• Title/Summary/Keyword: Building Layout Drawing

Search Result 11, Processing Time 0.029 seconds

The Study On The Actual Condition Of Rebar Work In Korean Building Construction (국내 건설 현장의 철근공사 실태조사에 관한 연구)

  • 이응균;박우열;강경인
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2002.11a
    • /
    • pp.133-138
    • /
    • 2002
  • Rebar work takes up big proportion in a construction work. The current process of purchasing, cutting and election, and working of rebar induces a lot of loss in rebar. This study is focused on analyzing the problem and the present condition of the process from the calculating of rebar quantifies to the actual constructional stage through surveying those who have experience in the estimation department, or the construction site of a domestic construction company. Many reform measures such as diversification of standard(i.e., 8-meter)bar, calculation of rebar quantities and construction according to the rebar election drawing, expansion of accuracy in layout plan, thoroughness in examination of layout plan in advance, utilization of the worked material, systemization of rebar control(management), and a shift in attitude of the field(site) manager were proposed as the result of the survey.

  • PDF

The Improvement of Real-time Updating Methods of the National Base Map Using Building Layout Drawing (건물배치도를 이용한 국가기본도 수시수정 방법 개선)

  • Shin, Chang Soo;Park, Moon Jae;Choi, Yun Soo;Baek, kyu Yeong;Kim, Jaemyeong
    • Journal of Cadastre & Land InformatiX
    • /
    • v.48 no.1
    • /
    • pp.139-151
    • /
    • 2018
  • The National Base Map construction consists of the regular correction work of dividing the whole country into two regions and carrying out the modification Plotting by aerial photographs every two years as well as the real time updating work of correcting the major change feature within two weeks by the field survey and the As-Built Drawing. In the case of the Building Layout Drawing of Korea Real estate Administration intelligence System(KRAS) used for real time updating work of the National base map, the coordinate transformation error is included in the positional error when applied to the National Base Map based on the World Geodetic Reference System as the coordinate system based on the Regional Geodetic Reference System. In addition, National Base Map is registered based on the outline(eaves line) of the building in the Digital Topographic Map, and the Cadastral and Architecture are registered based on the building center line. Therefore, the Building Object management standard is inconsistent. In order to investigate the improvement method, the network RTK survey was conducted directly on a location of the Building Layout Drawing of Korea Real estate Administration intelligence System(KRAS) and the problems were analyzed by comparing with the plane plotting position reference in National Base Map. In the case of the general structure with the difference on the Building center line and the eaves line, beside the location information was different also the difference in the ratio of the building object was different between Building center line and the eave. In conclusion, it is necessary to provide the Base data of the double layer of the Building center line and the outline of the building(eaves line) in order to utilize the Building Layout Drawing of Korea Real estate Administration intelligence System(KRAS). In addition, it is necessary to study an organic map update process that can acquire the up-to-dateness and the accuracy at the same time.

Case Study of Coordinate Measurement during Construction of Long-Span Irregular Curved Roof Layers (장경간 비정형 곡면 지붕층의 시공중 좌표 계측 사례 연구)

  • Shim, Hak-Bo;Seok, Won-Kyun;Park, Soon-Jeon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.14-15
    • /
    • 2019
  • In this paper, it was tried to prove the possibility and effect of coordinate measurement by using MEP layout equipment at the construction stage, and to propose a method to improve measurement accuracy during construction. For this study, the passenger terminal site, which is a long span structure, was selected and compared with three dimensional CAD drawings and construction measurement results using MEP layout equipment for the precise construction of long-span irregular curved roof layers. As a result, it was found that it is possible to construct three-dimensional curved roof layers using MEP layout equipment through measurement and analysis.

  • PDF

Feng shui analysis on the Layout of the building in Gyeongbokgung Palace -Focus on the analysis of Bukgwoldohyeong in the Paltaekron's point of view- (경복궁의 전각 배치에 대한 풍수적 해석 -팔택론의 관점에서 본 북궐도형 분석을 중심으로-)

  • Lee, Ho-Sun;Han, Dong-Soo
    • Journal of architectural history
    • /
    • v.28 no.3
    • /
    • pp.7-18
    • /
    • 2019
  • This study analyzed "Bukgwol Dohyeong (Drawing Plans for the Northern Section of Gyeongbokgung Palace)", which is an important source material for the restoration of the palace, by applying Paltaekron, the geomantic principle of bearings, in order to clarify the building layout principle of Gyeongbokgung Palace. Gyeongbokgung Palace shows the typical geographical conditions that meet the principle of Baesan Imsu (mountain in the back and water in the front) which takes Baegaksan Mountain as the main mountain and the overall layout of the buildings that meet the principle of 'Jeonchak Hugwan (narrow in the front and broad toward inside)' by using the natural topography that meets the principle of 'Jeonjeo Hugo (low in the front and higher toward back).' It is estimated that this layout and arrangement must have been led by geomantic principle of bearings. The analysis of the building layout plan of Gyeongbokgung Palace in the late Joseon Dynasty Period suggests the application of two methods: one is to divide central area from Gwanghwamun Gate to Geoncheongung Hall into eight layers and the other is to apply the bearings of the Eight Trigrams based on the building that becomes the center. As a result, the gate, main hall, and kitchen of all major buildings where the royal family lived are located in the auspicious bearings according to the geomantic principle of bearings while the spaces where people other than the royal family such as those who served the royal family and the officials operated in the palace or the hall that enshrines the ancestors such as Taewonjeong Hall are located in the ominous bearings. Therefore, the buildings of Gyeongbokgung Palace are arranged based on the geomantic principle of bearings.

Method to Select Tower Cranes Using Augmented Reality in Smart Devices (스마트 기기의 증강현실을 이용한 타워크레인 선정방안)

  • Ryu, Han-Guk;Choi, Heebok;Jang, Myung-Houn
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.5
    • /
    • pp.407-413
    • /
    • 2014
  • Appropriate selection of lifting equipments for a high-rise building construction project is one of the important factors to the project's success. Proper position of a tower crane on a construction site is so important to be determined by an expert or an experienced construction manager who draws working range of a tower crane and moves it over 2D(dimensional) site layout plan. 3D CAD, BIM, and virtual reality are is used for building design and construction, but it is not usual to use them for temporary facility planning or selection of a tower crane. This study proposes a suitable method to use augmented reality to select proper position of tower cranes. An augmented reality prototype is implemented by Vuforia and Unity 3D on a smart device to verify the practicability of the proposed method. The prototype application installed on a smart device shows several tower cranes on different markers in a real architectural drawing to locate the proper tower crane.

Integrated Framework of Sales and Design Process for the Elevator Small-Medium Industry (중소기업형 승강기 영업-설계 통합 프레임워크)

  • Ko, Young-Joon;Han, Kwan Hee
    • The Journal of the Korea Contents Association
    • /
    • v.20 no.6
    • /
    • pp.415-424
    • /
    • 2020
  • Recently, the elevator industry in Korea has been divided into the high speed elevator market and medium-low speed elevator market, and SMEs are making rapid progress in the medium-low speed fields. Usually, since the elevator manufacturer receives an order for installation after the construction of the building structure, it is necessary to promptly create a optimal elevator model and layout drawing in an earlier stage of sales activity due to the limited time to elevator installation. This study analyzes the sale and design works of the elevator SMEs, examines the areas that can be efficiently improved, and integrates the preceding our studies from the viewpoint of efficiency improvements at sales and design business process in the elevator industry. After that, we proposed an integrated framework of sales and design process for the elevator SMEs industry, and developed a prototype software system for automating the creation of optimal elevator model, layout drawing of elevator and BOM(Bill Of Material) list.

Design of Propulsion Shafting System for Controllable Pitch Propeller (I : Latout Design with Sizing) (가변추진기 추진축계시스템의 설계 (제 I 보 : 외형설계 ))

  • 김기인;전효중;박명규;김정렬
    • Proceedings of the Korean Society of Marine Engineers Conference
    • /
    • 2002.05a
    • /
    • pp.129-134
    • /
    • 2002
  • This study is focused on the layout design with sizing for the main propulsion shafting with controllable pitch propeller system. For appropriate design and successful manufacturing of controllable pitch Propeller system, it is based on specifications to be required from the customer as well as the stresses calculation and analysis of main propulsion system for hollow shafting. And it must be performed according to the U.S military specifications MIL-STD-2189(SH) with drawing of NAVSHIPS 803-2145807, and also the stress analysis by applying safety factor. The results are as follows : 1. For the main propulsion system with controllable pitch propeller, it is designed the following items propeller diameter, hub diameter, dimensions of oil distribution or actuating unit based on shaft mounting type, diameters of propeller and intermediate shaft, dimension of split muff coupling, coupling flange thickness and of coupling bolt diameter. 2. As the results, we can get complete our own design ability for the main propulsion shafting with controllable pitch propeller system with critical data which are necessary to establish shafting arrangement from the ship building companies.

  • PDF

A Study on Process of Architectural Design Education Using BIM (BIM을 적용한 건축설계 수업과정에 관한 연구)

  • Min, Young-Gi;Chung, Kwang-Ho
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.13 no.3
    • /
    • pp.33-40
    • /
    • 2013
  • The purpose of this study is to propose an curriculum for architectural studio in university to implement BIM process, through the analysis of the advantages of the BIM tool. The limitation of this study was to analyze the case study of only half year a single university. University education in the design process, the design that can be used in applying BIM content should be universal, university education considering the special working conditions, excessive BIM-based application can be difficult. Therefore, a systematic and reliable design that can be applied to education applies BIM design process is necessary to establish. University education applying BIM design review and design proposal the various 3D visualization can be used effectively to determine. In addition, the planned representation for thinking about and drawing 3D model building, architectural space can be used for visualization, and other subjects in conjunction with structural analysis, environmental analysis, facility layout, etc. can be used.

A study on the Development course of guideline for fostering the Rural village roads (농촌마을길 조성을 위한 가이드라인 개발 방향 연구)

  • Kim, Eun-Ja;Lee, Yoo-Kyoung;Kim, Sang-Bum;Lim, Chang-Su;Park, Mi-Jung;Choi, Jin-Ah;Lee, Jeung-Won
    • Journal of Korean Society of Rural Planning
    • /
    • v.19 no.1
    • /
    • pp.189-207
    • /
    • 2013
  • This study aimed to draw the plan elements and characteristics that should be considered in case when developing guidelines to build up roads in rural villages. Drawing the construction elements necessary for building up roads through the advanced researches, the survey was conducted for relevant experts in order to evaluate the importance of each plan element of route plan, design & construction and operation & management. The result determined total 105 contents that should be considered in case when building up roads in rural villages. The study on building up roads in rural villages as a strategy to vitalize rural areas means universal roads that connect each village with rural amenities in various values like walking tour road, visit roads and observation roads. It is considered that the development of guidelines for building up roads in rural villages could be used as a basic data to build up roads where nature, culture and history of rural areas can be effectively experienced and enjoyed.

Determinants and Processes of Morphological Transformation of Apartment Complexes in Busan (부산 아파트 단지 배치형태 변화의 요인과 과정에 관한 연구)

  • Lee, Sangjin;Park, SoHyu
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.35 no.3
    • /
    • pp.91-102
    • /
    • 2019
  • This study explores the causes and processes of morphological transformation of apartment complexes in Busan. All apartment complexes built until the year 2016 were selected for statistical analysis, drawing/map examination, field observation, selected expert interviews based on 6 periodical groups: Period I(~1990), Period II(1991~1995), Period III(1996~2000), Period IV(2001~2005), Period V(2006~2010), and Period VI(2011~2016). The research argues for three 'arrangement' types, P1U, L1U and P2U, which have dominated the whole periods occupying 88% of the total 260 complexes. The switch of the leading type represents for morphological transformation of apartment complexes. Four aspects, density(F.A.R.), height(maximum number of floors), deformed-building-type ratio, and building-orientation, have affected the change of 'arrangement' types. Density was the major cause of the arrangement-type switch, from P1U to L1U, on Period II(1991~1995). The morphological change, from type L1U to P2U, on Period V(2006~2010) was caused by height and orientation, and is correlated with the increased number of deformed-type buildings. The first phase morphological change on Period II(1991~1995) was resulted by the supply side of apartment. However, the second phase transformation on Period V(2006~2010) had gone through the complex process including reflection of consumers' demands. The significance of research is to reveal the morphological transformation process of apartment complexes through analytical investigation of the entire apartment data in Busan. The result shows that the major change of urban paysage started to occur from Period V(2006~2010), and the superficial evaluation on apartment 'being monotonous and repetitive' may not be proper at least from the perspective of town plan.