• Title/Summary/Keyword: Building Survey

Search Result 1,922, Processing Time 0.032 seconds

Deriving the Performance Requirements of a Window Cleaning Apparatus through Technology Survey (기술조사를 통한 창문청소장치의 요구성능 도출)

  • Kim, Kyoon-Tai;Jun, Young-Hun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.10a
    • /
    • pp.162-163
    • /
    • 2016
  • Conventional window cleaning method has a number of limitations, for example, workers dependent and high crash risk. The purpose of this study is to derive the performance requirements of a window cleaning apparatus through technology survey. For this, we investigated the domestic and international patents related to window cleaning, and interviewed experts in the field of window cleaning and mechanical design. Through this research, we have proposed performance requirements of the window cleaning apparatus.

  • PDF

A study on the characteristics of housing product and housing-builders' strategies (주택생산의 특성과 주택사업자의 사업 전략)

  • 진미윤;한수진
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2002.11a
    • /
    • pp.255-261
    • /
    • 2002
  • The purpose of this study was to identify the characteristics of housing product through housebuilders' strategies. As a methodology for this study, literature survey and questionnaire survey were used. Questionnaires were delivered on mail to 232 housing-builders and return rate was 34.1%. In summary, housing product was characterized long gestation period, periodically building cycle, future uncertainty of market volatility, maximization of land development gain, utilization of public fund for continuous building activity, moral hazard by accidental bankruptcy. Therefore private housebuilding could be defined speculative industry.

  • PDF

Quantity survey system for column-beam structure comprised of composite precast concrete members (합성 PC 라멘조를 위한 물량산출 시스템)

  • Lim, Chaeyeon;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.48-49
    • /
    • 2014
  • Green Frame is a column-beam system that uses composite precast concrete members. Previous studies have proven this system to be not only structurally safe, constructible, and economically feasible, but also environmentally-friendly. If the computerized program is used to estimate the quantity, the result of it shall be calculated much easily, quickly and exactly than manual estimation, because precast concrete members of Green Frame has standard size and connection method between it. Therefore, this study suggest quantity survey concept for column-beam structure comprised of composite precast concrete members. Hereafter, the quantity survey of Green Frame shall be much quickly and accurate, if the system would be made based on the result of this study.

  • PDF

Analysis of Requirements for Improvement of the Work-Life Balance of Construction Managers (건축공사 현장관리자의 워라밸 개선에 대한 요구사항 분석)

  • Lim, Hyeong-Eun;Noh, Ju-Seong;Kim, Jae-Yeob
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.124-125
    • /
    • 2018
  • The objective of this study is analyzing of requirements for improvement of the work-life balance of construction managers working in Korean construction companies. A survey has been conducted to analyze the requirements for improvement of construction managers. The survey was conducted on construction managers working in the field of architectural construction. 59 field managers working in 18 Korean construction companies responded to the survey. Upon analysis of the survey, the working hours were excessive and recreational time was very poor for the construction managers. There were differences in the answers regarding the areas that require improvement in the working conditions based on the age groups of the construction managers. A majority of young technicians selected that the recreational time and content of work require improvement, and technicians with a lot of experience selected that the stability of occupation and wage require improvement.

  • PDF

Classification of Noise Insulation Performance in Apartment Buildings through Noise survey and Auditory Experiment (설문조사와 청감실험을 통한 공동주택 차음성능의 평가등급 설정)

  • Ryu, Jong-Kwan;Jeon, Jin-Yong
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2005.11a
    • /
    • pp.666-669
    • /
    • 2005
  • Social noise survey and auditory experiment on residential noises such as floor impact, air-borne, bathroom, drainage and traffic noises were conducted to classily a noise insulation Performance in apartment building. The survey results showed that annoyance among subjective responses to residential noises was most greatly affecting to satisfaction with noises. In the survey, boundary limit between satisfaction and dissatisfaction was also determined. Auditory experiments was also undertaken to determine noise insulation performance according to the percent of satisfaction for individual noise source. Result of auditory experiment showed that the noise insulation performance for floor impact, airborne, drainage and traffic noise corresponding to 40 % satisfaction is 49 dB (L$_{i,Fmax,AW}$), 48 dB (R'w), N-41, and N-40, respectively. Finally, classes of noise insulation performance in apartment building were proposed according to satisfaction with noises

  • PDF

Walking Environment Survey for Development of Specification on Personal Mobility (PM) Device for Elderly (고령자용 개인교통수단 개발 사양 정의를 위한 보행환경 조사)

  • Kim, Youngmin;Kim, Jisoo;Moon, Byeongsup
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.16 no.6
    • /
    • pp.156-168
    • /
    • 2017
  • Personal mobility (PM) can increase the mobility of individual, so that the elderly can be set as the target group for using PM because of relatively low walking ability to normal. In this study, we design PM device for elderly that can be used safely in the walking environment such as sidewalk. There are various obstacles in the walking environment, so the device must have mechanical performance to overcome all of them. In this study, we survey the status and level of obstacle factors in walking environment to determine the dynamic performance of the PM device for elderly. We check up several guidelines about walking facilities to define obstacle points for the device, establish field survey methodologies, and conduct field survey for some specific road sections. Based on the survey results, we confirm the possible problems that could arise when the dynamic performance of the device is selected based on the facility-related criteria. We also define the performance requirements for the device based on the requirements for electric wheelchair.

A Basic Study on the Method of Building Energy Management Based on Digital Space Modeling and Ubiquitous IT Technology (디지털 공간모델링 기법과 유비쿼터스 IT 기술을 접목한 빌딩 에너지 관리방법에 관한 기초연구)

  • Park, Yong-Jun;Park, Nam-Hee;Choi, Jin-Won
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2009.04a
    • /
    • pp.181-186
    • /
    • 2009
  • Recently, the consuming efficiency of energy and natural resources has been a hot issue because of the continuous increasing of energy consumption and soaring of international oil prices. We tried to seek an action plan for the government's new paradigm 'Low-Carbon, Green Growth' by consuming energy efficiently and improving in energy management based on ubiquitous IT technologies. In this study, the library survey method is adopted for this study and IP-USN(internet protocol based ubiquitous sensor network) is considered as a core technology among various ubiquitous IT technologies. The purpose of this study is to deliver a method of energy management through integrating the context information gathered from sensors with digital space models and visualizing them together. The details are to survey the technologies of digital space modeling, USN based monitoring, building energy management and to integrate these technologies all together. This study will contribute to the enhancement of efficient building energy management by grasping the accurate situation of energy consuming in the building in realtime and minimizing unnecessary energy wastes.

  • PDF

Field Investigation of Debris Flow Hazard Area on the Roadside and Evaluating Efficiency of Debris barrier

  • Lee, Jong Hyun;Lee, Jung Yub;Yoon, Sang Won;Oak, Young Suk;Kim, Jae Jeong;Kim, Seung Hyun
    • The Journal of Engineering Geology
    • /
    • v.25 no.4
    • /
    • pp.439-447
    • /
    • 2015
  • In this study, specific sections vulnerable to debris flow damage were selected, and a complete enumeration survey was performed for the sections with debris flow hazards. Based on this, the characteristics of the sections with debris flow hazards and the current status of actions against debris flow were examined, and an efficient installation plan for a debris flow damage prevention method that is required in the future was suggested. The results indicated that in the Route 56 section where the residential density is relatively higher between the two model survey sections, facilities for debris flow damage reduction were insufficient compared to those in the Route 6 section which is a mountain area. It is thought that several sites require urgent preparation of a facility for debris flow damage reduction. In addition, a numerical analysis showed that for debris barriers installed as a debris flow damage prevention method, distributed installation of a number of small-scale barriers facilities within a valley part was more effective than single installation of a large-scale debris barrier at the lower part of a valley.

Using Survey information of BIM-applied Project - Construction Industry Specialist Interview - (스마트 건설에서 디지털 측량정보의 활용)

  • Jo, Jae-Hee;Choi, Young-Woo;Lee, Ji-Woo;Kim, Hwan-Yong
    • Journal of KIBIM
    • /
    • v.10 no.3
    • /
    • pp.33-42
    • /
    • 2020
  • Recently, in the smart construction field, it is possible to construct spatial information of 3D data base quickly and accurately using drones, LiDARs and ARs,. Most public ordering institutions are pushing for the efficiency of construction work through establishing and announcing road maps and guidelines for utilizing BIM for the entire life cycle of construction. However, in most policies, the impact of 3D data on the entire life cycle is limited by only partially constructing and utilizing 3D data or by being mentioned. In addition, many public institutions, construction companies and planning companies did not actively utilize survey information during the actual construction phase, despite the possibility of using 3D survey information. In order to confirm the utilization of survey information, a total of eight private construction companies were selected and interviewed by experts. The analysis shows that most of companies lack the performance of drone measurements or have a lack of awareness of advantages, and among them, construction companies are relatively active. Based on these opinions, this study examined the usability of surveying information and examined measures to expand the utilization of survey information in legal and institutional aspects, technology development aspects and industrial development.

Metadata design and system development for autonomous data survey using unmanned patrol robots (무인순찰로봇 활용 데이터 기록 자동화를 위한 메타데이터 정의 및 시스템 구축)

  • Jung, Namcheol;Lee, Giryun;Nho, Hyunju
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.267-268
    • /
    • 2023
  • Unmanned patrol robots are currently being developed for autonomous data survey in construction sites. As the amount of data acquired by robots increases, it is important to utilize proper metadata and system to manage data flow. In this study, we developed three materials, metadata design, robot system and web system, in the purpose of automating construction site data survey using unmanned patrol robots. The metadata was mainly designed to represent when and where raw data was acquired. To identify the location of data acquired, localization data from SLAM algorithm was converted to suit the construction drawings. The robot system and web system were developed to generate, store and parse the raw data and metadata automatically. The materials developed in this study was adopted to Boston Dynamics SPOT, a quadruped robot. Autonomous data survey of 360-picture and environment sensor was tested in two construction sites and the robot worked as intended. As a further study, development on the autonomous data survey to improve the convenience and productivity will be continued.

  • PDF