• 제목/요약/키워드: Building equipment construction

검색결과 494건 처리시간 0.028초

IT를 활용한 공조설비의 온라인 유지관리시스템 개발 (A Development of the On-line Maintenance and Management System for the HVAC system Using IT)

  • 이태원;김용기;강성주;우남섭
    • 대한설비공학회:학술대회논문집
    • /
    • 대한설비공학회 2008년도 하계학술발표대회 논문집
    • /
    • pp.48-53
    • /
    • 2008
  • The performances of the building service equipment relay on the individual superintendent's share for the assessment of performance, fault detection, deterioration diagnosis of the building service equipment. A major use of building energy management system(BEMS) is for monitoring plant and building's energy consumption. National building management system (N-BMS) presented in this study links buildings into a network group in order to monitor and control the buildings. How to construct the N-BMS was considered to save energy resource and to conserve performance of building service equipment. The FEMIS, facility, energy/environmental management & information system, for building service offer management process integrated with BAS, FMS and EMS and so on.

  • PDF

시뮬레이션 기법 기반 공정계획 수립을 위한 데이터베이스 구축 방법론 (Database establishment method for process scheduling by means of simulation)

  • 고용호;노재윤;키앙;신도형;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 봄 학술논문 발표대회
    • /
    • pp.69-70
    • /
    • 2022
  • The domestic process planning generally relies on calculations based on the construction-standard-production-rate. This method requires trial and error practice during the construction phase to deduce the optimized equipment combination for time and cost. Trial and error during construction can lead to cost overruns and schedule delays. Accordingly, this paper suggests an advanced method for establishing a productivity database based on combinations of equipment and also considering site conditions in order to reduce the timely effort for deducing the optimized equipment combination. For this purpose DES (Discrete Event Simulation) model was developed based on the information provided in the construction-standard-production-rate.

  • PDF

타워크레인 로프가잉 안정성 검토에 관한 연구 (A Study on the Stability of Rope Guying of Tower Cranes.)

  • 이원석;호종관;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 추계 학술논문 발표대회
    • /
    • pp.247-252
    • /
    • 2009
  • With the increasing use of tower cranes higher than free standing height, the importance of lateral support is also growing. Since the fall of 43 tower cranes hit by the last typhoon 'Mami' in 2003, regulations and concerns about safety of construction equipment have increased and construction laws regarding lateral support have been strengthened. In Korea, where there are many large-scale apartment housing construction works with the development of new towns, Rope Guying is a more economical construction method than Wall Brace which fixes building structure like building wall and slab. The safety of this Rope Guying is not verified and many construction works are still carried out based on the experience of site managers. There has been no case of construction work where frame and measurements are applied. The objective of this study is to examine the safety of Rope Guying method and ensure the effective implementation of equipment and prevention of disasters.

  • PDF

유닛모듈 운반용 고정장치의 하중거동 비교 분석 (A comparative analysis of load behavior of the fixing equipments for transporting unit modules)

  • 김균태;김석;전영훈;김태영
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.146-147
    • /
    • 2015
  • This paper compares load behavior of two fixing equipments for transporting unit modules. The suggested fixing equipment shows higher limit load than an existing fixing equipment, which proves that the suggested fixing equipment have higher safety.

  • PDF

인공신경망 모델 구축을 통한 건설장비별 이산화탄소 배출량 예측 (Development of Artificial Neural Network Model for Predicting Carbon Dioxide Emissions by Construction Equipment)

  • 임소민;노상우;김하윤;이민우;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 봄 학술논문 발표대회
    • /
    • pp.16-17
    • /
    • 2020
  • In this paper, we intended to present a model for estimating carbon dioxide emissions by work of construction equipment using Artificial Neural Network(ANN) analysis. In this study, data of excavators and trucks are classified according to the work carried out, and carbon dioxide emissions are predicted through ANN based on equipment information and work information. As a result, the effect of each model was validated, and a carbon dioxide emission prediction model was derived for each work. This has the expected effect of establishig an eco-friendly process plan using this model from the construction planning stage.

  • PDF

다중선형회귀분석 기반 건설장비 이산화탄소 배출량 예측모델 개발 (Development of prediction methodology from CO2 emissions of construction equipment based multiple linear regression)

  • 권재민;이재학;조민도;최영준;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 추계 학술논문 발표대회
    • /
    • pp.38-39
    • /
    • 2019
  • Environmental problems caused by GHG emitted by various industries are emerging around the world, and accordingly, relevant regulations are being applied by countries around the world. Korea is operating a carbon credit system that trades GHG in industry for money, which is expected to be applied to the construction industry. In addition, construction equipment using fossil fuels accounts for the largest portion of $CO_2$ emissions in the construction industry, and the importance of $CO_2$ reduction and prediction is increasing. However, there is a lack of data on the directly measured $CO_2$ emissions of construction equipment and there is no accurate methodology for measuring methods. Therefore, in this study, independent variables were derived based on the $CO_2$ emission data. In addition, multiple linear regression is performed for each independent variable to derive a predictive model of carbon dioxide emission by work type of construction equipment. It is expected that the construction process plan based on environmental factors in the construction industry can be established in the future.

  • PDF

건설장비의 탄소배출량 산정에 미치는 유휴시간의 영향 분석 (Analysis of the Impact of Idle Time on the Estimation of Carbon Emissions of Construction Equipment)

  • 오상민;이동윤;강고운;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2017년도 춘계 학술논문 발표대회
    • /
    • pp.193-194
    • /
    • 2017
  • Effect of variable factors on carbon emissions in construction industry is hard to analysis. Therefore this study analyzies effect of variable factors on carbon emissions. This study shows importance of variable factors and emphasizes need of estimation of carbon emissions considering variable factors.

  • PDF

Prevention through Design (PtD) of integrating accident precursors in BIM

  • Chang, Soowon;Oh, Heung Jin;Lee, JeeHee
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.94-102
    • /
    • 2022
  • Construction workers are engaged in many activities that may expose them to serious hazards, such as falling, unguarded machinery, or being struck by heavy construction equipment. Despite extensive research in building information modeling (BIM) for safety management, current approaches, detecting safety issues after design completion, may limit the opportunities to prevent predictable and potential accidents when decisions of building materials and systems are made. In this respect, this research proposes a proactive approach to detecting safety issues from the early design phase. This research aims to explore accident precursors and integrate them into BIM for tracking safety hazards during the design development process. Accident precursors can be identified from construction incident reports published by OSHA using a text mining technique. Through BIM-integrated accident precursors, construction safety hazards can be identified during the design phase. The results will contribute to supporting a successful transition from the design stage to the construction stage that considers a safe construction workplace. This will advance the body of knowledge about construction safety management by elucidating a hypothesis that safety hazards can be detected during the design phase involving decisions about materials, building elements, and equipment. In addition, the proactive approach will help the Architecture, Engineering and Construction (AEC) industry eliminate occupational safety hazards before near-miss situations appear on construction sites.

  • PDF

토사운반 공정의 스크레이퍼 중심 최적 장비조합에 관한 연구 (A Study on Optimal Equipment Fleet focused on Pusher-loaded Scrapers in Earthmoving Operation)

  • 이형국;손창백;이동은
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 추계 학술논문 발표대회
    • /
    • pp.39-42
    • /
    • 2012
  • Pusher-Loaded Scrapers are important construction equipment for large earthmoving operations. Production rates of a Pusher-Loaded Scraper vary greatly in accordance with the temperature or elevation, the equipment performance, haul speed, haul-road conditions, the method of loading, and Number of scrapers per one pusher. Determining of most economical scrapers fleet regarding the size of equipment, model name, and number of scrapers demands time-consuming calculation because it needs to reference of varied performance charts or tables and repeat complicated calculation. In this study, decision-making support system for the Optimal Pusher-loaded Scrapers Fleet is suggested for the purpose of calculating easily and handling effectively variables which are changed depend of the work conditions. The prototype of this program is developed using MATLAB. And the Database of Pusher-loaded Scraper embodies Performance chart & Retarder chart, soil properties, and calculation-support table.

  • PDF

원전 생애주기 관리대상 기기의 정보 흐름 규명을 통한 설계정보 추적성 구현방안에 대한 기초 연구 (A basic Study on Establishment Plan of Design Information Traceability through Design Information Flow Identification for Controlled Equipment during the NPP Lifecycle)

  • 임병기
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2017년도 추계 학술논문 발표대회
    • /
    • pp.183-184
    • /
    • 2017
  • Some of the information created during the design phase of an New NPP life cycle is useful only for the execution of the construction phase; however, much of the information greatly impacts the longer-term operational phase. To most make use of design and construction information produced by data based design system during the construction and operation phase, This research is identified controlled data and drawn design information of controlled equipment from documents generated during the life-cycle stages. This study aimed to analyze related documents to assure traceability of controlled equipment from design phase through O&M and then suggested DB(Data Base) based control method on technical information of major equipment throughout nuclear power plant lifecycle.

  • PDF