• 제목/요약/키워드: Building Layout Planning

검색결과 100건 처리시간 0.023초

고층공사 가설시설물의 동적수직배치 최적화를 위한 기초연구 (Preliminary study for Vertical Dynamic Site Layout Planning of High-Rise Building Construction)

  • 표기윤;이동민;임현수;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.39-40
    • /
    • 2018
  • The goal of site layout planning(SLP) is to maximize the productivity and efficiency of the construction by reducing travel distance and material handling cost and manpower. However, SLPs are static layout schemes, which cannot be reorganized during the construction process to correspond with errors, phase transition, changing working environments on the site. To solve this problem, researches on dynamic site layout planning(DSLP) are emerging. This preliminary study clarifies characteristics of temporary facility's variables to develop the vertical DSLP algorithm of high-rise building construction.

  • PDF

캠퍼스 마스터플랜의 구성(構成)과 계획방법(計劃方法)에 관한 연구(硏究) (A Study on the Campus Master Planning Methods)

  • 안경환
    • 교육시설
    • /
    • 제15권5호
    • /
    • pp.5-12
    • /
    • 2008
  • The purpose of this study is to suggest a design guideline for the domestic campus master plan. The main contents of this study are as follows ; 1) Study for the characteristics and components of the comprehensive campus master plan. 2) Case study on the domestic campus plan 3) Establishment of methods for campus master plan focused on the space programming, land use planning, circulation planning, and building layout planning.

마감공사 생산성 향상을 위한 리프트 카 최적배치 모델 (Optimum Layout Model of Lift Car for Improving Productivity in High-rise Building Exterior Finishing Work)

  • 이동민;임현수;김태훈;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.171-172
    • /
    • 2013
  • An operation planning of lift car is crucial in tall building construction especially it's arrangement plans, because it is related with transportation distance of finishing materials affecting construction productivity. Since tall building construction, composed of complicating and huge plane have complex traffic lines of finishing materials, to determine the position of lift car empirically or intuitively has limits. Therefore this paper suggest an optimum layout model of lift car minimizing the transportation distance both at site-level and floor-level using Graph theory and Dijkstra algorithm.

  • PDF

The Development of Automatic Module for Formwork Layout using the BIM

  • Chijoo Lee;Sungil Ham;Ghang Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1266-1271
    • /
    • 2009
  • Formwork layout is perceived as important due to its strong tie to site works. But, most formwork is done manually and influenced by worker's skill and thus, a lot of construction errors occur. The introduction of BIM (Building Information Modeling) enables acquiring more precise information on the building shape, dimension, structure, etc. than 2D-based drawings and thus, the increased productivity, such as reduction of workload and work times, and the economic efficiency, such as reduction of formwork types and form dimensions with the consideration of constructability, are expected. This study reviewed the previous studies and formwork layout systems to derive this study's differentiations and factors to be first considered for formwork planning were derived by analyzing priorities against consideration factors. Last, a flow chart and algorithm were developed to apply the derived factors to the formwork layout module.

  • PDF

대학 캠퍼스계획의 분석을 통한 방향설정에 관한 연구 (A Study on the Planning Directions based on the Analysis of the Campus Plan)

  • 안경환
    • 교육시설
    • /
    • 제16권5호
    • /
    • pp.27-33
    • /
    • 2009
  • The existing universities enlarged the scope, filled up the facilities. And many new universities are founded by increase of university students, the change of curriculum and extension of installations for new curriculum. However, the planning for university campus hinders desirable activities in campus and also the origin function of university, because of the problems caused by an application of a uniform planning standard that lacks in logical analysis and such a short step as the occasion demands for the growth and the change of the university campus changing more rapidly than any other field in society. This dissertation is for space program beginning from architectural explanation and basic planning concluding a general structure-planning for land utility, circulation planning, and building layout planning in order to find the practical solution for the applicable campus plan. The contents of this dissertation is summarized below. First, I studied the characteristics of the university, the structure of the university facilities and the expansion the development process of the campus. Second, through the case study of domestic campus planning, I analyzed the characteristics and the problems about space programming, facility layout planning, circulation planning and exterior space planning. Third, in the basis of the above analyses, I set up the directions of comprehensive campus master plan.

좌식공간관습의 건축사적 함의 - 신발의 문제를 중심으로 - (The Architectural Meaning of the Floor-Sitting Culture in Korea - Focused on the Matter of Shoes -)

  • 조재모
    • 건축역사연구
    • /
    • 제21권1호
    • /
    • pp.83-98
    • /
    • 2012
  • The starting point of this study is the concerning of simple behavioral pattern that whoever enters the inner space with taking off his shoes should go out from the position where he laid his shoes. The using of Ondol (floor heating room) and Maru (lifted wood floor) had changed the architectural space from chair-sitting to floor-sitting space, and it also made the behavior of taking off the shoes at the entrance of building and stepping on the lifted floor. This simple behavior has possibility to make lots of changes to the culture of architectural design. With this noticeable point, this paper is talking about the cultural feature of Korean traditional architecture, especially about the influence of tanking off and putting on shoes. The matter of shoes has changed diverse aspects of building and layout planning. It maximized the difference between front and rear part of building and characterized the lateral extension of Korean traditional house. The ritual space also had evolved from chair-sitting to floor-sitting space according to the type of ritual behavioral pattern. The change on the single building level had influenced on the layout planning of architectural complex. For examples, the parallel layout of ChangDeok-gung palace and the long sequential process to the main pavilion of Buddhist temple are the result of the matter of shoes. And NuGak(樓閣), the double-storied pavilion, on the axis of entering sequence's node is one of the unique planning elements that makes possible to go through the building without taking off the shoes and also makes upper level space for staying. In short, Korean traditional architecture that has the chair-sitting spatial origin of the East Asian cultural sphere has pursued new architectural issues and planning methods according to evolution to the floor-sitting culture.

영향요소 분석에 의한 고층건축공사의 가설계획시스템 개발 (Development of Temporary Facility Planning System for High-rise Building Constructions through the Analysis of Influence Factors)

  • 장명훈
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2002년도 학술대회지
    • /
    • pp.164-173
    • /
    • 2002
  • 도심지 고층건축공사는 인접 건물과 도로에 의해 둘러 쌓여 있어 여유공간이 부족하고, 소음과 분진 등에 의한 문제가 발생한다. 이러한 문제들은 철저한 공사계획을 통해 여유공간을 효율적으로 활용하고, 공사 지원시설을 적절히 사용하는 가설계획을 통해 해결될 수 있다. 본 연구는 고층건축공사의 가설계획의 영향요소를 분석하고, 이를 활용한 가설계획의 대안 평가와 선정 방법을 제시하고 있다. 가설계획을 수립하는 과정에서 필요한 지식을 체계화하고 대안평가 방법을 적용하여 현장 관리자가 계획을 수립하는 과정을 지원할 수 있는 시스템을 구현하였다. 제안된 대안 평가 및 선정 방법과 구현된 시스템의 타당성을 검증하기 위해 사례 연구를 수행하였다.

  • PDF

초고층 건축공사의 바닥거푸집 최적배치 모델 구축 프로세스 연구 (The Process for Development of the Optimum Layout Model in Slab Formwork of High-rise Building Construction)

  • 차민수;김태훈;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 춘계 학술논문 발표대회 1부
    • /
    • pp.171-172
    • /
    • 2011
  • Formwork accounts for a large proportion of the framework in high-rise construction projects in terms of the duration and cost. Especially, slab formwork has a significant influence on these factors. However, the current selection of formwork method in general contractors depends on the decisions of few experienced engineers, and layout planning of the formwork in specialty contractors requires lots of time by different floor types. As a preliminary study for developing an optimum layout model in slab formwork of high-rise building construction, this study proposes the process of the optimum layout model and determines a fitness function for use of the genetic algorithm aimed at table formwork.

  • PDF

거푸집공사 시공성 향상을 위한 거푸집 배치 효율화 지원 모델 - 구조부재 조정을 중심으로 - (A Support Model of Optimum Layout Planning of Forms for Improving Constructability of Formwork)

  • 이동민;임현수;김태훈;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 추계 학술논문 발표대회
    • /
    • pp.212-213
    • /
    • 2013
  • The constructability of Formwork has a importantly influence on the duration and cost in a construction project. However, the existing studies on the formwork are mainly focused on a method of construction. Although a layout planning of forms, especially, is an important factors affecting the constructability and cost, it is done by engineers empirically and intuitionally after completion of structure design. Therefore this study suggest a decision support model for optimal formwork layout model based on the rearrangement of structural members by using Genetic Algorithm to improve constructability of formwork.

  • PDF

체계적 배치계획을 이용한 특수 건축물의 설계사례 (Design of A Special Facility using Systematic Layout Planning(SLP))

  • 박세진
    • 교육녹색환경연구
    • /
    • 제2권1호
    • /
    • pp.69-79
    • /
    • 2002
  • This paper investigates the methodology to develop a layout of the simulator for measuring and evaluating human sensibility. Since the simulator layout is different from general building layouts in that it is organized in order to communicate systematically between facilities, laboratories to evaluate human sensibility and equipments to support experiments in simulator, two approaches based on eigenvector and cut tree are support to develop a simulator layout. Qualitative input data (relationship chart, space requirements for each laboratory and equipment) are obtained and transformed into quantitative data. The information obtained by two approaches provides several meaningful clues to generate the simulator layout. The simulator layout is presented based on the obtained information by two approaches. Extracted quantitative data by using eigenvector and cut tree are meaningful of generating the simulator layout.

  • PDF