• Title/Summary/Keyword: Building Heights

Search Result 162, Processing Time 0.027 seconds

Explosive-Terror Risk Curve by RVS (RVS에 의한 폭발물테러 위험도 곡선)

  • Do, Ki-Young;Yoon, Sung-Won
    • Journal of Korean Association for Spatial Structures
    • /
    • v.13 no.3
    • /
    • pp.57-64
    • /
    • 2013
  • Since the terrorist attacks 9.11 in 2001, the public places such as subway, department stores or office buildings have become a target of terror in major public facilities. In this paper, for the prevention of terrorist attack in domestic building, the assessments of terror risk were conducted and their relationship with building heights was discussed through FEMA 455-Rapid Visual Screening(RVS). Explosive terror risk tends to increase rapidly with building heights(H<230m), showing the correlation coefficient between total risk and building heights(H<230m) is 0.93. In addition, The average of consequences is 8.47 and that of' threat is 8.95. Vulnerability is found to be 6.62 in average.

A Study on the Criteria of Landscape Planning and Design - Focusing on the Harmony of Building-Heights and Mountain-Skyline - (경관계획 및 설계 기준에 관한 연구 - 건축물 높이와 산림스카이라인의 조화를 중심으로 -)

  • Choi, Hyung-Seok
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.11 no.1
    • /
    • pp.39-51
    • /
    • 2008
  • These days, one of the issues well discussed is the obstruction or screen of sight to mountain-skyline by buildings. So question is to which heights buildings should be constructed over mountain-skyline and then harmony can be realized between mountain-skyline and building-outline. Based on the mentioned above, this study intends to find out the proper projection- level of buildings over background mountain-skyline when considering the types of mountain-skyline, building-outline and building-layout. The results of this study are first, the proper projection-ratio of buildings over background mountain-skyline can be 0.1 because assessment values on harmony-level are more than 3.0 in almost cases, second, the building-outline influences on the assessment values of harmony-level when the types of mountain-skyline are formed left-high & right-low and right-high & left-low, third, building-layout doesn't influence on the assessment va lues of harmony-level, finally, statistically difference doesn't exist between expert group and non-expert group in the assessment values of harmony-level.

A Study on the Preservation and Management Technique of Urban Skylines (도시 스카이라인 보존.관리 기법에 관한 연구(II))

  • 임승빈;박창석;김성준
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.22 no.3
    • /
    • pp.105-120
    • /
    • 1994
  • The major purpose of this study is to suggest a comprehensive and systematic process for the preservation and management of urban skylines. The city of Seoul has been selected as a case study for this process. The results of this study are summarized as follows; 1) An urban landscape masterplan needs to be established before the preparation of the preservation and management plan for urban skylines. 2) Preservation and management plans for urban skylines are suggested in the case Mt. Nam, Han River, Mt. Kwanak in Seoul city. In the case of Mt. Nam and Mt. Kwanak, the control of building heights and guidelines for building height have been studied. For the Han River, various alternatives in building height and disposition have been investigated for the enhancement of the visual quality. 3) Two major steps are suggested for the effective preservation and management of urban skylines. The first step is to prepare an urban landscape masterplan for the whole city, to delineate the skyline preservation area, and to fix controls on building heights in the area. The second step is to divide the whole city into landscape units, to make detailed landscape masterplan for each the units, and to fix controls on building heights in the units. However, only the first step will be necessary in a small city.

  • PDF

A Study on the Proper Definition of Ground Level under the Building Act - Difference of heights which is over 3 meters - (고저차 3m 이상 지표면의 가중평균지표면 산정방법에 관한 연구)

  • Min, Young-Gi;Kim, Soo-Young
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.9 no.1
    • /
    • pp.91-98
    • /
    • 2009
  • My questionaire survey revealed that even those experts that engage in architectural design did not precisely understand much of the regulations concerning ground-level. In terms of restricting the size of the building area, the generous policy of excluding balconies and basements from the calculation of building size actually causes problems. As far as the right to sunshine is concerned, the weighted average ground-level is determined to be the ground-level standard of the neighboring plot when the neighboring plot is a sloping bare ground. When the difference of heights is over 3 meters, it would be appropriate to assess the weighted ground-level standard every 3 meters.

  • PDF

Research on Relationship between Natural Vibration Periods and Structural Heights for High-rise Buildings and Its Reference Range in China

  • Xu, Peifu;Xiao, Congzhen;Li, Jianhui
    • International Journal of High-Rise Buildings
    • /
    • v.3 no.1
    • /
    • pp.49-64
    • /
    • 2014
  • Natural vibration period is an important parameter for high-rise building, Based on 414 high-rise buildings completed or passed over-limit approval in China, the distribution law of natural vibration periods is analyzied. In order to satisfy the design requirements, such as global stability, story drift limit and minimum shear-gravity ratio, the reference ranges of fundamental periods $T_1$ are $0.3{\sqrt{H}}{\sim}0.4{\sqrt{H}}$ when the structural heights $H{\geq}250m$, when 150 m ${\leq}$ H < 250m, $T_1=0.25{\sqrt{H}}{\sim}0.4{\sqrt{H}}$, when 100 m ${\leq}$ H < 150 m, $T_1=0.2{\sqrt{H}}{\sim}0.35{\sqrt{H}}$, when 50 m $ {\leq}$ H < 100m, $T_1=0.15{\sqrt{H}}{\sim}0.3{\sqrt{H}}$. These can provide reference data for controlling mass and rigidity of high-rise buildings.

Extraction of 3D Building Information using Shadow Analysis from Single High Resolution Satellite Images (단일 고해상도 위성영상으로부터 그림자를 이용한 3차원 건물정보 추출)

  • Lee, Tae-Yoon;Lim, Young-Jae;Kim, Tae-Jung
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.14 no.2 s.36
    • /
    • pp.3-13
    • /
    • 2006
  • Extraction of man-made objects from high resolution satellite images has been studied by many researchers. In order to reconstruct accurate 3D building structures most of previous approaches assumed 3D information obtained by stereo analysis. For this, they need the process of sensor modeling, etc. We argue that a single image itself contains many clues of 3D information. The algorithm we propose projects virtual shadow on the image. When the shadow matches against the actual shadow, the height of a building can be determined. If the height of a building is determined, the algorithm draws vertical lines of sides of the building onto the building in the image. Then the roof boundary moves along vertical lines and the footprint of the building is extracted. The algorithm proposed can use the shadow cast onto the ground surface and onto facades of another building. This study compared the building heights determined by the algorithm proposed and those calculated by stereo analysis. As the results of verification, root mean square errors of building heights were about 1.5m.

  • PDF

Urban Area Building Reconstruction Using High Resolution SAR Image (고해상도 SAR 영상을 이용한 도심지 건물 재구성)

  • Kang, Ah-Reum;Lee, Seung-Kuk;Kim, Sang-Wan
    • Korean Journal of Remote Sensing
    • /
    • v.29 no.4
    • /
    • pp.361-373
    • /
    • 2013
  • The monitoring of urban area, target detection and building reconstruction have been actively studied and investigated since high resolution X-band SAR images could be acquired by airborne and/or satellite SAR systems. This paper describes an efficient approach to reconstruct artificial structures (e.g. apartment, building and house) in urban area using high resolution X-band SAR images. Building footprint was first extracted from 1:25,000 digital topographic map and then a corner line of building was detected by an automatic detecting algorithm. With SAR amplitude images, an initial building height was calculated by the length of layover estimated using KS-test (Kolmogorov-Smirnov test) from the corner line. The interferometric SAR phases were simulated depending on SAR geometry and changable building heights ranging from -10 m to +10 m of the initial building height. With an interferogram from real SAR data set, the simulation results were compared using the method of the phase consistency. One of results can be finally defined as the reconstructed building height. The developed algorithm was applied to repeat-pass TerraSAR-X spotlight mode data set over an apartment complex in Daejeon city, Korea. The final building heights were validated against reference heights extracted from LiDAR DSM, with an RMSE (Root Mean Square Error) of about 1~2m.

Superframed Conjoined Towers for Sustainable Megatall Buildings

  • Moon, Kyoung Sun
    • International Journal of High-Rise Buildings
    • /
    • v.10 no.3
    • /
    • pp.179-191
    • /
    • 2021
  • Tall buildings have generally been developed as solo towers. With the increase of the heights of tall buildings from about 10-story buildings to supertall and megatall buildings, their structural systems have evolved from interior structures to exterior structures and combined/mixed systems. This paper reviews structural systems developed for solo supertall and megatall buildings and discusses the challenges they face in terms of structural performance and architectural design as the building heights are ever increased. As a viable and more sustainable design alternative to extremely tall solo towers, superframed conjoined towers are presented. Their structural performances are investigated in comparison with solo tower structures. Further, architectural potentials of superframed conjoined towers are explored through design studies.

Spatial Analysis by Matching Methods using Elevation data of Aerophoto and LIDAR (항공사진과 LIDAR 표고 데이터의 매칭 기법에 의한 공간정보 분석 연구)

  • Yeon, sang-ho;Lee, Young-wook
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2008.05a
    • /
    • pp.449-452
    • /
    • 2008
  • The building heights of big cities which charged with most space are 3-D information as relative vertical distance from ground control points, but they didn't know the heights using contour with maps as lose of skyline or building heights for downtown, practically continuously developed of many technology methods for implementation of 3-D spatial earth. So, For the view as stereos of variety earth form generated 3-D spatial and made terrain perspective map, 3-D simulated of regional and urban space as aviation images. In this papers, it composited geospatial informations and images by DEM generation, and developed and presented for techniques overlay of CAD data and photos captured at our surroundings uses. Particularly, The airborne LiDAR surveying which are very interesting trend have laser scanning sensor and determine the ground heights through detecting angle and range to the grounds, and then designated 3-D spatial composite and simulation from urban areas. Therefore in this papers are suggested ease selections on the users situation by compare as various simulations that its generation of 3-D spatial image by collective for downtown space and urban sub, and the implementation methods for more accurate, more select for the best images.

  • PDF

An Analysis of Factors Influencing the Landscape of Gyeong Po Lake and the Establishment of Criteria for Height Control (경포호 주변의 경관영향요인 분석과 고도기준설정)

  • Kim, Tae-Kyung;Kim, Choong-Sik
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.37 no.2
    • /
    • pp.104-113
    • /
    • 2009
  • Gyeong Po in Gangneung is highly recognized as a scenic area that is home to twelve traditional pavilions which are still in existence today. Since the modification of the Natural Park Act in 2007, there has been serious concern about the regulation of the heights of buildings surrounding Gyeong Po. In light of this, the present study aims to provide some guidelines for the regulation of building height in the modified Natural Park Act on the basis of investigations of landscape characteristics of Gyeong Po and the psychological influences of changing building heights. The analysis of the view from the pavilions located around Gyeong Po Lake indicated that the strategic landscape control points were Gyeong Po Dae and Bang Hae pavilions in terms of landscape management. These two landscape control points were considered as points from which people could view the greatest part of the landscape surrounding Gyeong Po Lake. The results of a preference analysis revealed that the views from Gyeong Po Dae to Juk Do were of relatively higher preference than the view from Bang Hae pavilion. This finding emphasized the importance of landscape management in Juk Do and its surroundings. A factor analysis resulted in three factors including attractiveness, tranquility, and orderliness. A comparison of the magnitude of influence of these three factors showed that the order of influence to preference was: attractiveness>tranquility>orderliness. These results highlight the need to introduce landmarks or unique buildings into the areas because the panoramic views of Gyeong Po Lake are relatively flat as lake views go. There should also be a variety of skylines harmonizing with the natural landscapes and landscape management for building groups, rather than individual building control, to enhance tranquility. Analysis of the psychological effects of building height suggests that, regardless of view points, preference was split at a 30 meter building height. This was indicative that viewer preference would drop when building heights are controlled to allow heights over 30 meters. The present study was not able to take varying view points and story heights into account. A more detailed study considering building types, the arrangement of buildings and the number of building stories is needed for effective landscape management in the Gyeong Po Dae area.