• Title/Summary/Keyword: Building Project

Search Result 2,463, Processing Time 0.03 seconds

Constructability Analysis in Aged-Housing Remodeling Demolition Work for Maximizing Waste Recycling (폐기물 재활용성 향상을 위한 리모델링 철거공사의 시공성 평가 및 사례적용)

  • Chae, Seong-Hyun;Kim, Ki-Hyun;Cha, Hee-Sung;Kim, Kyung-Rai;Han, Ju-Yeoun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.3
    • /
    • pp.13-22
    • /
    • 2010
  • From now on, the aged apartment or house is expected to increase rapidly. So, we have to build a process of remodeling and develop the new technique. Demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stability of building. Therefore, we need a step to develop a assessment system, verify and make specified. This paper evaluated how much improve on construction speed, work efficiency, intensity of work and influence with another process comparing the existing method with the new demolition method. The qualitative and quantitative assessment system are developed with these output. The case study was carried out experimental group and control group, based on developed assessment system, which have the same condition. The existing method was made up of 3 steps- 1)Demolish windows, doors and iron goods, 2)Demolish indoor and outdoor walls, 3)Drop the waste. The new demolition method was made up of 5 steps- 1)Demolish windows, doors and iron goods, 2)Demolish the ceiling and wall's finishing materials, 3)Demolish the floor's finishing materials, 4)Demolish indoor and outdoor walls, 5)Drop the waste. Work time, idle time, the character of a work unit are analyzed by mock-up test. This study's output is expected to establish a systematic process of new demolition method and based on the maximizing waste recycling work in our construction industry.

Analysis of Location and Site Planning Preference of USFK Residential Housing (주한미군 주거계획을 위한 입지 및 단지계획 선호도 분석)

  • Lee, Heewon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.12
    • /
    • pp.822-827
    • /
    • 2019
  • There is a high demand for off-base dwellings around Camp Humphreys in Pyeongtaek in accordance with the USFK base relocation project, but their residential planning needs to reflect their requirements. On the other hand, no studies that examined their requirements directly have been found. This study examined the requirements of USFK stationed in Camp Humphreys to identify their requirements. In general, residential planning requires a determination of the demand-based location and size, identification of the facility elements required for the site plan, and analysis of detailed architectural planning elements required for the building plan. Among these, preference analysis of the off-base dwelling demand, location, and site planning elements were performed in this study, and the architectural planning elements were left as following studies. The analysis showed that the demand for off-base dwellings is high, rental houses are preferred, and the commuting time is the most important factor in the location. In addition, while enjoying urban convenience, the location of the foothills near nature is preferred, the importance of the orientation is low and living with Koreans is not a problem. In addition, the demands for exercise facilities in the complex are relatively high.

Projection of Future Snowfall and Assessment of Heavy Snowfall Vulnerable Area Using RCP Climate Change Scenarios (RCP 기후변화 시나리오에 따른 미래 강설량 예측 및 폭설 취약지역 평가)

  • Ahn, So Ra;Lee, Jun Woo;Kim, Seong Joon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.3
    • /
    • pp.545-556
    • /
    • 2015
  • This study is to project the future snowfall and to assess heavy snowfall vulnerable area in South Korea using ground measured snowfall data and RCP climate change scenarios. To identify the present spatio-temporal heavy snowfall distribution pattern of South Korea, the 40 years (1971~2010) snowfall data from 92 weather stations were used. The heavy snowfall days above 20 cm and areas has increased especially since 2000. The future snowfall was projected by HadGEM3-RA RCP 4.5 and 8.5 scenarios using the bias-corrected temperature and snow-water equivalent precipitation of each weather station. The maximum snowfall in baseline period (1984~2013) was 122 cm and the future maximum snow depth was projected 186.1 cm, 172.5 mm and 172.5 cm in 2020s (2011~2040), 2050s (2041~2070) and 2080s (2071~2099) for RCP 4.5 scenario, and 254.4 cm, 161.6 cm and 194.8 cm for RCP 8.5 scenario respectively. To analyze the future heavy snowfall vulnerable area, the present snow load design criteria for greenhouse (cm), cattleshed ($kg/m^2$), and building structure ($kN/m^2$) of each administrative district was applied. The 3 facilities located in present heavy snowfall areas were about two times vulnerable in the future and the areas were also extended.

A Study on the Feasibility of the Timing for the Implementation of Energy-Saving Plan of Buildings Based on the Approval of Business Plan and Construction Permit (건축물에너지절약계획서의 사업계획승인, 건축허가에 따른 적용시점의 타당성 연구)

  • Kim, Dae-Won;Kim, Young-Il;Chung, Kwang-Seop
    • Journal of Energy Engineering
    • /
    • v.21 no.3
    • /
    • pp.265-270
    • /
    • 2012
  • The delay in the construction permit for the building, which obtained the approval of business proposal, may lead to a difference in the maintenance cost ranging between 20% and 30% in the neighborhood where the residents moved in, along with the new project under construction in the surrounding area amidst rigorous regulations that aim to promote energy-saving and the heightened interest of the public in energy conservation, and such problem would become the major source of serious public complaints. Thus, the energy-saving plan needs to be prepared when the approval is granted to the business plan. In order to prevent public complaints or ensure effectiveness of government's energy plan, it may be effective to apply the energy-saving plan based on current standards upon the award of construction permit when two years have elapsed since the date of the scheduled commencement of construction or when the start of construction is delayed as stipulated in the Article 18 of the Enforcement Decree of Housing Act. If the energy-saving plan and related technologies are merely the parts of license and permit process without fully serving their purposes and functions, it would be waste of time to deploy a lot of workforce and review and seek consultation. The government or owners of buildings need to fully understand the energy-saving aspects and exert effort to enhance the energy efficiency of buildings.

Wide Integrated Surveillance System of Marine Territory Using Multi-Platform (다중플랫폼을 이용한 해양영토 광역통합감시 시스템)

  • Ryu, Joo-Hyung;Lee, Seok;Kim, Duk-jin;Hwang, Jae Dong
    • Korean Journal of Remote Sensing
    • /
    • v.34 no.2_2
    • /
    • pp.307-311
    • /
    • 2018
  • It is necessary to establish wide integrated surveillance system of marine territory to reduce damage caused by maritime security threats, marine pollution and accidents for safe and clean marine use and efficient development of marine resources. For marine surveillance, the information characteristics of space-time specific, accuracy and operability are required, and real-time information about the wide area should be provided at all times. This special issue has been published to identify the characteristics of each platform, evaluate its usability for the establishment of a wide integrated surveillance system, and present the direction for future convergence studies between platforms. Since 2015, KIOST and cooperative research team have been performing the project, "Base research for building wide integrated surveillance system of marine territory using multi-platform" that detect vessels and red tide etc. near real time by using satellite, UAV and HF Ocean Radar. The objective of this special issue is to introduce the significance for an integrated system for maritime surveillance and to create a forum for discussion on recent advances in remote sensing technology and applications for marine disasters, pollution, and accident surveillance.

Estimating Visitors on Water-friendly Space in the River Using Mobile Big Data and UAV (통신 빅데이터와 무인기 영상을 활용한 하천 친수지구 이용객 추정)

  • Kim, Seo Jun;Kim, Chang Sung;Kim, Ji Sung
    • Ecology and Resilient Infrastructure
    • /
    • v.6 no.4
    • /
    • pp.250-257
    • /
    • 2019
  • Recently, 357 water-friendly space were established near the main streams of the country through the Four Major Rivers Project, which was used as a resting and leisure space for the citizens, and the river environment and ecological health were improved. We are working hard to reduce the number of points and plan and manage the water-friendly space. In particular, attempts are being made to utilize mobile big data to make more scientific and systematic research on the number of users. However, when using mobile big data compared to the existing method of conducting field surveys, it is possible to easily identify spatial user movement patterns, but it is different from the actual amount of use, so various verifications are required to solve this problem. Therefore, this study evaluated the accuracy of estimating the number of users using mobile big data by comparing the number of visitors using mobile big data and the number of visitors using drone for Samrak ecological park located in the mouth of Nakdong River. As a result, in the river hydrophilic district, it was difficult to accurately estimating the usage pattern of each facility due to the low precision of pCELL, and it was confirmed that the usage patterns in the park could be distorted due to the signals stopped at roads and parking lots. Therefore, it is necessary to improve the number of pCELLs in the water-friendly space and to estimate the number of visitors excluding facilities such as roads and parking lots in future mobile big data processing.

A Case Study of Child·Youth Friendly Cities Development (아동·청소년 친화도시 조성 사례연구)

  • Kim, HeeJoo;Seo, Jeong-A
    • The Journal of the Korea Contents Association
    • /
    • v.20 no.3
    • /
    • pp.584-599
    • /
    • 2020
  • This study aimed to explore goals and development process of Child·youth Friendly Cities certified by UNICEF Korea and to provide a research basis for promotion and development of Child·youth friendly cities in Korea. Researchers conducted in-depth interviews with experts in two cities designated as UNICEF Child·youth Friendly Cities in early days. The findings showed that in order to successfully build and maintain friendly cities for children and youth, active interest and efforts of local governors and government officials for promoting friendly cities and policy enforcement based on four principles of child rights were required as prerequisite. In relation to managing Child·youth friendly cities, two cities selected as cases of this study provided universal social welfare programs for children and youth and expanded after-school care services for local students. Moreover they tried to promote decision making and protect rights of children and youth by allowing them to participate in community programs. The important distinctions of these cities were that they established a department exclusively for children and youth and closely cooperated with experts in private sectors. However, participants agreed that there should be more comprehensive and multilateral approach for building Child·youth friendly cities, adoption of incentive system for certification of Child·youth friendly cities and more active promotion of the UNICEF project. In conclusion, the researchers proposed policy implications.

A study on taxation of foreign corporation's Permanent Establishment (고정사업장의 과세에 관한 연구: 플랜트 건설.판매기업의 사례를 중심으로)

  • Suh, Jung-Rog
    • Management & Information Systems Review
    • /
    • v.29 no.3
    • /
    • pp.71-96
    • /
    • 2010
  • This article firstly reviewed Permanent Established(PE) concept of OECD and UN model tax treaty and compared it with that of Korean Corporate Income Tax Law(CITL). The various factors regarding profit like ways of deciding the local source profit, scope and calculation method which will be imputed to PE were also reviewed. Based on above, standard PE judgement basis and calculation method of local source profit were also studied by using actual cases in foreign corporation which performs plant construction & sales in Korea. Accordingly to properly solve the conflict regarding international tax and to protect the tax authority against the foreign corporation in Korea, by standing on equality, I now propose followings for the better concept of PE in Korea. Firstly, the article that a building site or construction or installation project constitutes a PE only if it lasts more than 6 months should be modified to reflect OECD model convention's criteria of 12 months. Second, the scope of 'subordinate attorney' which is regarded as PE under CITL is now including 'holding-delivery attorney', 'order attorney', and 'assurance attorney' as well as 'contract attorney'. This is overly limit the activities of foreign corporation. It had better be loosened only to include 'contract attorney' as OECD provisions. Third, the CITL limits the cases of preparatory and/or auxiliary place which is not regarded as PE, thus limit the foreign corporations' business by expanding the concept of PE. This had better be eased. Fourth, in deciding the amount of local source profits, the CITL stipulates to split the profits by the relevant contribution of transaction parties through 'profit split method'. To solve the conflict, the ways of profit split must be better clarified through providing object and detailed standard and basis.

  • PDF

Evaluation of Capacity Spectrum Methods for Seismic Fragility Analysis of Bridges (교량의 지진 취약도 해석 시 사용되는 성능 스펙트럼 기법의 평가)

  • Kim, Sang-Hoon;Yi, Jin-Hak;Kim, Ho-Kyung
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.8 no.1
    • /
    • pp.67-76
    • /
    • 2004
  • This study presents the evaluation of CSM(Capacity Spectrum Method, ATC-40) in developing fragility curves for a sample concrete bridge. The CSM is originally developed as one of the simplified procedures for building structures, while this study adopts the CSM to develop fragility curves of bridge structures. Four(4) different approaches are demonstrated and the fragility curves developed are compared those by the nonlinear time history analysis. Fragility curves in this study are represented by lognormal distribution functions with two parameters and developed as a function of PGA. The sixty(60) ground acceleration time histories for the Los Angeles area developed for the Federal Emergency Management Agency (FEMA) SAC(SEAOC-ATC-CUREe) steel project are used for the bridge analysis. The comparison of fragility curves by the CSM with those by the time history analysis indicates that the agreement is excellent for one of the methods investigated in this study. In this respect. it is recommended that the demand spectrum might be improved according to the guidelines suggested in this study. However, this observation might not always apply, depending on the details of specific bridge characteristic

A Study on the Operation & Management of Smart City R&D Testbed Projects (스마트시티 관련 R&D 테스트베드 사업의 운영관리 방향에 관한 연구)

  • Han, Sun-Hee;Lee, Jae-Yong
    • Journal of Digital Convergence
    • /
    • v.15 no.7
    • /
    • pp.13-25
    • /
    • 2017
  • The Korean government is pursuing technological development through nearly every government agency, and Korea's growing R&D spending is yielding good results in many fields. With the country moving from the technology development stage to the demonstration stage, it is actively implementing testbed projects to demonstrate developed technologies and services. This is, however, not without problems. There is no consistent systematic system for the testbed projects because government agencies compete against each other in the planning of execution of R&D: they do not work together. The most serious problem is that both testbeds and developed technologies die out due to poor operation management after the completion of test projects. Research should, therefore, be done on operation management and commercialization. However, the government still does not consider the system after the test: it focuses on building testbeds to verify developed technologies. This study intends to determine the basic orientation of operation management to ensure maximum performance, efficiency, and continuity of national projects through intensive analysis of ongoing national R&D testbed projects and examination of success stories of operation management at home and abroad.