• Title/Summary/Keyword: Business Process Improvement Projects

Search Result 79, Processing Time 0.024 seconds

The Development of Risk Management Process Model during Bidding Phase for Success of Oversea Construction Projects (성공적 해외건설사업을 위한 입찰단계의 리스크 관리 프로세스 모델 개발 - 발전 플랜트 EPC 사업을 중심으로 -)

  • Seo, Jae-Pil;Ryu, Han-Guk;Son, Bo-Sik;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.4
    • /
    • pp.76-86
    • /
    • 2016
  • Recently, the Contracts of International Construction Business has been decreased from the beginning of 2015 in Korea, although it has been steadily increased until 2014. This trend could be caused by Low-Price Contracts, the lack of Know-how and experience in operating, the poor management of Claims and Low-Profitability in Business. It has been recognized that the qualitative improvement of Business Contacts are necessary for successful Projects. In the Bidding Process, therefore, Experience data as In-House Data and Lessons Learned for projects should be strategically involved to assure riskless offers. Accordingly the Proposal Process are needed to be organized and enhanced by including processes for risks review about technical, marketing and commercial part during the bidding. This paper proposes a Risk Management Process model during Bidding Phase, using Risk Evaluation Method through the project life-cycle. The Concept of Model is to define CSF (Critical Success Factor) in the bidding process and Risk Factors are linked to CSF and Organization based on RAM (Responsibility assignment matrix).

A Study in the Review and Progressive Strategies of Smart Village in Rural Areas (농어촌지역 스마트빌리지 사업의 고찰과 추진방향)

  • Nam, Yun-Cheol
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.25 no.1
    • /
    • pp.17-24
    • /
    • 2023
  • There are various issues in rural areas. There are population decline, aging, and the absence of jobs and amenities. The government continues to expand various projects for rural areas. Recently, the government is promoting smart village projects in farming and fishing villages. The purpose of smart village is safety, convenience, smartization, and productivity improvement. The purpose of this study is to investigate the project and implementation process of smart villages, and domestic and foreign cases. And it classifies smart villages and suggests implementation strategies. The conclusion is as follows. ①The smart village business focuses on safety, living convenience, facility smartization, and agriculture and fisheries. ②In overseas cases, the smart village project focuses on improving the residential environment of farming and fishing villages in the EU, the UK, and Germany. Japan focuses on improving energy and agricultural and fisheries productivity. ③It is recommended that the smart village business be subdivided and promoted as much as possible. And the project enhances synergy in cooperation with other government ministries. ④Smart services increase credibility through FGI for public officials and residents. ⑤The project is carried out in consideration of agricultural products, tourism festivals, natural environment, history and tradition.

Front End Engineering and Design (FEED) for Project Management of Thermal Power Plant Construction

  • KIM, Namjoon;JUNG, Youngsoo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.415-419
    • /
    • 2015
  • Engineering is a value-adding process applying knowledge and skills in the construction industry that includes the planning, feasibility study, project management (PM), front end engineering and design (FEED), detail design, procurement, construction, supervision, and operation. Among these engineering activities, FEED is defined as a comprehensive design practice in the early design phase focused on conceptual design and basic design. It is a particularly influencing area that determines the competitiveness of procurement and construction capability of construction firms (KNIN 2013). Nevertheless, previous studies in FEED have been limited to the design process, deliverable, or particular management technique (e.g. system engineering, collaboration, information etc.). In this context, the purpose of this study is to propose a comprehensive FEED business process structure for project management of thermal power plant construction projects encompassing the entire project life cycle. And an assessment methodology for FEED functions was developed. It is expected that the proposed structure of FEED functions and FEED evaluation methodology will contribute to improvement of competitive capability of engineering, procurement, and construction (EPC) companies.

  • PDF

SW Process improvement and Organization Change Management (SW 프로세스개선과 조직 변화관리)

  • Kim, Seung-Gweon;Jo, Sung-Hyun;Yoon, Joong-Soo
    • Journal of the Korea Society of Computer and Information
    • /
    • v.18 no.2
    • /
    • pp.127-140
    • /
    • 2013
  • We explored the relationship between the level of change awareness and deployment of software process improvement (SPI) approaches using a competing values framework. To measure awareness level of organization's change, we used DICE framework provides means for predicting the outcome of change management initiatives. The four factors for organizaton's change: duration, integrity, commitment, and effort are evaluated and a score is calculated. The DICE(R) score is used to classify projects into win, worry, or woe zones. In this paper, we apply the DICE(R) score as an independent variable to predict the outcome of a software process improvement. Our results indicated that the Organization have a higher chance of success have the better outcome in software process improvement.

Causes of Change Orders in the Military Facility Construction Projects and Suggestions for Improvement (군사시설 건설사업의 설계변경 요인분석 및 개선방향)

  • Lee, Kyoung-Han;Choi, Jong-Soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.3
    • /
    • pp.263-271
    • /
    • 2013
  • Change orders have been widespread in both the private and public construction sectors. In particular, in the case of G2B (Government to Business) contracts, adjustment of contract price and/or schedule extension is a frequent occurrence due to change orders. To uncover the causes of change orders and suggest an appropriate strategy, this study analyzed 296 cases of change orders in military facility construction projects from 2008 to 2010. The analysis revealed that the major causes of change orders are users' additional requirements (28.38%), a change of finishing materials (23.99%), and change of footing type (17.57%), in that order. Building on the results of this analysis, the authors suggest plans for practical improvements. Specific recommendations include 1) reflect user requirements at the early stage, 2) minimize the use of additional budget due to change orders, and 3) reduce the process and time for contract amendment, among others. The results of this study may provide significant implications to those involved in military construction projects, particularly project owners (i.e., the Ministry of Defense) and contractors.

Korea waterworks intergration promotion plan based on case analysis (수도사업 통합 사례 분석을 통한 수도사업 통합 추진 방안)

  • Kim, Kyunglok;Kim, Younghee
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.36 no.5
    • /
    • pp.275-287
    • /
    • 2022
  • In order to overcome the small scale of Korea waterworks and to achieve comprehensive improvement and innovation transformation, the waterworks integration was reviewed. The effect of consolidation was confirmed by the integration of the water supply business in the southern Gangwon region and the western Gyeongnam region in Korea, such as an increase in the flow rate and a decrease in the production unit cost. After facing management and service limitations overseas, more than 1,000 small-scale waterworks projects in the UK were integrated into 27 waterworks providers, and Japan also revised the Waterworks Act in December 2019 and is in the process of integrating waterworks. It is considered appropriate to promote the integration of waterworks projects in Korea by respecting the autonomy of local governments, but using a participatory method, a win-win method, and a linkage method. For the integration of waterworks projects, three strategies are proposed: First creating a national foundation for integration (revision of the Waterworks Act), Second establishing a waterworks integration strategy led by local governments, Third forming an external consensus and providing incentives for participation.

Study on the Prioritization of Improvement Plan for Road Traffic Safety Projects for Business Vehicles by the Introduction of Autonomous Vehicles (자율주행자동차 도입에 따른 사업용 차량 도로교통 안전사업 개선방안 우선순위 선정 연구)

  • Park, Sangmin;Jeong, Harim;Lee, Seungjun;Park, Sujung;Nam, Doohee;Yun, Ilsoo
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.16 no.3
    • /
    • pp.1-14
    • /
    • 2017
  • Recently, the automobile industry is rapidly changing due to autonomous vehicles based on advanced ICT technology. As a result, studies related to autonomous vehicles have also been actively conducted. However, most studies are focusing on the autonomous driving technology so that the prediction of changes in road traffic safety and associated legal system due to the introduction of autonomous vehicles are lacking. The purpose of this study is to suggest improvement methods and priorities of road traffic safety projects according to the introduction of autonomous vehicles. As a result of the AHP analysis using the results of the questionnaire surveyed for autonomous driving car experts, it was analyzed that revision of the traffic safety inspection law and development of education system for autonomous driving motor drivers and operators should be given top priority.

On the CMMI-Based Development of SE & PM Integration Process Architecture (CMMI 기반 시스템공학과 프로젝트관리 통합 프로세스 아키텍처 개발)

  • CHOI, Young-Gil;Jung, Ho-Jeon;Lee, Jae-Chon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.6
    • /
    • pp.4137-4146
    • /
    • 2015
  • The scale and required functionality of modern systems have increased and become more complicated. To successfully carry out the systems development projects, appropriate systems engineering (SE) and project management (PM) activities are required for the underlying process. In a system development organization, it is an effort to secure the SE & PM capability by adopting the CMMI is an evaluation model of improvement and ability of SE&PM process. To achieve the goal each organization establishes and uses its own organizational standard process, which satisfies the business characteristics. However, in practice, due to the lack of sufficient understanding on the interrelationship among different CMMI process areas, there still exist some difficulties with constructing organization processes. In systems development, the activities of SE are closely related with those of PM. Thus, the processes of SE and PM need to be fully integrated and explicitly linked to each other in order to complete the projects successfully. In this paper, we propose a SE&PM integration process architecture of organization that can be utilized in the system development organization is referenced in the construction of CMMI-based organizational process.

An International Index for Customer Satisfaction in the Construction Industry

  • Othman, Ayman Ahmed Ezzat
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.4
    • /
    • pp.17-32
    • /
    • 2014
  • In a competitive business environment, like construction, achieving customer satisfaction has been identified as an important element for measuring project's success and sustaining competitive advantage. Traditionally, customers were expelled from the product development process. Little effort was done, in the past to identify the factors that lead to customer satisfaction and hence, use them for product improvement. Organizations that adopted that approach, encountered the risk of losing their customers. In construction, end-users of governmental housing projects were excluded from the design decision making process and accordingly, their requirements were not reflected in design. Although a number national customer satisfaction indices and barometers have been developed worldwide, they have their own limitations and shortcomings. This paper aims to develop an international index for customer satisfaction in the construction Industry. For the first time in construction literature, this research identified, validated and classified 45 drivers for achieving customer satisfaction in the construction industry.

Study on Rural Living Environment and Satisfaction by Improving Rural Hosing Renewal Project (농촌주거환경개선사업에 따른 농촌주거환경실태와 주민만족도)

  • Kim, Sang-Bum;Cho, Soon-Jae;Kang, Bang-Hum;Kim, Hye-Min
    • Journal of Korean Society of Rural Planning
    • /
    • v.9 no.3 s.20
    • /
    • pp.9-16
    • /
    • 2003
  • The aim of this study is to analyze the improvement of housing renewal project and suggest the conditions of rural housing environment filled with the resident's desire, requirements concerning about characteristics of a rural environment and temporal and social requirements. The project for improvement of rural housing environment has been executed in a few ways: reform of the rural housing environment and the development of territories for settlement of a desolate region. To analyze and assess the accomplishments, we considered codes and process related to the project for improvement of rural housing environment and analyzed present conditions and problems through many reference books and administrative data. According to these results, devices in future business for improvement of rural housing environment are as follows; It should required a rational allocation of working space, living space, cultural activity space suitable for rural area characteristics and changed into uniformed system in various projects governed by different institutions.