• Title/Summary/Keyword: CBM

Search Result 230, Processing Time 0.026 seconds

Probabilistic approach to time varying Available Transfer Capability calculation (확률론적 기법을 이용한 시변 ATC 용량 결정)

  • Shin Dong Joon;Lee Jun Kyung;Lee Hyo Sang;Kim Jin O;Chung Hyun Soo
    • Proceedings of the KIEE Conference
    • /
    • summer
    • /
    • pp.645-647
    • /
    • 2004
  • According to NERC definition, Available Transfer Capability (ATC) is a measure of the transfer capability remaining in the physical transmission network for the future commercial activity To calculate ATC, accurate and defensible TTC, CBM and TRM should be calculated in advance. This paper proposes a method to quantify time varying ATC based on probabilistic approach. The uncertainties of power system and market are considered as complex random variables. TRM with the desired probabilistic margin is calculated based on PLF analysis, and CBM is evaluated using LOLE of the system. Suggested ATC quantification method is verified using IEEE RTS with 72 bus. The proposed method shows efficiency and flexibility for the quantification of ATC.

  • PDF

Numerical Simulation of Ozone Concentration using the Local Wind Model in Pusan Coastal Area, Korea (부산연안역에서 국지풍모델을 이용한 오존농도의 수치모의)

  • Jeon, Byung-Il;kim, Yoo-Keun;Lee, Hwa-Woon
    • Journal of Environmental Science International
    • /
    • v.6 no.4
    • /
    • pp.335-350
    • /
    • 1997
  • Numerical simulations of photochemical air pollution (CBM: Carbon-Bond Mechanisms under a theoretical three-dimensional local wind system are carried to clarify the fundamental characteristics of the effects of local wind on photochemical air pollution. According to the AWS data of Pusan coastal area and KMA, the surface wind of Pusan during summertime showed a very remarkable land and sea breeze circulation. The ozone concentration distribution using local wind model showed that high ozone concentration zone near coastal area moved toward inland In the afternoon. This change implies a sea breeze Increases the ozone concentration, but a land breeze decreases it in Pusan coastal area.

  • PDF

Quality Control System Based on Cbm in Injection Molding Product (CBM 기반의 사출품 품질 관리 시스템)

  • Park, Hong-Seok;Kim, Jong-Su
    • Transactions of the Korean Society of Machine Tool Engineers
    • /
    • v.18 no.2
    • /
    • pp.178-186
    • /
    • 2009
  • Most of automotive plastic parts are injection molding products. Inspection of total product is impossible, because number of product to inspect is too many and various. Condition-based Monitoring was proposed to decrease cost and time for inspecting. In this research, a system that predicts quality of part at fabrication point of time, and confirms informations through the internet was developed. Cavity sensors were installed inside of mold, and gathered signals as measuring, and through this process Sensor-based Monitoring system can be observed manufacturing of a part. Monitoring system transmits signals to client through the internet, and finally developed system provides manufacturing informations and predictions of quality as web-based monitoring.

On condition based maintenance policy

  • Shin, Jong-Ho;Jun, Hong-Bae
    • Journal of Computational Design and Engineering
    • /
    • v.2 no.2
    • /
    • pp.119-127
    • /
    • 2015
  • In the case of a high-valuable asset, the Operation and Maintenance (O&M) phase requires heavy charges and more efforts than the installation (construction) phase, because it has long usage life and any accident of an asset during this period causes catastrophic damage to an industry. Recently, with the advent of emerging Information Communication Technologies (ICTs), we can get the visibility of asset status information during its usage period. It gives us new challenging issues for improving the efficiency of asset operations. One issue is to implement the Condition-Based Maintenance (CBM) approach that makes a diagnosis of the asset status based on wire or wireless monitored data, predicts the assets abnormality, and executes suitable maintenance actions such as repair and replacement before serious problems happen. In this study, we have addressed several aspects of CBM approach: definition, related international standards, procedure, and techniques with the introduction of some relevant case studies that we have carried out.

Calculation of CBM, TRM and ATC using Quadratic Function Approximation (이차함수 근사화를 이용한 가용송전용량과 송전신뢰 및 설비편익 여유도 산정)

  • 이효상;신상헌;신동준;김진오
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.53 no.5
    • /
    • pp.296-301
    • /
    • 2004
  • The Available Transfer Capability (ATC) is defined as the measure of the transfer capability remaining in the physical transmission network for further commercial activity above already committed uses. Available Transfer Capability (ATC) calculation is a complicated task, which involves the determination I of total transfer capability (TTC), transmission reliability margin (TRM) and capability benefit margin (CBM). As the electrical power industry is restructured and the electrical power exchange is updated per hour, it is important to accurately and rapidly quantify the available transfer capability (ATC) of the transmission system. In ATC calculation,. the existing CPF method is accurate but it has long calculation time. On the contrary, the method using PTDF is fast but it has relatively a considerable error. This paper proposed QFA method, which can reduce calculation time comparing with CPF method and has few errors in ATC calculation. It proved that the method can calculate ATC more fast and accurately in case study using IEEE 24 bus RTS.

Calculation of TRM and CBM for Electricity Market Restructuring (전력 산업 구조 개편 상황에서 적정 송전 용량 여유도 산정)

  • Shin, Sang-Hun;Shin, Dong-Joon;Kim, Jin-O;Lee, Hyo-Sang
    • Proceedings of the KIEE Conference
    • /
    • 2003.11a
    • /
    • pp.429-431
    • /
    • 2003
  • Available Transfer Capability(ATC) calculation is a complicated task, which involves the determination of TTC, TRM, and CBM. This paper proposed QFA method, which can reduce the calculation time comparing with CPF method and has few errors in ATC calculation. It proved that the method can calculate ATC more fast and accurately in the case study using IEEE 24 bus RTS(MRTS).

  • PDF

자율운항선박 CBM 보조기기 및 배관 상태 모니터링 및 고장 진단 SW 연구

  • 김미나;박순호;서종희
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2021.11a
    • /
    • pp.212-213
    • /
    • 2021
  • 자율운항선박 기술개발사업 중 2세부(자율운항선박 핵심 기관시스템 성능 모니터링 및 고장예측 진단 기술 개발) 과제는 자율운항선박의 추진 및 전력 생산을 담당하는 핵심 기관시스템의 운전 상태를 실시간 모니터링하여, 계측 데이터 기반의 고장 진단/예측을 수행하고 장애 발생 시 원격 지원체계를 통해 체계적/전문적 정비를 수행할 수 있도록 지원하는 기술이다. 자율운항선박은 선원이 없이 자율적으로 운항도 하지만, 핵심장비/기자재에 대해서도 실측 데이터를 기반으로 스스로 판단하여 고장여부에 대한 의사결정이 가능하여야 한다. 선박 기관시스템은 선박 운항의 안전과 정시 입·출항에 핵심이 되는 장비/기자재로써 자율운항선박 구현에 필요한 핵심 기술이다. 본 연구에서는 자율운항선박 핵심장비 중 보조기기 2종(Pump, Purifier), 배관(Seawater Pipe, Steam Pipe)의 성능 모니터링 및 고장예측/진단 소프트웨어를 개발하기 위한 연구를 수행한다.

  • PDF

상태기반보전 기술 동향

  • Mun, Byeong-Min;Lee, Jin-Uk;Bae, Seok-Ju
    • Journal of the KSME
    • /
    • v.56 no.11
    • /
    • pp.41-45
    • /
    • 2016
  • 이 글에서는 대규모 시스템의 상태기반보전(CBM: condition-based maintenance)에 대한 최근 기술 동향을 소개하고자 한다.

  • PDF

A Study on the Development of Maintenance System for Equipment of LNG-FPSO Ship (LNG-FPSO 선박 장비들의 보전활동 지원시스템 개발에 관한 연구)

  • Lee, Soon-Sup;Kang, Donghoon;Lee, Jong-Hyun;Lee, Seung-Jun
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.22 no.2
    • /
    • pp.233-239
    • /
    • 2016
  • In this paper, a maintenance system is developed for LNG-FPSO topside and hullside equipment based CBM (Condition Based Maintenance) methodology. First, the development system defined the PWBS(Product Work Breakdown Structure) of major equipment of LNG-FPSO. Second, the development system developed the failure analysis, economic evaluation for optimal maintenance plan and database systems that save and manage information about equipment, failure mode, failure rate and failure cause. Finally, the verification of the development system was applied to the inlet system of topside and the pump tower system of hullside and the system was confirmed the effectiveness of CBMS(Condition Based Maintenance System).

Development of Korean Condition Based Maintenance Systems to Monitor Naval Weapon Systems (해군 무기체계 한국형 상태진단시스템 발전방향 연구)

  • Oh, Kyungwon
    • Journal of Aerospace System Engineering
    • /
    • v.10 no.4
    • /
    • pp.67-74
    • /
    • 2016
  • The primary aim for using a Korean Condition Based Maintenance (CBM) system is to maintain military operational readiness using Interactive Collection Analysis Systems (ICAS) installed on naval vessels. Other aims are to preemptively provision maintenance and supply functions, to guarantee economical management of logistical assets, and to implement data driven equipment life cycle management. In order to accomplish these aims, it is necessary to establish standard system conditions. However, because manufacturers do not provide the technology necessary for maintenance management, it is required to retain component performance maps for each piece of equipment, and to accumulate data about frequently occurring fault patterns. This study confirms the validity of component performance maps using micro gas turbines and provides accumulated data on machine break downs. This would allow real time equipment performance checks and present performance trends. Then analysis would provide solutions for maintaining the best machine operating conditions with detailed maintenance manuals for operators. This study is a basis for further research to investigate additional ways to develop CBM using data obtained from naval vessels used in actual military operations.