• Title/Summary/Keyword: CCPP

Search Result 28, Processing Time 0.024 seconds

A Study on the Demonstration of Yellow Plume Elimination System from Combined Cycle Power Plant Using Liquid Injection System (액상 직분사 시스템을 이용한 복합화력 황연제거 실증 연구)

  • Lee, Seung-Jae;Kim, Younghee
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.10
    • /
    • pp.317-324
    • /
    • 2020
  • Combined cycle power plants (CCPP) that use natural gas as fuel are easier to start and stop, and have lower pollutant emissions, so their share of domestic power generation facilities is steadily increasing. However, CCPP have a high concentration of nitrogen dioxide (NO2) emission in the initial start-up and low-load operation region, which causes yellow plume and civil complaints. As a control technology, the yellow plume reduction system was developed and operated from the mid-2000s. However, this technology was unable to control the phenomenon due to insufficient preheating of the vaporization system for 10 to 20 minutes of the initial start-up. In this study, CFD analysis and demonstration tests were performed to derive a control technology by injecting a reducing agent directly into the gas turbine exhaust duct. CFD analysis was performed by classifying into 5 cases according to the exhaust gas condition. The RMS values of all cases were less than 15%, showing a good mixing. Based on this, the installation and testing of the demonstration facilities facilitated complete control of the yellow plume phenomenon in the initial start-up.

Numerical Analysis of Gas Leakage and Diffusion Behavior in Underground Combined Cycle Power Plant (지하 복합발전 플랜트 내에서의 가스 누출 및 확산 거동에 관한 수치해석 연구)

  • Bang, Joo Won;Lee, Seong Hyuk
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.4
    • /
    • pp.118-124
    • /
    • 2017
  • In this study, a numerical simulation was performed using commercial code Fluent(v.17.1). The underground Combined Cycle Power Plant (CCPP) was simplified to analyze the methane gas leakage with the crack size and position. In addition, extensive numerical simulations were carried out for different crack sizes from 10 mm to 20 mm. The crack position is the gas leakage, which is assumed to be near the pipe elbow and the gas turbine. A total of 4 cases were compared and analyzed. To analyze the gas leakage, the concept of the Lower Flammable Limit (LFL) was applied. The leakage distance was defined in the longitudinal direction, and the transverse direction was estimated and quantitatively analyzed. As a result, the leakage distance in the longitudinal direction varies by 52.3 % depending on the crack size at the same crack position. Moreover, the maximum difference was 34.8 % according to the crack position when the crack sizes are identical. As jet flow impacts on the obstacle and changes its direction, the recirculation flows are formed. These results are expected to provide useful data to optimize the location and number of gas detections in confined spaces, such as underground CCPP.

Ratio Optimization Between Sizes of Components of Heat Recovery Steam Generator in Combined Cycle Gas Turbine Power Plants (복합사이클 발전플랜트 폐열회수 보일러의 구성요소 크기비의 최적화)

  • In, Jong-Soo;Lee, Sang-Yong
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.33 no.6
    • /
    • pp.403-410
    • /
    • 2009
  • This paper proposes a new approach to find the optimum ratios between sizes of the heat exchangers of the heat recovery steam generator (HRSG) system with limited size to maximize the efficiency of the steam turbine (bottom) cycle of combined cycle power plants (CCPP), but without performing the bottom cycle analysis. This could be achieved by minimizing the unavailable exergy (the sum of the destroyed and the lost exergies) resulted from the heat transfer process of the HRSG system. The present approach is relatively simple and straightforward because the process of the trial-and-error method, typical in performing the bottom cycle analysis for the system optimization, could be avoided. To demonstrate the usefulness of the present method, a single-stage HRSG system was chosen and the optimum evaporation temperature was obtained corresponding to the condition of the maximum useful work. The results show that the optimum evaporation temperature based on the present exergy analysis appears similar to that based on the bottom cycle analysis. Also shown is the dependency of size (NTU) ratios between the heat exchangers on the inlet gas temperature, which is another important factor in determining the optimum condition once overall size of the heat recovery steam generator is given. The present approach turned out to be a useful tool for optimization of the singlestage HRSG systems and can easily be extended to multi-stage systems.

Thermal-structural Analysis and Fatigue Life Evaluation of a Parallel Slide Gate Valve in Accordance with ASME B&PVC (패러럴 슬라이드 게이트밸브의 열구조해석 및 ASME B&PVC 기반 피로수명 평가)

  • Kim, Tae Ho;Choi, Jae Seung;Han, Jeong Sam
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.41 no.2
    • /
    • pp.157-164
    • /
    • 2017
  • A parallel slide gate valve (PSGV) is located between the heat recovery steam generator (HRSG) and the steam turbine in a combined cycle power plant (CCPP). It is used to control the flow of steam and runs with repetitive operations such as startups, load changes, and shutdowns during its operation period. Therefore, it is necessary to evaluate the fatigue damage and the structural integrity under a large compressive thermal stress due to the temperature difference through the valve wall thickness during the startup operations. In this paper, the thermal-structural analysis and the fatigue life evaluation of a 16-inch PSGV, which is installed on the HP steam line, is performed according to the fatigue life assessment method described in the ASME B&PVC VIII-2; the method uses the equivalent stress from the elastic stress analysis.

Study on Safety Design of Vertical-Type Heat Recovery Steam Generator Based on Large-Scale Analysis (대규모해석을 활용한 수직형 배열회수 증기발생기의 안전설계에 관한 연구)

  • Ryu, Tae-Young;Yang, Sang-Mo;Jang, Hyun-Min;Choi, Jae-Boong;Myung, Ki-Chul;Lee, Dong-Yun;Choi, Shin-Beom
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.36 no.12
    • /
    • pp.1535-1542
    • /
    • 2012
  • A Heat Recovery Steam Generator(HRSG) is the main component of a Combined Cycle Power Plant(CCPP). It is a very large structure that is made from relatively thin metal sheets. Therefore, the structural integrity of an HRSG is very important to ensure safe operation during plant lifetime. In particular, thermal deformation and thermal fatigue have been revealed as the main causes of the mechanical degradation of an HRSG. In order to prevent unexpected damage, safety evaluation based on a large-scale analysis is necessary. Therefore, this study aims to improve the safety of HRSG by using Finite Element Analysis(FEA) results derived from large-scale analysis. Furthermore, the modified design is verified by comparing it with the original one. This result will be used as basic data for improving the safety of a vertical-type HRSG.

Reduction of the Flow Accelerated Corrosion within Low Pressure Evaporator Connection Pipe by Interception of Hydrazine for Water Treatment (탈산소제 차단 수처리에 의한 배열회수보일러 저압증기발생기 연결배관내의 유동가속부식 저감)

  • Son, Byung-Gwan;Lee, Jae-Heon
    • Plant Journal
    • /
    • v.9 no.4
    • /
    • pp.26-30
    • /
    • 2013
  • Based on case that HRSG low pressure steam generator tube was damaged by FAC in 500 MW A CCPP. This case analyzed the effect of application about the block of hydrazine water treatment which is applied for increasing dissolved oxygen. And also try to deduce the major factor of FAC Which is caused by lacking of dissolved oxygen of boiler feed system. After 1 year of water treatment, the figure of dissolved oxygen in the boiler feed water has increased from 0.15 ppb to 3~5 ppb and the figure of oxidation reduction potential has increased from -245 mV to 170 mV. And Iron content, the corrosion products by FAC has decreased from 18.5 ppb to 5~7 ppb. According to the result of experiment, we could able to confirm that the interception of hydrazine of water treatment is effective to reduce FAC.

  • PDF

Risk Assessment Technique for Gas Fuel Supply System of Combined Cycle Power Plants (I) : Based on API RBI Procedures (복합화력발전의 가스연료 공급계통에 대한 위험도 평가 기법 연구 (I) : API RBI 절차에 기반한 위험도 평가)

  • Song, Jung Soo;Yu, Jong Min;Han, Seung Youn;Choi, Jeong Woo;Yoon, Kee Bong
    • Journal of Energy Engineering
    • /
    • v.27 no.2
    • /
    • pp.1-13
    • /
    • 2018
  • The proportion of natural gas-fueled power generation is expanding due to the change of domestic energy policy pursuing reduction of dust and increasing clean energy consumption. Natural gas fuels used for the combined-cycle power plants and the district-heating power plants are operated at high temperature and high pressure in the fuel supply system. Accidents due to leakage of the gas such as fire and explosion should be prevented by applying risk management techniques. In this study, risk assessment was performed on the natural gas fuel supply system of a combined power plant based on the API RP 581 RBI code. For the application of the API RBI code, lines and segments of the evaluation target system were identified. Operational data and input information were analyzed for the calculations of probability of failure and consequence of failure. The results of the risk assessment were analyzed over time from the initial installation time. In the code-based evaluation, the gas fuel supply system was mainly affected by thinning, external damage, and mechanical fatigue damage mechanisms. As the operating time passes, the risk is expected to increase due to the external damage caused by the CUI(Corrosion Under Insulation).

Hydraulic and Numerical Model Experiments of Flows in Circulation-Water-Pump Chambers (순환수취수펌프장 내의 흐름에 대한 수리 및 수치모형실험)

  • Yi, Yong-Kon;Cheong, Sang-Hwa;Kim, Chang-Wan
    • Journal of Korea Water Resources Association
    • /
    • v.38 no.8 s.157
    • /
    • pp.631-643
    • /
    • 2005
  • The objective of this study is to perform hydraulic and numerical model experiments of the flows in circulation-water-pump(CWP) chambers of combined cycle power plants (CCPP) to be built and to suggest improvement plans if the flows might cause a serious problem on the operation of CWPs. Hydraulic model was constructed in a scale of 1 to 20 using acrylic sheets and a two dimensional numerical model used was RMA2. To evaluate results of Hydraulic and numerical model experiments, evaluation criteria of flow conditions in the intake canal and CWP chambers were determined. Vertical vorticities obtained from numerical simulations for the initial plan of CCPPs were qualitatively compared with results of hydraulic model experiments and the formation possibility of a large scale vortex, one of the flow evaluation criteria, was evaluated. The initial plan was found not to satisfy the flow evaluation. Nine improvement plans were devised and numerically simulated. Four alternative plans among nine improvement plans were selected and hydraulically experimented. On the ground of the results of hydraulic model experiments, a final improvement plan, one of four improvement plants, was suggested. When CWP chambers and intake canals were designed with spatial constraints, flow separating wall and guide walls were found to improve flow conditions in CWP chambers.