• 제목/요약/키워드: COST MODEL

검색결과 7,831건 처리시간 0.039초

제약조건과 사전확률이 고려된 선형비용모형의 수정검사정책 (Rectifying Inspection of Linear Cost Model with a Constraint and a $\alpha$-Optimal Acceptance Sampling)

  • 이도경;이근희
    • 산업경영시스템학회지
    • /
    • 제14권24호
    • /
    • pp.1-5
    • /
    • 1991
  • Various linear cost models have been proposed that can be used to determine a sampling plan by attributes. This paper is concerned with this sampling cost model when the probability that the number of nonconforming item is smaller than the break-even quality level is known. In addition to this situation, a constraint by AOQL is considered. Under these conditions, optimal sampling plan which minimize the average cost per lot is suggested.

  • PDF

Optimal Burn-In under Waranty

  • Kim, Kui-Nam;Lee, Kwang-Ho
    • Communications for Statistical Applications and Methods
    • /
    • 제6권3호
    • /
    • pp.719-728
    • /
    • 1999
  • This paper discusses an optimal burn-in procedure to minimize total costs based on the assumption that the failure rate pattern follows a bimodal mixed Weibull distribution. The procedure will consider warranty period as a factor of the total expected burn-in cost. A cost model is formulated to find the optimal burn-in time that minimizes the expected burn-in cost. Conditional reliability for warranty period will be discussed. An illustrative example is included to show how to use the cost model in prctice.

  • PDF

도시철도차량의 수명주기비용 분석의 적용에 대한 고찰 (A Study on the Application of Life Cycle Cost Analysis for the Urban Transit Vehicle)

  • 정광우;김철수;안승호;전영석;김재문;한석윤
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.721-732
    • /
    • 2008
  • This paper is concerned with the life-cycle cost(LCC) analysis of the urban transit vehicle. LCC is the core part of analyzing the total cost of acquisition and ownership of a system. LCC in railway industry has been focused on the prediction of investment for railway vehicles. Therefore, to investigate future cost for operation and maintenance in detail, it is necessary to evaluate the LCC of the vehicle systematically. This study is focused on making a fundamental model for estimating the LCC of the urban transit vehicle. To develop a appropriate LCC model, we broadly analyzed specs and standards and compared the LCC model developed in other country. Moreover, this paper proposes strategies to develop an unique LCC model for the urban transit vehicle.

  • PDF

목표계획법을 이용한 사단급 ASL 선정 모형에 관한 연구 (A Study on an Authorized Stockage List Selection Model)

  • 김충영;길계호
    • 한국국방경영분석학회지
    • /
    • 제25권1호
    • /
    • pp.75-86
    • /
    • 1999
  • The selection criteria of an Authorized Stockage List (ASL) in the Army is based on Army Regulation(AR)409. However, the current selection method of ASL is not considered in cost, weight and volume of repair parts. This paper is focused on developing for a new selection model taking account of cost, weight and volume of repair parts. Goal programming is utilized in order to consider weighted priorities. Different units of cost, and volume are normalized for using weighing value. Real data of a field division are applied to the model. Results of the new selection model are more reduced in cost, weight and volume than those of the previous method.

  • PDF

산출내역서.공정 통합관리 모형 구축에 관한 연구 (Work Management Model to Integrate Schedule and Bill of Quantity)

  • 박홍태;박찬정
    • 한국건축시공학회지
    • /
    • 제2권4호
    • /
    • pp.153-161
    • /
    • 2002
  • Recently our government operates earned value management system (EVMS) for improving work management system of the construction projects over specific scale. The EVMS is based on the integrated management between construction cost and schedule. the existing systems, however, are focused on the cost management by using work quantity. This study suggests a work management model to integrate construction cost with activity information. The model introduces a work task concept as a tool that can connect construction rest to activity information. The suggested model in this study is verified by using actual data for the applicability to practical construction projects.

An optimal continuous type investment policy for the surplus in a risk model

  • Choi, Seung Kyoung;Lee, Eui Yong
    • Communications for Statistical Applications and Methods
    • /
    • 제25권1호
    • /
    • pp.91-97
    • /
    • 2018
  • In this paper, we show that there exists an optimal investment policy for the surplus in a risk model, in which the surplus is continuously invested to other business at a constant rate a > 0, whenever the level of the surplus exceeds a given threshold V > 0. We assign, to the risk model, two costs, the penalty per unit time while the level of the surplus being under V > 0 and the opportunity cost per unit time by keeping a unit amount of the surplus. After calculating the long-run average cost per unit time, we show that there exists an optimal investment rate $a^*$>0 which minimizes the long-run average cost per unit time, when the claim amount follows an exponential distribution.

양식선별효과에 관한 연구 (A Study on the Sorting Effect in Aquafarm)

  • 어윤양;송동효
    • 수산경영론집
    • /
    • 제49권4호
    • /
    • pp.19-36
    • /
    • 2018
  • Overstock in aquaculture is a matter of concern in aquaculture management. To sort fish based on fingerling size in case of overstocking is an important problem in aquaculture farm. This study aims to determine the amount of fry overstock and sorting time in aquaculture farm. This study builds a mathematical model that finds the value of decision variables to optimize objective function summing up the fingerling purchasing cost, aquaculture farm operating cost and feeding cost under mortality and farming period constraints. The proposed mathematical model involves following biological and economical variables and coefficients: (1) number of fingerlings, (2) sorting time, (3) fish growth rate and variation, (4) mortality, (5) price of a fry (6) feeding cost, and (7) possible sorting periods. Numerical simulation is presented herein. The objective of numerical simulation is to provide decision makers to analyse and comprehend the proposed model. When extensive biological data about growth function of fry becomes available, the proposed model can be widely applicable to real aquaculture farms.

연장된 이단계 보증 이후의 교체모형 (Replacement Model after Extended Two-phase Warranty)

  • 정기문
    • 통합자연과학논문집
    • /
    • 제14권4호
    • /
    • pp.197-204
    • /
    • 2021
  • Under the two-phase warranty, the warranty period is divided into two intervals, one of which is for renewing replacement warranty, and the other is for minimal repair warranty. Jung[13] discusses the two types of extended two-phase warranty models. In this paper, we suggest the replacement model after the extended two-phase warranty that has been proposed by Jung[13]. To determine the optimal replacement policy, we adopt the expected cost rate per unit time. So, the expressions for the total expected cost, the expected length of the cycle and the expected cost rate per unit time from the user's point of view are derived. Also, we discuss the optimal replacement policy and the uniqueness of the solution for the optimization. Furthermore, the numerical examples are provided to illustrate the proposed the replacement model.

COST PERFORMANCE PREDICTION FOR INTERNATIONAL CONSTRUCTION PROJECTS USING MULTIPLE REGRESSION ANALYSIS AND STRUCTURAL EQUATION MODEL: A COMPARATIVE STUDY

  • D.Y. Kim;S.H. Han;H. Kim;H. Park
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.653-661
    • /
    • 2007
  • Overseas construction projects tend to be more complex than domestic projects, being exposed to more external risks, such as politics, economy, society, and culture, as well as more internal risks from the project itself. It is crucial to have an early understanding of the project condition, in order to be well prepared in various phases of the project. This study compares a structural equation model and multiple regression analysis, in their capacity to predict cost performance of international construction projects. The structural equation model shows a more accurate prediction of cost performance than does regression analysis, due to its intrinsic capability of considering various cost factors in a systematic way.

  • PDF

동적계획법을 이용한 유수체계의 최적설계 (Optimal Design of Datention System using Incremental Dynamic Programming)

  • 이길성;이범희
    • 물과 미래
    • /
    • 제28권1호
    • /
    • pp.153-168
    • /
    • 1995
  • 본 연구의 목적은 다지점 유수체계의 최소비용 설계를 위한 효율적 모형을 개발하려는 것이며,로서 제안된 IDP 모형은 수문-수리학적 모형(강우-유출모형과 유역 및 하도 공수추적모형)과 최적화모형 등 2개의 부모형을 포함하고 있다. 목적함수는 대지구입비용과 유수지 설치비용 및 펌핑 시스템의 설치비용의 합으로 구성되며, 모형의 입력자료로는 각 하도자료와 수문 매개변수 및 설계강우와 비용함수등이 제시되어야 한다. 본 모형은 다지형 하도의 유수체계를 포함하고 있는 서울의 중랑천 유역에 적용되었으며, 모형의 적용결과 여러 조건의 변화에 대해서도 합리적인 유수체계의 설계가 가능하며, 다지점 유수체계의 설계에 대한 적용이 가능함을 보여주고 있다.

  • PDF