the shape-finding method of this bridge type.

사장교 콘크리트 주탑의 온도영향 평가 (Evaluation of Thermal Effect on the Concrete Pylon of a Cable-stayed Bridge)

  • 박종칠;김영진;최성권;이충표
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2005년도 봄학술 발표회 논문집(I)
    • /
    • pp.355-358
    • /
    • 2005
  • In this paper, an actual behavior of the pylon of Seohae Grand Bridge which is a cable stayed bridge and has been constructed 4 years ago was analyzed by using data acquisition system. As a result, the pylon of cable stayed bridge behaved normally with respect to the change of temperature. The annual displacement of the top of pylon(PY1) ranged from -71.4mm to +181.7mm in the longitudinal direction of the bridge. In the case of the longitudinal displacement, the displacement of PY1 was bigger than that of PY2 because PY1 is movable and PY2 is fixed in terms of the constraint condition of super structure. For the long term, PY1 will be sloped gently to the direction of Dangjin and PY2 will be also sloped gently to the direction of Pyongtaek by the effect of creep and shrinkage in the case of the longitudinal direction. The result of structural analysis showed good agreement with the result mentioned above.

  • PDF

프리스트레스트 콘크리트 사장교 정착부의 응력특성 (Stress Properties for Anchorage Zone of Cable Stayed Bridge Prestress Concrete)

  • 조병완;변윤주;최준혁;태기호
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2002년도 봄 학술발표회 논문집
    • /
    • pp.531-536
    • /
    • 2002
  • The design of anchorage zone in prestressed concrete cable stayed bridges is very important area due to the more accurate analysis is needed to estimate the behavior. In the study, since the cable anchorage zone in the prestressed concrete cable-stayed bridge is subject to a large amount of concentrated tendon forces, it shows very complicated stress distributions and causes a serious local cracks. Accordingly, It is necessary to investigate the parameters of affecting the stress distribution, such as the cable inclination, the position of anchor plate, the modeling method and the three dimensional effect. The tensile stress distribution of anchorage zone is compared to the actual design condition by varing the stiffness of spring element in the local modeling and an appropriate position of anchor plate is determined. These results would be elementary data to the stress state of anchorage zone and more efficient design.

  • PDF

케이블과 비대칭 구조를 이용한 사장교 주두부 시공 방법 (The Erection Method of Starter Segment for Cable Stayed Bridge using Asymmetric System and Cable)

  • 조서경;윤태섭;정승욱;이재찬;어준
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2002년도 봄 학술발표회 논문집
    • /
    • pp.1031-1038
    • /
    • 2002
  • In this paper the erection method of the Seohae Bridge starter is presented. The erection method of starter for cable stayed bridge was changed from conventional bracket supported erection to heavy lifting supported directly by stays. There was the need to reduce the erection time drastically. The cost saving was obtained as a bonus.

  • PDF

참발강 횡단 사장교의 설계기준 (Design Specifications of Cable Stayed Bridge Across Chambal River)

  • 김모세;유준열;조의경;이상민
    • 콘크리트학회지
    • /
    • 제20권6호
    • /
    • pp.41-46
    • /
    • 2008
  • The bridge across Chambal River consists of two approach bridges and a cable stayed bridge with concrete girder and pylon. And the main bridge has been designed mainly based on AASHTO LRFD. This article covers design specifications from AASHTO LRFD, which are applied to load combinations and structural verification. And it also covers local standards applied in definition of loads such as live load, wind load, temperature, etc. In addition, the difference between applied design specifications and Korean standards is mentioned in this article briefly.

케이블로 지지된 프리스트레스트 콘크리트 박스거더 정착부의 응력특성에 관한 연구 (A Study on Stress Properties for Cable Anchorage zone of Cable Stayed Prestressed Concrete Box Girder)

  • 태기호;김두환;변윤주;송관권
    • 한국안전학회지
    • /
    • 제27권6호
    • /
    • pp.84-92
    • /
    • 2012
  • Anchorage zone in prestressed concrete cable stayed bridges is very important area due to the more accurate analysis is needed to estimate the behavior. In the study, since the cable anchorage zone in the prestressed concrete cable-stayed bridge is subject to a large amount of concentrated tendon forces, it shows very complicated stress distributions and causes a serious local cracks. Accordingly, It is necessary to investigate the parameters of affecting the stress properties, such as the cable inclination, the position of anchor plate, the modeling method and the three dimensional effect. The tensile stress distribution of anchorage zone is compared to the actual design condition by varing the stiffness of spring element in the local modeling and an appropriate position of anchor plate is determined. These results would be elementary data to the stress state of anchorage zone and more efficient design.

Construction stage analysis of three-dimensional cable-stayed bridges

  • Atmaca, Barbaros;Ates, Sevket
    • Steel and Composite Structures
    • /
    • 제12권5호
    • /
    • pp.413-426
    • /
    • 2012
  • In this paper, nonlinear static analysis of three-dimensional cable stayed bridges is performed for the time dependent materials properties such as creep, shrinkage and aging of concrete and relaxation of cable. Manavgat Cable-Stayed Bridge is selected as an application. The bridge located in Antalya, Turkey, was constructed with balanced cantilever construction method. Total length of the bridge is 202 m. The bridge consists of one $\ddot{e}$ shape steel tower. The tower is at the middle of the bridge span. The construction stages and 3D finite element model of bridge are modeled with SAP2000. Large displacement occurs in these types of bridges so geometric nonlinearity is taken into consideration in the analysis by using P-Delta plus large displacement criterion. The time dependent material strength and geometric variations are included in the analysis. Two different finite element analyses carried out which are evaluated with and without construction stages and results are compared with each other. As a result of these analyses, variation of internal forces such as bending moment, axial forces and shear forces for bridge tower and displacement and bending moment for bridge deck are given with detailed. It is seen that construction stage analysis has a remarkable effect on the structural behavior of the bridge.

베트남 밤콩 사장교의 설계 (Design of Vam Cong Cable Stayed Bridge in Vietnam)

  • 이용진;강정운;배상운;윤연석;노병철
    • 한국건설순환자원학회논문집
    • /
    • 제1권2호
    • /
    • pp.120-127
    • /
    • 2013
  • 밤콩 사장교는 메콩강 삼각주 지역 연결 사업의 일환으로 메콩강 하류의 꾸롱 삼각주에 위치하고 있으며, 중앙경간 450m의 사장교로 설계되었다. 왕복 4차선으로 구성된 강합성 보강형과 멀티 스트랜드 방식의 케이블을 적용하였으며, 개선된 H형 주탑과 현장타설 콘크리트 말뚝 기초로 구성되어 있다. 주탑, 프리캐스트 콘크리트 바닥판 그리고 현장타설 콘크리트 말뚝에는 고강도 콘크리트를 적용하여 구조적 안정성을 확보하였다. 본 고에서는 밤콩 사장교의 설계에 적용된 설계기준 및 주요 설계 특징을 설명하고자 한다.

진동법을 이용한 사장교의 시공 중 장력 평가 (Evaluation of Cable Tension Forces Using Vibration Method for a Cable-stayed Bridge under Construction)

  • 조수진;윤정방;심성한
    • 한국안전학회지
    • /
    • 제29권2호
    • /
    • pp.38-44
    • /
    • 2014
  • When a cable-stayed bridge is under construction, the cable tension that changes according to the construction phase is the index indicating the proper construction management. In this study, the vibration method using the least-square estimation has been implemented to monitor changing tensions of two multi-strand cables of a cable-stayed bridge under construction. The test bridge is Hwamyung Bridge in Korea with a prestressed concrete box girder. The field tests are executed during the second tensioning stage just after the installation of the key segment. The tensions of two cables are measured before and after the tensioning and 5 days later (i.e., after finishing the tensioning of all cables). The accuracy of the estimated tensions by the vibration method has been improved by employing proper effective lengths of the cables. The measured tensions are compared with the result of the lift-off tests and design tensions. The vibration method shows very good performance in monitoring the changing tensions according to the construction phase with minimal error.