• Title/Summary/Keyword: Business Process Scheduling

Search Result 70, Processing Time 0.028 seconds

Implementation of TOC/DBR under Six Sigma environment (6 시그마 환경에서의 TOC/DBR 구현)

  • 고시근;구평회;하재원;권혁무;김동준
    • Journal of Korean Society for Quality Management
    • /
    • v.32 no.2
    • /
    • pp.154-167
    • /
    • 2004
  • The TOC/DBR and Six Sigma are the most attention-getting concepts for managing manufacturing companies in Korea. Using the ideas and methods of the TOC/DBR, companies can achieve a large reduction of work-in-process and finished-good inventories, significant improvement in scheduling performance, and substantial earnings increase. The Six Sigma approach derives the overall process of selecting the right projects based on their potential to improve performance metrics and selecting/training the right people to get the business results. These two concepts have different backgrounds and different viewpoints for production systems. So, if the two concepts collaborate each other, the synergy effects to innovate production systems can be expected. This paper proposes a new approach to implement the TOC/DBR concepts in production systems. This approach uses some concepts of Six Sigma which stresses educations, project approaches (step by step procedure using a Roadmap), and improvement philosophy.

The Evaluation of the Validity of Equipment-replacing Alternatives in Consideration of the Differences of Cost Flow (비용 흐름의 차이를 고려한 교체 설비 대안에 대한 타당성 평가)

  • 김성집;박흥석
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.17 no.31
    • /
    • pp.99-114
    • /
    • 1994
  • The introduction of new equipments to strengthen the competitiveness of enterprises is one of pretty important factors. Enterprises introducing new equipments strengthen competitiveness through productivity increasing, high quality maintenance, inventory reduction, improved design and production interface, simple scheduling process, low scrap rate, rework reduction, etc. Managers will work out the best equipment-replacing strategy through the appropriate combination of potential cost attributes and qualitative attributes difficult to quantify in accordance with the business purpose. This study is to present a method to select an equipment-replacing alternative through the decision-making model of Analytic Hierarchy Process in consideration of the differences of cost flow of the alternatives, taking into consideration tangible attributes and strategic intangible attributes.

  • PDF

on the Integration Strategy of TOC and Six Sigma (TOC와 6시그마의 통합 전략)

  • Bae Young Ju
    • Journal of the Korea Safety Management & Science
    • /
    • v.7 no.3
    • /
    • pp.121-135
    • /
    • 2005
  • The TOC and Six Sigma are the most attention-getting concepts for managing manufacturing companies. Using the ideas and methods of the TOC, companies can achieve a large reduction of work-in-process and finished good inventories, significant improvement in scheduling performance, and substantial earnings increase. The six sigma approach derives the overall process of selecting the right project based on their potential to improve performance metrics and selecting and training the right people to get the business results. These two concepts have different backgrounds and different viewpoints for production systems. so, if the two concepts integrate each other, the synergy effects to innovate production systems can be expected. The purpose of this paper suggest that integration strategy between Six Sigma and TOC for profit maximization.

A Preliminary Study for Deriving Subjects of MOT Method Based on the Utilization Status in Korea Enterprises (기업활용수준을 반영한 기술경영 연구방법론 교과도출을 위한 사전연구)

  • Lee, Jae-Ha;Na, Won-Shik
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.35 no.2
    • /
    • pp.212-219
    • /
    • 2012
  • This study focus on what methods of MOT are needed and utilized to solve a technical problem in the MOT leading company. We first classified the MOT methods by project life cycle and R&D job quality based on the several discussion with working group. In order to study, the survey was carried out by 168 experts working on MOT practices. Our main research findings are as follows. The level of utilized MOT methods was above average because MOT sector was beginning to represent an increasing share of total R&D business. But the satisfaction level on the MOT majors was below average. The more utilized MOT methods in practices were 'environment analysis and opportunity research,' 'business feasibility,' 'roadmapping,' 'portfolio,' 'technology tree,' 'scheduling,' 'risk management,' 'six sigma,' 'design of experiment,' 'quality control,' 'cost analysis' etc. And the subjects of product realization process were also needed to MOT practice such as 'design for reliability,' 'design for cost,' 'design for performance,' 'design for safety' deeply involved to product quality. Finally, the capability requested to University students were 'problem define and solving,' 'technology planning and strategy,' 'creative thinking.'

Integrated Supply Chain Model of Advanced Planning and Scheduling (APS) and Efficient Purchasing for Make-To-Order Production (주문생산을 위한 APS 와 효율적 구매의 통합모델)

  • Jeong Chan Seok;Lee Young Hae
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2002.05a
    • /
    • pp.449-455
    • /
    • 2002
  • This paper considers that advanced planning and scheduling (APS) in manufacturing and the efficient purchasing where each customer order has its due date and multi-suppliers exit We present a Make-To­Order Supply Chan (MTOSC) model of efficient purchasing process from multi-suppliers and APS with outsourcing in a supply chain, which requires the absolute due date and minimized total cost. Our research has included two states. One is for efficient purchasing from suppliers: (a) selection of suppliers for required parts; (b) optimum part lead­time of selected suppliers. Supplier selection process has received considerable attention in the business­management literature. Determining suitable suppliers in the supply chain has become a key strategic consideration. However, the nature of these decisions usually is complex and unstructured. These influence factors can be divided into quantitative and qualitative factors. In the first level, linguistic values are used to assess the ratings for the qualitative factors such as profitability, relationship closeness and quality. In the second level a MTOSC model determines the solutions (supplier selection and order quantity) by considering quantitative factors such as part unit price, supplier's lead-time, and storage cost, etc. The other is for APS: (a) selection of the best machine for each operation; (b) deciding sequence of operations; (c) picking out the operations to be outsourcing; and (d) minimizing makespan under the due date of each customer's order. To solve the model, a genetic algorithm (GA)-based heuristic approach is developed. From the numerical experiments, GA­based approach could efficiently solve the proposed model, and show the best process plan and schedule for all customers' orders.

  • PDF

An Efficient Genetic Algorithm for the Allocation and Engagement Scheduling of Interceptor Missiles (효율적인 유전 알고리즘을 활용한 요격미사일 할당 및 교전 일정계획의 최적화)

  • Lee, Dae Ryeock;Yang, Jaehwan
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.2
    • /
    • pp.88-102
    • /
    • 2016
  • This paper considers the allocation and engagement scheduling problem of interceptor missiles, and the problem was formulated by using MIP (mixed integer programming) in the previous research. The objective of the model is the maximization of total intercept altitude instead of the more conventional objective such as the minimization of surviving target value. The concept of the time window was used to model the engagement situation and a continuous time is assumed for flying times of the both missiles. The MIP formulation of the problem is very complex due to the complexity of the real problem itself. Hence, the finding of an efficient optimal solution procedure seems to be difficult. In this paper, an efficient genetic algorithm is developed by improving a general genetic algorithm. The improvement is achieved by carefully analyzing the structure of the formulation. Specifically, the new algorithm includes an enhanced repair process and a crossover operation which utilizes the idea of the PSO (particle swarm optimization). Then, the algorithm is throughly tested on 50 randomly generated engagement scenarios, and its performance is compared with that of a commercial package and a more general genetic algorithm, respectively. The results indicate that the new algorithm consistently performs better than a general genetic algorithm. Also, the new algorithm generates much better results than those by the commercial package on several test cases when the execution time of the commercial package is limited to 8,000 seconds, which is about two hours and 13 minutes. Moreover, it obtains a solution within 0.13~33.34 seconds depending on the size of scenarios.

A Study on Database System for Hostorical Booking of Korean Railroad (한국철도의 예약실적 데이터베이스 시스템에 관한 연구)

  • Oh, Seog-Moon;Hwang, Jong-Gyu;Hyeon, Seung-Ho;Kim, Yong-Gyu;Lee, Jong-Woo;Kim, Young-Hoon;Hong, Soon-Heum;Park, Jong-Bin
    • Proceedings of the KIEE Conference
    • /
    • 1998.07a
    • /
    • pp.371-374
    • /
    • 1998
  • The construction of the transportation history database system is to serve the scheduling and seat inventory controling. Recently, lots of countries have been faced with the advance era because of the new railway transportation system, like the high speed railway and/or magnetic levitation vehicle system. This can be reasonably translated as those of operators are willing to provide the more various and high quality schedule to the customer. Those operators these ideas make possible to forecast that scheduling process is going to be complicated more and more. The seat inventory control, so to speak Yield Management System(YMS), goes a long way to improve the total passenger revenue at the railway business. The YMS forecasts the number of the last reservation value(DCP# END) and recommends the optimal values on the seat sales. The history database system contains infra-data(ie, train, seat, sales) that will be the foundation of scheduling and seat inventory control application programs. The development of the application programs are reserved to the next step. The database system is installed on the pc platform (IBM compatible), using the DB2(RDBMS). And at next step, the platform and DBMS will be considered whether they can meet the users' requirement or not.

  • PDF

Development of production planning system for shipbuilding using component-based development framework

  • Cho, Sungwon;Lee, Jong Moo;Woo, Jong Hun
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.13 no.1
    • /
    • pp.405-430
    • /
    • 2021
  • Production planning is a key part of production management of manufacturing enterprises. Since computerization began, modern production planning has been developed starting with Material Requirement Planning (MRP), and today Enterprise Resource Planning (ERP), Advanced Planning and Scheduling (APS), Supply Chain Management (SCM) has been spreading and advanced. However, in the shipbuilding field, rather than applying these general-purpose production planning methodologies, in most cases, each shipyard has developed its own production planning system. This is because the applications of general-purpose production planning methods are limited due to the order-taking industry such as shipbuilding with highly complicated construction process consisting of millions of parts per ship. This study introduces the design and development of the production planning system reflecting the production environment of heavy shipyards in Korea. Since Korean shipyards such as Hyundai, Daewoo and Samsung build more than 10 ships per year (50-70 ships in the case of large shipyards), a planning system for the mixed production with complex construction processes is required. This study draws requirements using PI/BPR (process innovation and business process reengineering) methodology to develop a production planning system for shipyards that simultaneously build several ships. Then, CBD software development methodology was applied for the design and implementation of planning system with drawn requirements. It is expected that the systematic development procedure as well as the requirements and functional elements for the development of the shipyard production planning system introduced in this study will be able to present important guidelines in the related research field of shipbuilding management.

A Survey of the Modeling of the Production Planning and Scheduling in an Integrated Steel Mill (일관제철소 생산계획 및 일정계획 모형에 관한 조사연구)

  • Seong, Deokhyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.11
    • /
    • pp.263-281
    • /
    • 2017
  • Global optimization that considers the processes at integrated steel mills is more important than the local optimization to improve the efficiency of a single process. Research utilizing mathematical models at integrated steel mills predominantly focus on solving problems solely for a specific process or focusing on what techniques are applied to. However, it is important to define the problems that must be solved at the steelworks, identify the objectives and constraints that can be modeled, and selection of methodologies that can be applied to the problems. The purpose of this study is to investigate the problems in improving efficiency at integrated steel mills from the viewpoint of production & operations management. We review the research have been conducted in order to solve those problems. We classified the research into 6 categories and suggested future research direction based on the global optimization. It is expected that research themes for improving the efficiency at integrated steel mills will be derived.

Airport Security Process Improving for Advanced Operation and Smart Airport Framework Design (공항 운영 효율성 향상을 위한 보안검색 프로세스 개선 및 스마트 공항 프레임워크 설계)

  • Lee, Jaewhan;Im, Hyeonu;Sohn, Seichang;Ko, Seungyoon;Hong, Ki-Sung;Choi, Sanggyun;Seo, Sangwon;Lee, Chulung
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.39 no.2
    • /
    • pp.129-134
    • /
    • 2013
  • The airport processes are restricted by some limits of performance objects as size of airport, ability of human resources, capacity of facilities and operational rules. These limitations make passenger handling difficult when passenger numbers increase. In order to solve this problem, we modeled the airport process and analyzed departure passenger arrival, scheduled security manpower under specific customer service level maintenance with mixed integer programming and validate the efficiency with simulation with adapting smart airport framework. We concluded that the airport management with information techniques can reduce waiting time within security and immigration process.