• Title/Summary/Keyword: Building Design Control System

Search Result 485, Processing Time 0.023 seconds

A Study on Fire Performance Evaluation of EIFS on Anti-Flaming Finish by Cone Calorimeter Test (콘칼로리미터에 의한 외단열시스템의 방염 화재성능평가를 위한 연구)

  • Min, Se-Hong;Sun, Ju-Seok;Kim, Sang-Chul;Choi, Yong-Mook;Lee, Seok-Ki
    • Fire Science and Engineering
    • /
    • v.26 no.3
    • /
    • pp.106-111
    • /
    • 2012
  • In this study, EIFS (Exterior insulation finish system) of exterior cladding was applied Cone calorimeter test to confirm the effect of flame retardant. As a results, the initial ignition points in accordance with the coated form and concentration of the flame retardant was delayed. But flame resistant treatment of EIFS cladding to control the fire will not affect confirmed that. In addition, EIFS that uses high-density and low-density due to difference in the density of the impact of the fire was no difference. The exterior of the ignition experiment occurred before and after 40 seconds, heat release rate to 100 seconds appears to occur about 90 % compared with the other exterior wall materials, the initial fire spread very fast was confirmed. EIFS cladding in order to prevent the spread of fire in the application of EIFS legally use is limited by the use of the building. And flame spread can be prevented, such as a vertical outer wall compartment measures are urgently needed.

A Study on Classification System for Gong-Po-Do Style in Tomb Wall Paintings of Koguryo (고구려 고분벽화 공포도 형식의 분류체계에 관한 연구)

  • Hwang, Se-Ok
    • Korean Journal of Heritage: History & Science
    • /
    • v.49 no.2
    • /
    • pp.20-55
    • /
    • 2016
  • Koguryo's tomb mural paintings in North Korea are our precious cultural heritage which have been designated as UNESCO World Heritage property receiving high praise in the following criterion, i) exceptional creativeness of human being, ii) representative value showing the stage of development in construction history of East-Asia, iii) aesthetic superiority iv) uniqueness of building construction including tombs' ceiling. Mural paintings have been found from almost 100 tombs of the Koguryo dynasty out of 130 which are scattered across Huanren County, Lianoning Province, Ji'an, Jilin Province in China and Pyongyang in North Korea. Especially, most of them are gathered in Pyongyang from 4th and 5th century. Peculiarly, some of them have been constructed before King Jangsu's transfer of the capital to Pyongyang(AD 427). It can be regarded that Pyongyang territory had been under control of Koguryo and to become a new capital in the near future. And dense emergence of such tombs since the capital transfer from Gungnae City to Pyongyang during the reign of Jangsu is linked closely to the construction of tombs for rulers under strengthen royal authority of Jangsu and centralized system of authoritarian rule. Tomb mural paintings describe the owner's figure pictorially based on the truth just as in his living years. General lifestyles of ruling powers and sovereigns can be seen from the wall paintings portraying several buildings with various styles, figures, manners of living, which are considered that the tomb owner had led politically and sociologically in his life. In spite of not enough proofs to approve figure of architectures or "Gong-Po" in wall paintings on the tombs as those of Koguryo, it is persuasive with consideration for painting and decoration inside the tomb like wooden building in real life for the purpose of reenacting and continuing the tomb owner's luxurious life after death. "Du-Gong-Po-Zak" had appeared in company with Koguryo tomb murals and it can be found in most of the murals. And the emergence of substantial "Gong-Po-Do" can be counted more than a century ahead of the figure in murals. It could be a reasonable assumption as regards Koguryo tomb murals time of appearance match up with production period of Gahyungmyunggi(家形明器) and Hwasangseok(畵像石) Hwasangjeon(畵像塼) Design in the Mural Painting of the East-Han(東漢) Ancient Tombs in China. On this study, architectural "Gong-Po"s described in Koguryo tomb murals are categorized largely in "Bi(non)-Po-Zak-kye", "Jun(semi)-Po-Zak-kye", and "Po-Zak-kye" based on presence of "Ju-Du", "Cheom-Cha", and "Cheom-Cha-Sal-Mi" with developmental aspect, and, "Po-zak" is subdivided as "Bi(non)-Cheul-Mok" and "Cheul-Mok" types.

A numerical study on effects of thermal buoyance force on number of jet fans for smoke control (도로터널 화재시 열부력이 제연용 제트팬 댓수에 미치는 영향에 대한 해석적 연구)

  • Yoo, Ji-Oh;Shin, Hyun-Jun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.15 no.3
    • /
    • pp.301-310
    • /
    • 2013
  • Jet fans are installed in road tunnels in order to maintain critical velocity when fire occurs. Generally the number of jet fans against fire are calculated by considering critical velocity and flow resistance by wall friction, vehicle drag force, thermal buoyance force and natural wind. In domestic case, thermal buoyance force is not considered in estimating the number of jet fans. So, in this study, we investigated the pressure loss due to the thermal buoyance force induced by tunnel air temperature rise and the impact of thermal buoyance force on the number of jet fans by the numerical fire simulation for the tunnel length(500, 750, 1000, 1500, 2000, 3500m) and grade (-1.0, -1.5, -2.0%). Considering the thermal buoyance force, number of jet fans have to be increased. Especially in the case of 100MW of heat release rate, the pressure loss due to thermal buoyance force exceed the maximum pressure loss due to vehicle drag resistance, so it is analyzed that number of 2~11 jet fans are needed additionally than current design criteria. Thus, in case of estimating the number of jet fans, it must be considered of thermal buoyance force induced tunnel air temperature rise by fire.

Development of a Decision Making Model for Construction Management in LNG Plant Construction - Focused on Construction Stage - (LNG 공사의 건설사업관리 의사결정지원모델 개발 - 시공단계 중심 -)

  • Park, Hwan Pyo;Han, Jae Goo;Chin, Kyung Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.3
    • /
    • pp.47-57
    • /
    • 2014
  • LNG plant projects tend to be implemented in overseas owing to its characteristics, so their project management scheme is somewhat different from those of general projects. Value chain in a LNG plant project includes exploration/production of gases, physical liquefaction/chemical conversion processes, transportation and storage. Key factors in the chain include liquefaction process (including ultra-low temperature liquefaction) to convert natural gas into liquid materials or fuel, and Front End Engineering Design (FEED) package, as well as Engineering, Procurement and Construction (EPC) technology comprising control, operation and construction. Success of a complex LNG plant project implemented in overseas depends on decision-making process in project management. Accordingly, to develop a decision-making model in of plant construction, the study extracted none factors in project management by EPC stage and assessed importance of each factor. The result showed that items in both project management and project risk management are important. Especially, the study developed a decision-making model in the construction stage of a LNG plant project based on the project management factors and importance assessment. The developed decision-making model would lay groundwork in building a decision-making system in construction stage of project management.

Case Study on Economical Fabrication and Erection of Steel Structure and Reduction in Field Erection Time (경제적 철골제작$\cdot$설치 및 공기단축 사례분석연구)

  • Ahn Jae-Bong;Choi Yoon ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.5 s.21
    • /
    • pp.183-192
    • /
    • 2004
  • Even in Korea the number of steel structure buildings that allow internal space and easy change of their layouts in accordance with the purpose of buildings and box-type steel bridges constructed with thick plates with thickness in a rage just from a few $\beta$AE to \$100\beta$AE is increasing these days and therefore, domestic fabrication and processing technology of members for steel structures is being improved at a pace faster than in the past to meet the growing requirements of consumers for high reliability on quality control on the related steel structures. However, most domestic fabricators os steel structures who are turning out their steel products in accordance with the designs prepared by engineering companies in their respective works for the sake of cost cut more than anything else, hesitating to introduce any advanced new technology into themselves. In the case of the steel structure design application for small and mid-size buildings in particular, it is quite meaningful not only for those who are involved in steel structure business, but also for the people working at construction work fields to review the result of the study on the connections of steel structure members deigned to obtain superb quality of steel structures within short period for steel fabrication and erection at fields in economical ways, as there is a glowing tendency seeking standardization of connection of steel structure members as well as whole structure together with the development on design of construction system of buildings including their exterior and interior decoration materials, manufacture of the related members and fabrication technique structure. This paper has been prepared with the aim to review the peculiar characteristics of buildings constructed with the main frames of steel structures and actual cases of the change made ing the connections between steel structure columns and between columns and girder members in order to reduce the work period necessary for fabrication and erection of steel structures at the maximum as well as the some examples of steel structures fabricated through automatic welding by robots for box-type columns in addition to the description of the problems found in the course of fabricating those steel structures, suggesting possible counter-measures to solve them.