BIM정보를 활용한 강구조물의 공정 물량 통합관리 (Integrated Management of Process Schedule and Quantity Take-Off for Steel Structures using BIM Information)

  • 김진욱;신태송
    • 한국BIM학회 논문집
    • /
    • 제8권2호
    • /
    • pp.10-18
    • /
    • 2018
  • BIM technologies store, share and integrate the information produced in each sector of the construction industry. From this point on, it increases the efficiency of the work. Currently, quantity take-off and process schedule are derived separately based on BIM technology. When calculating the quantity by process, relevant information shall be collected, reinterpreted, and reevaluated as required by the practice. The purpose of this study is to develop an integrated process and quantity management system through BIM collaboration and to build prototypes for steel structures. The main research is to build a construction BIM model for steel structures and a process BIM model through BIM collaboration. Furthermore, necessary information was selected and processed according to the user's needs for integrated management. Relevant integration outcomes are visualized graphically to maximize utilization. Through these studies, a system for integrated control of processes and supplies is provided, and the results are expected to contribute to the improvement of working efficiency and are easily and quickly reflected in design change and process change. In this study, we intended to enhance the usability of information by linking process schedules with quantity calculations based on BIM. Thus, the process for integrated control of the quantity of structural components by process unit and the BIM based schedule information was established. In addition, the efficiency of the information link of the integrated management system was considered for design changes and process schedule changes.

소규모 건설회사의 공정관리 현황과 대학의 공정관리 교육방안 (Time Management Status of Small Contractors and Suggestions on Education for Time Management in Colleges)

  • 장명훈;이용규
    • 예술인문사회 융합 멀티미디어 논문지
    • /
    • 제6권3호
    • /
    • pp.413-422
    • /
    • 2016
  • 공사관리자는 가용자원을 최대한 합리적으로 사용하고 주어진 공사기간과 예산 범위 내에서 건설 프로젝트를 완료하기 위해 노력하며, 공사기간 내에 프로젝트를 끝내기 위해 바차트나 CPM과 같은 공정표를 활용한다. 제주지역의 소규모 건설회사나 현장에서는 건설공사를 수행하기 위한 도구로 공정관리 전문 소프트웨어보다는 엑셀을 많이 사용하는 것으로 조사되었다. 이는 엑셀이 원가와 연계하여 사용하기 편리하고 공정관리 소프트웨어를 활용할 전문가도 부족하기 때문이다. 대학은 지역의 중소규모 건설회사가 요구하는 공정관리 능력을 가진 인재를 배출하고 있지만 교육의 질적 및 양적 측면에서 다소 부족하다. 지방 국립대 건축공학의 교육과정 조사에 의하면 대부분의 학과는 공정관리과목이나 유사한 과목을 편성하고 있다. 주요 교육내용은 네트웍 공정관리기법에 대한 이해와 공정표 작성으로 이루어져 있다. 공정관리 소프트웨어에 대한 교육과 실습은 일부 대학에서만 이루어지고 있으므로 중소규모 건설현장의 공정관리 전문가를 양성하기 위해서는 바차트 활용과 전문 공정관리 소프트웨어 교육도 필요하다.

건설프로젝트 정보관리 효율화를 위한 PDA 및 Barcode 적용기술 개발 (An Application of PDA and Barcode Technology for the Improvement of Information Management in Construction Projects)

  • 오세욱;김영석;이준복;김한수;성낙원
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.553-558
    • /
    • 2003
  • 건설 프로젝트에서 단위작업별로 발생하는 노무자의 작업정보와 실적물량 정보는 다양한 건설정보로서 가공될 수 있고 해당 프로젝트의 성과측정 및 경영분석을 위한 근거자료로 활용될 수 있다. 따라서 본 연구에서는 PDA 및 바코드 기술을 활용하여 단위작업 중심의 노무자 작업정보 및 실적물량 정보를 수집하는 방법론을 제시하고 이를 가공하여 노무, 생산성, 공정관리에 활용할 수 있는 건설 프로젝트 정보관리 시스템을 구현하였다. 본 연구에서 제시한 시스템은 건설 프로젝트의 정보관리에 있어 중요한 실적자료로서 해당 프로젝트의 성과 측정 및 향후 유사 프로젝트의 공사계획에 유용한 정보로 활용할 수 있을 것으로 기대된다.

  • PDF

성과측정유닛을 활용한 건설 비용 - 일정 통합관리 방안 (Construction Cost-Schedule Integration Management Methodolgy by using Progress Integration Unit)

  • 강남희;최재현
    • 한국건설관리학회논문집
    • /
    • 제18권3호
    • /
    • pp.42-51
    • /
    • 2017
  • 건설 프로젝트의 생산과정에서 성과를 지속적으로 측정하고 평가하는 것은 프로젝트관리의 성공적인 수행을 위한 핵심요소이다. 성과는 일반적으로 목적물에 할당 된 공정과 원가 관련 정보를 정량적으로 평가함으로써 측정되며, 객관적인 성과측정을 위해 공정과 원가가 통합적으로 계획 관리되어야 한다. 본 연구는 공정과 원가의 통합 모델을 통해 성과 측정 방법론을 제안하고 진도관리의 기반을 마련하는데 목적이 있다. 이를 위해 공정계획과 원가계획의 표준화된 업무 프로세스를 개발하였고, EVM과 기존의 통합 모델을 분석하여, 성과측정 유닛을 활용한 WBS와 CBS의 통합 방법론을 제시하였다. 플랜트 프로젝트의 시공단계를 중심으로 공통 성과측정의 대상은 공종으로 선정하여 성과측정 유닛을 규정하고 공정과 비용정보를 연계시켜 성과비율을 산정하였다. 또한 리소스의 적용시 원가요소 중 소모성자원의 비용을 배제하여 진도측정의 객관성을 향상하였다. 본 결과는 실제 플랜트 사례 프로젝트에 적용하여 실증되었으며, 개발된 방법론은 향후 프로젝트의 성과를 보다 객관적인 기준으로 평가할 수 있어 보다 효과적인 진도관리 방법이 될 것으로 판단된다.

A Stochastic Simulation Model for Estimating Activity Duration of Super-tall Building Project

  • Minhyuk Jung;Hyun-soo Lea;Moonseo Park;Bogyeong Lee
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.397-402
    • /
    • 2013
  • In super-tall building construction projects, schedule risk factors which vertically change and are not found in the low and middle-rise building construction influence duration of a project by vertical attribute; and it makes hard to estimate activity or overall duration of a construction project. However, the existing duration estimating methods, that are based on quantity and productivity assuming activities of the same work item have the same risk and duration regardless of operation space, are not able to consider the schedule risk factors which change by the altitude of operation space. Therefore, in order to advance accuracy of duration estimation of super-tall building projects, the degree of changes of these risk factors according to altitude should be analyzed and incorporated into a duration estimating method. This research proposes a simulation model using Monte Carlo method for estimating activity duration incorporating schedule risk factors by weather conditions in a super-tall building. The research process is as follows. Firstly, the schedule risk factors in super-tall building are identified through literature and expert reviews, and occurrence of non-working days at high altitude by weather condition is identified as one of the critical schedule risk factors. Secondly, a calculating method of the vertical distributions of the weather factors such as temperature and wind speed is analyzed through literature reviews. Then, a probability distribution of the weather factors is developed using the weather database of the past decade. Thirdly, a simulation model and algorithms for estimating non-working days and duration of each activity is developed using Monte-Carlo method. Finally, sensitivity analysis and a case study are carried out for the validation of the proposed model.

  • PDF

복합공종 MEP 천정 선조립 공법 사례조사를 통한 단계별 중점관리사항 도출 (Deriving Critical Management Factors based on Case Studies of Multi-trade MEP Ceiling Rack Prefabrication)

  • 이동민;장세준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 추계 학술논문 발표대회
    • /
    • pp.76-77
    • /
    • 2015
  • In construction industry, management of construction factors such as cost, schedule, quality and safety is the most important key for delivering successful projects. According to the Smart Market Report, a magazine specialized in construction industry, recently said 'Off-site Prefabrication' is a significant trend related with construction productivity in global construction industry. It is a kind of practice shift from On-site to Off-site. A lot of general contractors in oversea have been using 'Multi-trade MEP Ceiling Rack Prefabrication' method for getting benefits such as decreased cost & schedule and increased labor productivity. Thus, in this paper, critical management factors at each phase from design to installation was derived by researching case studies. Forwardly, it can be a basic guideline for applying Multi-trade MEP Ceiling Rack Prefabrication in Korea construction industry.

  • PDF

INTEGRATION MODEL OF COST AND SCHEDULE IN STEEL BOX GIRDER BRIDGE PRODUCTION PROCESS

  • Seok Kim;Kyoungmin Kim;Seung-Ho Ha ;Kyong Ju Kim
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.1262-1267
    • /
    • 2005
  • It is still difficult to share and utilize the information generated at each phase of a steel box girder production process due to the spatial gap and different level of management information. The physical distance results in the inefficiency of the information transmission, the accidental omission and typos of the relative information, and so on. Various levels of management information make it difficult to embody a new management system. Eventually, these factors incur the loss of cost and schedule and interrupt development of a new management system. This paper analyzes a current process and presents graphical process flow by using IDEF0. Based this analysis, the research for new production process and work breakdown structure (WBS) is conducted. At the end of this paper, the conceptual design of this system is suggested. Through new management system, it is expected that the model proposed in this study will improve the management process in the steel box production, and the improved process will reduce the redundant cost and schedule information, transmission and deposit generated by manual paper.

  • PDF

스마트 기기용 일정관리도구에 대한 기초연구 (A Basic Study on a Schedule Management Tool Used in Smart Devices)

  • 장명훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.311-313
    • /
    • 2012
  • Many efforts have been made and many tools have been developed in order to manage construction projects by a smart device such as a smart phone and smart pad. This research proposed a method to manage construction schedules via a smart device using Flash. The interactive and graphic property of Flash enables a field manager to manage schedules easily and efficiently. A prototype was implemented by Adobe Flex Builder, and it applied a sample network in a smart pad. Further studies would develop network diagrams such as CPM(Critical Path Method).