LCC 평가를 통한 지붕방수공법선정에 관한 연구 (A Study on Selection of Roof Waterproofing Method by analyzing Life Cycle Costing)

  • 최오영;김태희;김광희
    • 한국건축시공학회지
    • /
    • 제8권5호
    • /
    • pp.127-134
    • /
    • 2008
  • The purpose of this study is to propose the decision making technique in roof waterproofing method at the early construction stage. Selecting the suitable construction method is difficult because of the complex interrelationships between many factors of influencing the construction method selection. This study presents an example of selecting suitable method by analyzing LCC (Life Cycle Cost) in roof waterproofing work. In this study, roof waterproofing method is analyzed by LCC(Life Cycle Cost) which is consists of the initial costs, running costs, and removal costs. Sheet waterproofing, membrane waterproofing and asphalt waterproofing costs are compared to select the most economic method. The result of this study revealed that considering LCC is useful in selecting the proper method in the construction work.

소규모 시공현장 적정공사비 확보를 위한 원가기준 마련 연구 (A Study on Cost Standards for Securing Appropriate Construction Costs for Small-Scale Construction Sites)

  • 오재훈;안방율
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.347-348
    • /
    • 2023
  • In construction sites, small-scale construction quantities or limited work hours below the daily work volume may occur due to on-site conditions. For small-scale quantities, the input of equipment and labor is designed based on an hourly basis in the invoice, resulting in a difference from the actual cost. In this study, we aim to explore solutions from the perspective of construction cost standards to secure appropriate construction costs for small-scale and time-limited construction sites. Firstly, to preserve the basic construction costs on-site, we established standards where half the cost would be charged for construction quantities below four hours and a full day's cost would be designed for construction quantities between four to eight hours. Additionally, realistic construction cost calculation standards are expected to be provided by realizing a surcharge rate for work hour limitations to secure appropriate construction costs.

  • PDF

발코니 확장비용 가이드라인에 따른 창호 열성능 분석 (Analysis of Window Thermal Performance according to Guidelines on the Balcony Expansion Costs)

  • 최경석;강재식;이승언
    • 대한설비공학회:학술대회논문집
    • /
    • 대한설비공학회 2008년도 하계학술발표대회 논문집
    • /
    • pp.863-868
    • /
    • 2008
  • In accordance with the guidelines on the balcony structure changes in December 2005, most of tenants were moving into apartment housing, expand the balcony, but some large deviation between the price construction costs set of cases, due to overuse and the cause of the dispute, and the housing law amended in 2007 due to price cap system is implemented, the cost of expansion the balcony overdose pointed out that there is set to boost the sale price has been raised. These issues in order to improve the government in January 2008, the "Note costs by the balcony expansion" suggested guidelines to protect the rights of tenants and wants to promote the settlement of the sale price cap system. This study calculated the "Note costs by the balcony expansion" window system based on double or single, high performance insulation window system of the quantitative performance analysis of each type window that purpose.

  • PDF

MANAGERIAL AND ECONOMIC OPTIMIZATIONS FOR PREFABRICATED BUILDING SYSTEMS

  • Ahmed Abdallah
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.606-614
    • /
    • 2005
  • This paper deals with new realizations of research, scientific development, managerial and economic optimizations for prefabricated building systems. In the literature, all scientific fields are worked out based on the efficiencies, costs, benefits, choice of execution design, technical demands, aesthetical point of view, as well as the total economics. In the present example of a school-building for communities in the third world, the following criteria have been regarded: The optimal superstructure of prefabricated concrete building systems; the particularity of countries of the Third World (e.g. the climate, the political and the economic conditions); the time for construction and necessary innovative developments for an economically optimized superstructure. Added to this are alternative construction-methods and costs for a simple but variable system which can be adapted to changing functions, where variability should be the main point. For example, a school building that is to be adapted by varying number of rooms to cater for the growing number of pupils.

  • PDF

THE FINANCING MODEL FOR GREEN BUILDING PROJECTS WITH THE GOVERNMENTAL GUARANTEE BASED ON CER (Certified Emission Reduction)

  • Sang-Hyo Lee;Se-Woong Jang;Ju-Hyung Kim;Jae-Jun Kim
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.368-375
    • /
    • 2011
  • Along with the growing interest in greenhouse gas reduction, the effect of energy reduction from green buildings is gaining interest as well. However, green buildings may have difficulties in financing due to their high initial construction costs. With this in mind, the objective of this study is to suggest a financing model for green building projects with a governmental guarantee based on CER (Certified Emission Reduction). In other words, in the financing model, the government provides a guarantee for the increased costs of a green building project in return for CER. The suggested financing model was tested and found feasible for implementing green building projects. In addition, the model in this study is applicable to private projects because guarantee has its return. To utilize CER as a return for a financial guarantee, however, certification of CDMs (Clean Development Mechanism) for green buildings must be vitalized.

  • PDF

BMS 데이터를 활용한 콘크리트 교량의 결함-공법-비용 매핑 알고리즘 개발 (Development of Defect-Repair Method-Cost Mapping Algorithm of Concrete Bridge Using BMS Data)

  • 이창준;박원영;차용운;장영훈;박태일
    • 대한토목학회논문집
    • /
    • 제43권2호
    • /
    • pp.267-275
    • /
    • 2023
  • 최근 30년 이상 노후화된 국내 인프라의 증가로 한정된 예산 내에서 인프라 유지관리를 위한 정확한 유지관리 비용산출과 그에 따른 적절한 예산분배의 중요성이 증대되고 있다. 이에 본 연구에서는 콘크리트 교량의 대표적인 결함과 이에 대한 보수보강 공법들을 매칭하고 유지보수에 필요한 비용을 산정하였다. 표준품셈과 BMS (Bridge Management System) 데이터 분석을 통해 교량의 보수보강 공법을 분류하였으며, 결함의 위치와 종류, 크기에 따라 결함-공법을 매칭하였다. 그리고 표준품셈을 기준으로 단위당 작업량과 물량을 계산하여 노무비, 경비, 재료비를 구분하여 산출하였다. 서울시 교량 유지보수 내역서와 비교를 통해 평균 예측 정확도가 85.1 %가 나왔으며, 결함의 간단한 조건을 통해 유지보수 비용을 파악할 수 있다. 향후 현장 조건을 고려한 장비 및 야간작업 여부를 추가하여 더 높은 유지보수 비용을 파악할 수 있을 것으로 기대된다.

공동주택에 대한 부위별 공사비 산정에 관한 연구 - 사례 H사의 실행단가를 중심으로 한 연구 - (A Study on the Estimation of Elemental Costs for an Apartment Building)

  • 강현욱;유종환;김용수
    • 한국건설관리학회논문집
    • /
    • 제8권2호
    • /
    • pp.173-181
    • /
    • 2007
  • 본 연구의 목적은 사례 H사의 실행단가를 적용하여 사례대상 공동주택의 부위별 공사비를 산정 하는데 있다. 이를 위하여 실적공사비제도, 표준품셈제도, 공사비지수에 대해 고찰하고, 현행 공동주택 공사비 산정 방식의 문제점을 분석하였다. 다음으로 사례 H사가 시행한 공동주택 사례를 선정하여 부위별 분류체계를 정립한 후 하도급 업체와 거래한 실행단가를 분류하였다. 위와 같은 과정을 통하여 공동주택의 부위별 공사비 분류표를 작성하고, 이에 대한 활용방안을 제시하였다. 상기와 같은 목적과 방법으로 연구한 결론은 다음과 같다 첫째, 공동주택의 부위별 분류 체계를 정립하였고, 둘째, 부위별 분류 체계에 따른 공사비 분류표를 제시하였다.

피크부하용 혼소엔진발전의 경제성 분석 (An Economic Analysis on Dual-fuel Engine Generation for Peak Load)

  • 이옥배;안재경
    • 전기학회논문지
    • /
    • 제61권9호
    • /
    • pp.1260-1268
    • /
    • 2012
  • Recently, lack of power reserve margin was observed quite often. In this paper, we studied the method to secure power source for a short time, to cut the utility power peak load, and to reduce the users electricity bills. Emergency diesel generator of an office building is to be converted into a dual-fuel engine generator which is responsible for a portion of the peak load. Compared to the conventional diesel fuel generator, the proposed dual-fuel engine is able to reduce the generation power cost by dual-fuel combustion, and it also mitigates the building's utility power peak load by charging the building's peak load. If the dead resources (a group of emergency dual-fuel engine generators), as a Virtual Power Plant, are operating in peak time, we can significantly reduce future large power development costs. We investigated the current general purpose electricity bills as well as the records of the building electric power usage, and calculated diesel engine generator renovation costs, generation fuel costs, driving conditions, and savings in electricity bills. The proposed dual-fuel engine generation method reduces 18.1% of utility power peak load, and turned out to be highly attractive investment alternative which shows more than 27% of IRR, 76 million won of NPV, and 20~53 months of payback periods. The results of this study are expected to be useful to developing the policy & strategy of the energy department.

수평형 지중열교환기를 이용한 건물일체형 지열시스템의 도입타당성 분석 (The feasibility study for the building integrated geothermal system using the horizontal heat exchanger)

  • 채호병;남유진;윤성훈
    • 한국태양에너지학회 논문집
    • /
    • 제35권1호
    • /
    • pp.81-87
    • /
    • 2015
  • Recently, in order to prevent increasing energy usages in the international community, many countries have attempted to develop the innovative renewable energy systems. Among the renewable energy systems, Ground source heat pump(GSHP) system which supply the heating, cooling and hot water in the building has been attracted by its stability of heat production and high efficiency. However, the initial drilling costs become very expensive and the construction period takes longer the other systems, because GSHP system needs more than 100 m depth drilling. In this study, in order to reduce initial costs of the GSHP, the building integrated geothermal system using the horizontal heat exchanger was developed. The heating and cooling load in the standard housing model was calculated by a simulation and the system design capacity in the high-rise apartment was decided by the total load. Based on the system design capacity, the high-rise apartments were applied to a BIGS and vertical GSHP system and there are analyzed about initial costs. In the result, the initial cost of BIGS could reduce 24% of the initial cost of the vertical GSHP system.

사례분석을 통한 설계대가 기준 개선 방향 마련 기초연구 (Fundamental Rearch to Prepare a Direction to Improve the Design Fee Standard through Case Analysis)

  • 한재구
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 가을 학술논문 발표대회
    • /
    • pp.179-180
    • /
    • 2020
  • In the budgeting guidelines, there are rules for calculating design fee and direct costs. However, only the design fee is calculated excluding the direct cost, which causes the cost to be insufficient. Therefore, this study is designed to analyze representative cases where direct costs are insufficient, draw out problems, and propose a way to improve design fees.

  • PDF