• Title/Summary/Keyword: CM for fee

Search Result 30, Processing Time 0.028 seconds

Digital DBS System (디지털 위성방송 시스템)

  • 장규상
    • Journal of Broadcast Engineering
    • /
    • v.1 no.1
    • /
    • pp.1-6
    • /
    • 1996
  • Digital DBS service using Korea Sat starts at Korea Telecom's Yong-in transmission site. Total 6 transmitting stations are needed. At each transmitting station, 4 TV programs are compressed and multiplexed using MPEG-2, modulated into IF, RF signals, then finally transmitted through antenna. At DBS transponder, received signal is down converted, amplified and re-transmitted to earth. At receiver, signal is received by 45cm dish antenna, then wanted program is selected, demultiplexed and decoded. Transmission performance of BER lOE-ll is implemented by using FEe coding and QPSK modulation. For pay TV management, conditional access system, smart card and modem are used.

  • PDF

Investigation of the Current Clinical Result of Korean Medical Treatment of Infertility -In Major University Korean Medicine Hospitals and Local Korean Medicine Clinics Participated in the Research- (한방 난임 치료의 특성과 결과에 대한 분석 -2011년 주요 한의과대학 부속한방병원 및 연구 참여 한의원을 중심으로-)

  • Lee, Dong-Nyung;Choi, Min-Sun;Kim, Dong-Il
    • The Journal of Korean Obstetrics and Gynecology
    • /
    • v.27 no.4
    • /
    • pp.69-87
    • /
    • 2014
  • Objectives: We analyzed retrospective clinical data of Korean medical institutes for infertility care and investigated current status and outcome of the Korean medical treatment of infertility as a part of foundational research for verifying validity of constructing national support system and developing appropriate policy on Korean medical treatment of infertility. Methods: We investigated data uploaded on the homepage of The Society of Korean Medicine for Subfertility (http://www.okinfertility.org) by Korean medical institutes for infertility care to get informations such as patients' age, body height, weight, methods of Korean medical treatment, cost and duration of treatment, success or failure of pregnancy and result of treatment. Results: The average age of patients was $33.1{\pm}3.8$ and the average body height was $161.2{\pm}5.3cm$ and the average body weight was $55.2{\pm}8.5kg$. The method of Korean medical treatment was Herbal medicine (97.5%), acupuncture (80.4%), moxibustion (57.7%), cupping (32.7%). The average cost of treatment was $1,160,625{\pm}882,499$ won, and the average medical cost per visit was $357,845{\pm}241,602$ won. The average duration of treatment was $11.26{\pm}10.58$ weeks, and the average number of visits per patient was $4.78{\pm}6.10$ times. The average duration of treatment was the longest in the group of infertile patients with the highest average medical cost per visit. The average pregnancy success rate was 30.9% overall, and that of the group of infertile patients was 25.8%. Conclusions: When we develop the standard project model with expectation for about 25% success rate of pregnancy and delivery in the group of patients who have idiopathic and ovulatory factors, it is desirable to perform acupuncture and moxibustion treatment 1-2 times a week with herbal medicine. The treatment period is set to at least 12 weeks. Average treatment fee maybe calculated by converting the averaged treatment cost of clinic's one month worth of daily treatment fee and medical hospital's ten day treatment fee into weekly treatment cost.

Optimization for Precast Prestressed Wide-U Beams with the Least Depth (최소깊이 프리캐스트 프리스트레스트 U형보의 최적화)

  • Yul Sung-Yong
    • Journal of the Korea Concrete Institute
    • /
    • v.16 no.1 s.79
    • /
    • pp.18-26
    • /
    • 2004
  • The cost of underground work is a dominant factor to determine the total construction fee. It is generally 2 ${\~}$ 2.5 times higher than that of above ground for building with the same height. 'A new precast prestressed framing plan for underground parking building' was suggested with the beam of the least depth - U-type beams. The depth of regular rectangular reinforced concrete beam which is currently used in the underground parking of apartments could be reduced up to 12 ${\~}$ 34cm/story due to the development of a U-beams from the optimum process. Two full scale prototype U-beams were tested in this study. It was found that the Wide U-beams in the test showed higher strength than calculated nominal and design, however need to provide temporary supports to meet the flexural moment of construction load at the simply supported state before the lopping concrete hardens.

Gas Hydrate Exploration by using PCS(Pressre Core Sampler): ODP Leg 204 (압력코어를 이용한 가스 하이드레이트 탐사: ODP Leg 204)

  • Lee Young-Joo
    • Economic and Environmental Geology
    • /
    • v.38 no.2 s.171
    • /
    • pp.165-176
    • /
    • 2005
  • Natural gas in deep sediment may occur in three phases based on the physical and chemical conditions. If the concentration of gas in pore water is less than the solubility, gas is dissolved. If the concentration of gas is greater than its solubility (water is saturated or supersaturated with gas), gas occurs as a fee gas below the gas hydrate stability Lone (GHSZ) and is present as solid hydrate within the GHSZ. The knowledge of gas concentration in deep sediment appears critical to determine the phase of natural gases and to understand the formation and distribution of gas hydrate. However, reliable data on gas concentration are usually available only from the upper section of marine sediment by the headspace gas technique, which is widely used for sampling of gases from the sediments. The headspace gas technique represents only a fraction of gases present in situ because sediments release most of the gases during recovery and sampling. The PCS (Pressure Core Sampler) is a downhole tool developed to recover a nominal $1{\cal}m$ long, $4.32{\cal}cm$ diameter core containing $1,465cm^3$ of sediment, pore water and gas at in situ pressure up to 68.9 MPa. During Leg 204, the PCS was deployed at 6 Sites. In situ methane gas concentration and distribution of gas hydrate was measured by using PCS tool. Characteristics of methane concentration and distribution is different from site to site. Distribution of gas hydrate in the study area is closely related to characteristics of in situ gas concentration measured by PCS.

Evaluation of Capability for Practicing CM at Risk in Korea (국내 시공책임형 건설사업관리 수행을 위한 기업 역량 평가)

  • Ryu, HanGuk;Lee, Sangwon;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.2
    • /
    • pp.79-87
    • /
    • 2020
  • The Korean domestic construction management at risk (CMAR) market is in the process of completing the pilot project execution under the leadership of the Ministry of Land, Infrastructure and Transport as of December 2019. The government starts practicing CMAR an alternative delivery method widely in order to diversify delivery methods and enhance construction technology. The CMAR market is thus expected to grow. This study was conducted to improve CMAR firms' capability by developing self-assessment tools for them to evaluate current capability more effectively. As a result of defining standard core capability and additional elements categorized by project execution phase and management area, and performing evaluation from the CMAR project participants, it was found that the general project management capability in the pre-design and procurement phase and quality management area was lower compared to the construction phase and other areas. In addition, the capability of cost management area was lower in spite of its high importance. Communication and coordination, process optimization, and target values achievement were at the initial level of capability and continuous improvement was required.

Energy harvesting techniques for remote corrosion monitoring systems

  • Kim, Sehwan;Na, Ungjin
    • Smart Structures and Systems
    • /
    • v.11 no.5
    • /
    • pp.555-567
    • /
    • 2013
  • An Remote Corrosion Monitoring (RCM) system consists of an anode with low potential, the metallic structures against corrosion, an electrode to provide reference potential, and a data-acquisition system to ensure the potential difference for anticorrosion. In more detail, the data-acquisition (DAQ) system monitors the potential difference between the metallic structures and a reference electrode to identify the correct potential level against the corrosion of the infrastructures. Then, the measured data are transmitted to a central office to remotely keep track of the status of the corrosion monitoring (CM) system. To date, the RCM system is designed to achieve low power consumption, so that it can be simply powered by batteries. However, due to memory effect and the limited number of recharge cycles, it can entail the maintenance fee or sometimes cause failure to protect the metallic structures. To address this issue, the low-overhead energy harvesting circuitry for the RCM systems has designed to replenish energy storage elements (ESEs) along with redeeming the leakage of supercapacitors. Our developed energy harvester can scavenge the ambient energy from the corrosion monitoring environments and store it as useful electrical energy for powering local data-acquisition systems. In particular, this paper considers the energy harvesting from potential difference due to galvanic corrosion between a metallic infrastructure and a permanent copper/copper sulfate reference electrode. In addition, supercapacitors are adopted as an ESE to compensate for or overcome the limitations of batteries. Experimental results show that our proposed harvesting schemes significantly reduce the overhead of the charging circuitry, which enable fully charging up to a 350-F supercapacitor under the low corrosion power of 3 mW (i.e., 1 V/3 mA).

A Study On Properties and Phase Change Characteristics of (GeTe)x(Sb2Te3) (x=0.5, 1, 2, 8) Thin Films for PRAM (PRAM을 위한 (GeTe)x(Sb2Te3) (x=0.5, 1, 2, 8) 박막의 물성 및 상변환 특성 연구)

  • Kim, Sung-Won;Song, Ki-Ho;Lee, Hyun-Yong
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.21 no.7
    • /
    • pp.585-593
    • /
    • 2008
  • In this work, we report several experimental data capable of evaluating the phase transformation characteristics of GeSbTe pseudobinary thin films comprehensively utilized as phase change materials. The phase transformation of the GeSbTe thin films was confirmed by XRD measurement from amorphous to hexagonal structure via fee structure except for $Ge_8Sb_2Te_{11}$. In addition, X-ray photoelectron spectra analysis revealed to weaken Ge-Te bond for $Ge_2Sb_2Te_5$ and to strengthen the bonds of all elements for $Ge_8Sb_2Te_{11}$ during the amorphous to crystalline transition. The values of optical energy gap $(E_{OP})$ were around 0.71 and 0.50 eV and the slopes of absorption in extended region (B) were ${\sim}5.1{\times}10^5$ and ${\sim}10{\times}10^5cm^{-1}{\cdot}V^{-1}$ for the amorphous and fcc-crystalline structures, respectively. Finally, the kinetics of amorphous-to-crystalline phase change on the GeSbTe films was characterized using a nano-pulse scanner with 658-nm laser diode (power; $1{\sim}17$ mW, pulse duration; $10{\sim}460$ ns).

Comparison between Tissue Adhesive and Suture by Using Modified Hollander Score for Facial Wounds Treated in the Emergency Department (응급실 얼굴 열상 환자에서 Modified Hollander 점수에 의한 조직 접착제 사용과 봉합사를 이용한 봉합 후 결과 비교)

  • Hong, Suk-Ho;Yang, Young-Mo;Lee, Jang-Young;Lee, Won-Suk;Bark, Koung-Nam;Yang, Hee-Bum
    • Journal of Trauma and Injury
    • /
    • v.24 no.2
    • /
    • pp.143-150
    • /
    • 2011
  • Purpose: The object of this study is to compare the patient satisfaction in the view of scarring, cost, and hospital stay between the conventional suture method and a method using Histoacryl$^{(R)}$ (2-N-butylcyanoacrylate) adhesive for treating facial lacerations in the emergency department. Method: This study is a randomized prospective trial, which was conducted from December 2009 to January 2010. The participants include 109 patients who visited the emergency room in Deajon Eulji Medical Center. The ages ranged from 1 to 59 (mean age of 18.7), and all had facial lacerations of less than 3 cm. In order to treat the facial lacerations, an emergency medicine doctor used tissue adhesive (2-N-butylcyanoacrylate, Histoacryl$^{(R)}$) for 41 patients in the experimental group, and a plastic surgeon performed conventional suturing for 68 patients in the control group. The ER-stay and the primary treatment fee were compared in the two groups, and the scarring was evaluated 10 to 11 months from suturing by using the Modified Hollander Method and the 10-cm scaled VAS (visual analogue scale: score 0=no scar, score 10=very severe scar) Result: The ER stay was 76 minutes for the experimental group and 107 minutes for the control group, showing that statistically significantly less time of 31 minutes was taken in the experimental group. The cost of the experimental group was 40000 won (50.1%) more expensive than the control group, with an average cost of 121900 won for the experimental group and 81200 won for the control group. As for scar evaluation, 10.56 months after suturing, the experimental group showed a better result with a score of 2.6 compared to a score of 3.4 in the control group; however, this difference was not statistically significant ($p$ <0.05). As to a detailed evaluation of scar characteristics, the experimental group had a statistically significantly better result in scar elevation, with a score of 0.6 compared to a score of 1.65 for the control group. Conclusion: If appropriate patients are selected, the method using tissue adhesive directly applied by an EM doctor not only decreases ER stay but also creates similar patients satisfaction, with statistically better result in scar elevation, compared to the conventional suture method; thus, ultimately general patient satisfaction is increased.

Comparison of Nitrogen Removal in Free Water Surface Wetlands Purifying Stream Water with and without Litter Layer on its Bottom (자유수면습지의 잔재물층에 의한 하천수 질소제거 비교)

  • Yang, Hongmo
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.11 no.6
    • /
    • pp.120-129
    • /
    • 2008
  • Removal rate of $NO_3-N$ and TN in a free water surface wetland system with litter layer on its bottom was compared with that without one. The system was established on floodplain in the down reach of the Gwangju Stream in 2001. Its dimensions were 31 meters in length and 12 meters in width. Water of the stream was funneled into it and its effluent was discharged back into the channel. Average litter layer of 9.6 cm was formed on its bottom in 2007. The layer and above-ground parts of reeds and cattails on the system were eliminated in Spring 2008. Volumes and water quality of inflow and outflow of the system were analyzed from May to November in 2007 and 2008, respectively. Inflow into the system both in 2007 and 2008 averaged approximately $40m^3/day$ and hydraulic residence time both in 2007 and 2008 was about 1.5 days. Average influent $NO_3-N$ concentration in 2007 and 2008 was 2.16 and 2.05 mg/L, respectively and influent TN concentration in 2007 and 2008 averaged 3.98 and 3.89 mg/L, respectively. With a 0.05 significance level, effluent temperatures, influent concentrations of $NO_3-N$ and TN, and stem numbers per square meter and height of the emergent plants showed no difference between the system with litter layer and without one. $NO_3-N$ removal in the system with litter layer and without it averaged 55.59 and 46.06%, respectively and TN retention averaged 57.24 and 48.97%, respectively. Both $NO_3-N$ and TN abatement rates in the system with litter layer were significantly high (p < 0.001) when compared with those without one. The wetland system having litter layer on its bottom was more efficient for $NO_3-N$ and TN retention than that without one.

Improvement of Construction Management System in Public Construction Projects - Focused on the Total Project Cost Management Guidelines - (공공 건설사업의 효율적 건설사업관리수행을 위한 제도개선방안 - 총사업비관리지침을 중심으로 -)

  • Cho, Youngjun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.1
    • /
    • pp.3-11
    • /
    • 2020
  • In large public construction projects with a certain size or larger that need to be carried out over a number of years, the Authority must secure a budget for construction project management activities by the construction manager. There is no problem if the project management budget secured by the issuing Authority and the project management budget executed by the issuing Authority are the same, but if not, various problems will arise. Therefore, in this study, the following measures were proposed to improve the system for efficient operation of construction project management: First, the construction project management terms and tasks specified in the statutes and the guidelines of government agencies should be unified and the standard for calculating consideration should be unified. Second, the total project cost management guideline should be specified so that the missing construction project manager can receive compensation for the technical proposal. Third, if the project cost is changed in the long-term continuous construction project, the construction project management expense should be adjusted accordingly. Fourth, if construction project management service is required from the Authority, the basis for consignment to a specialized institution should be specified in the total project cost management guideline.