• Title/Summary/Keyword: Buildings reconstruction

Search Result 146, Processing Time 0.02 seconds

Reconstruction of Buildings from Satellite Image and LIDAR Data

  • Guo, T.;Yasuoka, Y.
    • Proceedings of the KSRS Conference
    • /
    • 2003.11a
    • /
    • pp.519-521
    • /
    • 2003
  • Within the paper an approach for the automatic extraction and reconstruction of buildings in urban built-up areas base on fusion of high-resolution satellite image and LIDAR data is presented. The presented data fusion scheme is essentially motivated by the fact that image and range data are quite complementary. Raised urban objects are first segmented from the terrain surface in the LIDAR data by making use of the spectral signature derived from satellite image, afterwards building potential regions are initially detected in a hierarchical scheme. A novel 3D building reconstruction model is also presented based on the assumption that most buildings can be approximately decomposed into polyhedral patches. With the constraints of presented building model, 3D edges are used to generate the hypothesis and follow the verification processes and a subsequent logical processing of the primitive geometric patches leads to 3D reconstruction of buildings with good details of shape. The approach is applied on the test sites and shows a good performance, an evaluation is described as well in the paper.

  • PDF

An Analysis on the Actual Condition and the Influential Factors in Reconstruction Projects for Deteriorated Apartment Housing (노후아파트의 재건축 추진 영향요인 분석 -대구광역시 사례를 중심으로-)

  • 장석하;현택수;최무현
    • Journal of the Korean housing association
    • /
    • v.10 no.1
    • /
    • pp.145-154
    • /
    • 1999
  • In this study, various factors affect on the reconstruction of the deteriorated apartment housing complex in the Taegu-City were analyzed. The conclusions obtained in this research were summarized as follows; 1) In case of 4 to 5 storied apartment buildings, those were main objects for reconstruction. The number of the buildings and households consisting apartment complex and the total building area and the ground area were appeared as major factors. Those factors were highly correlated with the consensus of reconstruction. 2) As a maximun area of reconstruction was limited, higher existing consensus capacity and its ratio affect negatively on reconstruction of deteriorated apartments. 3) The main motivation for reconstruction is disadvantages among the members of reconstruction association were main obstacles to reconstruct the deteriorated apartment buildings. Therefore, a resoanble alternatives for reconstruction plans and administrative managements were needed.

  • PDF

A Study on the Architectural Characteristic of Nam-kwan-wang-myo and it's Reconstruction (고종 36년(1899) 남관왕묘의 중건과 건축 특성 연구)

  • Kwon, Joon-Hyung
    • Journal of architectural history
    • /
    • v.22 no.4
    • /
    • pp.73-82
    • /
    • 2013
  • This study aims to find architectural characteristic of Nam-kwan-wang-myo as known as Nam-myo, Especially focusing on difference between before and after it's reconstruction in 1899. Nam-kwan-wang-myo is a shrine for Kwan-woo who was warlord in ancient china. Belief of Kwan-Woo was introduced to Korea in Japanese invasion of 1592 and the shrine was built in 1598. Belief of Kwan-Woo diffused for the late Joseon, during the reign of Gojong, many people have faith in Kwan-Woo including the king. There was four Kwan-wang-myo around the Hanyang at that time. In 1899 a fire of unknown cause broke out at Nam-kwan-wang-myo, so the main buildings burned down. The king instructed reconstruction of the shrine even though there was in financial difficulties, it had done in the midst of a national crisis. The buildings almost restored as before. The buildings in the shrine has strong characteristics of Chinese architecture because it made by people of the Ming dynasty. Two side-by-side roofs, accumulated brick exterior are important architectural feature, but also all the buildings in the mail hall area Surrounded by the closed-connected fence is hard to find examples in Korea traditional architecture. And Nam-kwan-wang-myo just had maintained architectural characteristics including layout of buildings, shape of the each building until it's reconstruction(1899).

3-D Reconstruction of Buildings using 3-D Line Grouping for Urban Modeling

  • Jung, Young-Kee
    • Journal of information and communication convergence engineering
    • /
    • v.7 no.1
    • /
    • pp.1-6
    • /
    • 2009
  • In order to obtain a 3-D urban model, an abstraction of the surface model is required. This paper describes works on the 3D reconstruction and modeling by the grouping 3D line segments extracted from the stereo matching of edges, which is derived from multiple images. The grouping is achieved by conditions of degrees and distances between lines. Building objects are determined by the junction combinations of the grouped line segments. The proposed algorithm demonstrates effective results of 3D reconstruction of buildings with 2D aerial images.

Preference Analysis on the Reconstruction and Remodeling of Old Aged Apartment in Daejeon Area (대전지역 노후화된 아파트의 재건축과 리모델링에 대한 선호도 분석)

  • Park, Sun-Gyu
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.4 no.2
    • /
    • pp.180-186
    • /
    • 2016
  • There are many apartment buildings with the government's policy of increasing the supply of residential houses in Korea. Roughly 60% of the Korea population are living in apartment buildings. Since the 1970s, the Korean economy has grown enormously, the economic and social structure was radically transformed to industrialization and urbanization step. A village has grown into a large town in Korea and apartment buildings was constructed to solve national housing shortage by the Korean government and the construction company. Since the 2000s, this apartment buildings which was built in the 1970s and 1980s had become gradually deteriorated. So, reconstruction and remodeling project of apartment buildings have been come into request in Korea. There are two way to improve the residential environment. The one is remodeling of apartment buildings and the other is reconstruction of that. Therefore, we carried out questionnaire and survey study of the preference on the reconstruction and remodeling of old aged apartment which were located in daejeon province. As a result, the preference rate of remodeling is increasing instead of reconstruction because reconstruction of apartment buildings takes more money and needs long construction period.

A Study on the Making Period and Historic Values of the "Kyeongbokgung-Baechido" held by the Korea University Museum (고려대학교 박물관 소장 "경복궁배치도"의 제작시기와 사료가치(史料價値)에 대한 연구)

  • Yi, Hye-Won
    • Journal of architectural history
    • /
    • v.17 no.4
    • /
    • pp.43-64
    • /
    • 2008
  • Kyeongbokgung succeeded in regaining its status as a royal palace after the reconstruction that began in the second year of King Gojong(1865) only to have most of its buildings taken down in the early 20th century. Fortunately, however, there is the Pukkwoldohyong(Map of North Palace), which drew out each of the buildings of Kyeongbokgung and their arrangement in details in 1907 when the royal palace lost its original appearance. And there is another plot plan of the royal palace at the Korea University Museum, which labeled it Kyeongbokgung-Baechido(Planning Map of Kyeongbokgung Palace). The map presents almost the same plan as Pukkwoldohyong in terms of making and expressive methods, being estimated to have been made in 1888 since its building arrangement doesn't show the changes made after 1890. The map also offers more information about the uses of each building than Pukkwoldohyong and matches the excavation results of the relics. Kyeongbokgung-Jeondo(Map of Kyeongbokgung Palace), which is recorded to be made during the reconstruction of the palace in the early years of King Gojong in historical materials, describes the shapes and arrangements of the buildings in a concrete and realistic fashion. The Kyeongbokgung-Baechido seems to be one of the plans made in the process of restoring and repairing buildings that were lost or destroyed in fire. The Kyeongbokgung-Baschido has the following historic values; 1) it provides dues to estimate the early state of the palace after the reconstruction during the reign of King Gojong. In fact the Sujeongjeon and Heungbokjeon show the early state of the reconstruction; 2) it contains data with which to understand the changes to the palace after 1890, around which they added Hamhwadang and Jibokjae; and 3) it offers information about the uses of the palace's buildings from 1885 to 1880 with its descriptions of the building purposes and relationships regarding the life in the palace.

  • PDF

Analysis of Life Cycle Assessment of Renovation Building Through Case Study (리모델링 건축물의 전과정 탄소배출량 사례 평가 분석)

  • Lim, Hyojin;Jang, Hyeongjae;Tae, Sungho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.47-48
    • /
    • 2022
  • In Korea, construction and development has been continued rapidly since the 1970s, and the reconstruction and renovation market has recently been activated to improve old buildings. Most of the environmental evaluation of reconstruction and renovation projects is focused on the use of operating energy, and It is necessary to analyze carbon emissions throughout the life cycle for a comprehensive evaluation of reconstruction and remodeling projects. Therefore, this study quantitatively predicted carbon emissions from reconstruction and renovation based on ISO 14040s through case analysis for the purpose of evaluating the carbon emissions of renovated buildings from the perspective of the whole life cycle. In additional, the amount of carbon savings of each was analyzed through comparison with existing building.

  • PDF

A Comparative Research on the Reconstruction and Remodeling of Low-rise, Dilapidated Apartment Buildings (노후저층 공동주택의 재건축과 리모델링 사업의 비교 연구)

  • 이효진;김동훈;김진호;임남기
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2002.05a
    • /
    • pp.75-80
    • /
    • 2002
  • The purpose of this study is to conduct researches on the aspects of reconstruction and remodeling of low-rise, dilapidated apartment buildings in the provinces, using comparative methodologies, consequently coming up with the findings in the following. 1) Unlike the rebuilding projects in which the movement process tends to be made in a bulk (in a simultaneous manner), it turns out that when it comes to remodeling, it would be advisable to attempt moving the inhabitants as a group either by the size of their residence or by the building. 2) Given the peculiarities of the construction management mechanism, remodeling projects might seem disadvantageous on the part of the management on account of inadequate accumulation of information and experience. Hence, based on the impeccable assessment of the current status of the subject buildings from the phase of planning, its imperative to closely look into and take into consideration a variety of direct and/or indirect factors in advance of the implementation. 3) A series of comparative researches from the perspective of economical efficiency that remodeling projects appear profitable considering the overall costs including financial expenses, varied taxes, and so on that will be eventually brought forth during the reconstruction period, and all the more so when allowing for the consequential effects which they ought to have upon the natural and human resources, environmental and ecological condition, business potentials, etc. Amelioration to be desired on the basis of the findings above.

  • PDF

3D Building Reconstructions for Urban Modeling using Line Junction Features

  • Lee, Kyu-Won
    • Journal of information and communication convergence engineering
    • /
    • v.5 no.1
    • /
    • pp.78-82
    • /
    • 2007
  • This paper propose a building reconstruction method of urban area for a 3D GIS with stereo images. The 3D reconstruction is performed by the grouping 3D line segments extracted from the stereo matching of salient edges which are derived from multiple images. The grouping is achieved by conditions of degrees and distances between lines. Building objects are determined by the junction combinations of the grouped line segments. The proposed algorithm demonstrates effective results of 3D reconstruction of buildings with 2D aerial images.

A deep learning framework for wind pressure super-resolution reconstruction

  • Xiao Chen;Xinhui Dong;Pengfei Lin;Fei Ding;Bubryur Kim;Jie Song;Yiqing Xiao;Gang Hu
    • Wind and Structures
    • /
    • v.36 no.6
    • /
    • pp.405-421
    • /
    • 2023
  • Strong wind is the main factors of wind-damage of high-rise buildings, which often creates largely economical losses and casualties. Wind pressure plays a critical role in wind effects on buildings. To obtain the high-resolution wind pressure field, it often requires massive pressure taps. In this study, two traditional methods, including bilinear and bicubic interpolation, and two deep learning techniques including Residual Networks (ResNet) and Generative Adversarial Networks (GANs), are employed to reconstruct wind pressure filed from limited pressure taps on the surface of an ideal building from TPU database. It was found that the GANs model exhibits the best performance in reconstructing the wind pressure field. Meanwhile, it was confirmed that k-means clustering based retained pressure taps as model input can significantly improve the reconstruction ability of GANs model. Finally, the generalization ability of k-means clustering based GANs model in reconstructing wind pressure field is verified by an actual engineering structure. Importantly, the k-means clustering based GANs model can achieve satisfactory reconstruction in wind pressure field under the inputs processing by k-means clustering, even the 20% of pressure taps. Therefore, it is expected to save a huge number of pressure taps under the field reconstruction and achieve timely and accurately reconstruction of wind pressure field under k-means clustering based GANs model.