• 제목/요약/키워드: Bridge maintenance

Search Result 989, Processing Time 0.021 seconds

Durability Evaluation of Hybrid Expansion Joint System with Improved Replacement (보수성을 개선한 복합형 신축이음장치(HRS) 내구성 평가)

  • Jung Woo Lee
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.27 no.2
    • /
    • pp.1-7
    • /
    • 2023
  • Durability was evaluated by performing a full-scale vertical load fatigue test and a wheel load performance test on the HRS, which reduces the replacement time of the existing expansion joint and improves serviceability to allow partial replacement by lane. As a result of the vertical load fatigue test, the maximum stress of the rail-type expansion joint is 170 MPa, which is about 47.8% of the yield strength of the HRS expansion joint rail 355 MPa. The vertical load fatigue test of the HRS expansion joint with improved serviceability set the size and load of the load plate according to the road bridge design standards, did not show any fracture behavior in the vertical load fatigue test and the wheel load performance test 2 million times, and its durability and safety were verified.

Tension Measurement of Stay Cables in Consideration with Image Including Vehicle (차량이 포함된 이미지를 고려한 사장재 케이블의 장력 측정 )

  • Sung-Wan Kim;Dong-Uk Park;Jin-Soo Kim;Seung-Su Park;Jae-Bong Park
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.27 no.2
    • /
    • pp.58-66
    • /
    • 2023
  • In this study, cable tension was measured using the vibration method, and a vision-based system was applied as a sensor to measure the displacement response of a cable in a non-contact method. In the vision-based system, the camera is installed in a location that considers the target structure and the field of view of the camera. However, it can be difficult to recognize the control points required to measure the displacement response of a structure as the target structure and other structures such as vehicles may be included in the image at the intended installation location. In this study, a distorted image including a vehicle shows inaccurate results in image analysis due to the installation position of the vision-based system. Accordingly, the image including the vehicle was eliminated by calculating the similarity between the two images. To verify the validity of the method of estimating the cable tension of cable-stayed bridges using the proposed method, the vibration method was applied to cable-stayed bridges in service to measure the tension.

A Study on Approximate Analysis of Steel Deck Bridges with Guss Asphalt Using Influence Line (영향선을 이용한 강상판 교량의 구스 아스팔트 포장에 대한 근사해석 연구)

  • Seo, Ki-Hong;Ka, Hoon;Kong, Min-Sik;Yhim, Sung-Soon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.10 no.4
    • /
    • pp.127-135
    • /
    • 2006
  • In this study, steel deck bridges are chosen as analytic model to show the structural behaviors generated by high temperature of pavement and to formulate the simplified approximate analysis of thermal effects. In general, the thermal effect is changed by the material property of pavements and environmental temperature as well as shape, size and boundary conditions of bridge. Specially, this effect is the representative initial stress problem dependent on time. The thermal effect, however, does not depend on time and thermal effect is regarded as initial load in this study. After these thermal loading is modelled as moving loads, influence lines of reactions of shoes are calculated and the successive pavement steps with arbitrary segments are determined to minimize the thermal effect of shoes by influence line.

Comparison of Reliability of PSSC Girder Bridge for Different Limit States (PSSC 거더 교량의 한계상태별 신뢰도 비교)

  • Hwang, Chul-Sung;Paik, In-Yeol
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.11 no.1
    • /
    • pp.171-180
    • /
    • 2007
  • Reliability analysis of prestressed steel and concrete(PSSC) girders is conducted for deflection, stress and moment strength limit state. PSSC girder has strong advantages in terms of construction cost and vertical clearance for the span length of over 40 meters. In this paper, example PSSC girders with different span lengths, section dimensions and design stress levels are designed and analyzed to calculate the midspan deflection, stress and the section moment strength. Deflection limit state, stress limit state and strength limit state functions are assumed and the reliability indexes are obtained by Monte-Carlo simulation and Rackwitz-Fiessler procedure. The results show that the reliability of PSSC girder for deflection limit state is appropriately higher than the stress limit state and the reliability for moment strength is significantly conservative.

Structural Health Monitoring System Employing Smart Sensor Technology Part 1: Development and Performance Test of Smart Sensor (스마트 센서 기술을 이용한 구조물 건전도 모니터링 시스템 Part I : 스마트 센서의 개발과 성능평가)

  • Heo, Gwang Hee;Lee, Woo Sang;Kim, Man Goo
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.11 no.2
    • /
    • pp.134-144
    • /
    • 2007
  • In this study, a smart sensor unit is developed by using the smart sensor technology that is being rapidly developed in recent years for structural health monitoring system, and its performance is evaluated through various experiments, and also, damage detection experiment is performed on a model structure. This paper as the first half of this study contains the development and performance evaluation of the smart sensor. In the latter half of this study, structure damage detection experiment is performed for the application of verified smart sensor unit into structural health monitoring, and it is compared with a wire measurement system. The smart sensor is developed by using high-power wireless modem, MEMS Sensor and AVR microcontroller, and an embedded program is also developed for the control and operation of the sensor unit. To verify the performance of the smart sensor, many experiments are performed for sensitivity and resolution analysis tests, data acquisition by using cantilever beam and shaker, and on-site application using actual bridge. As a result, the smart sensor proves to be satisfactory in its performance.

Experimental Study on Application of Multi-Stepwise TPSM (다단계 온도프리스트레싱 공법의 현장적용을 위한 실험적 연구)

  • Ahn, Jin-Hee;Kim, Jun-Hwan;Kim, Sang-Hyo;Lee, Sang-Woo
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.12 no.1
    • /
    • pp.91-100
    • /
    • 2008
  • Multi-stepwise Thermal Prestressing Method(TPSM) is a newly proposed prestressing method, which is combined the external prestressing method and the external bonding method. Multi-stepwise thermal prestressing force is induced by cooling process of cover-plate in the multi-stepwise temperature distribution after the cover-plate being bolted to the girder. In this study, the heating capacity test of the developed heating system for applying the multi-stepwise TPSM effectively and multi-stepwise TPSM inducing test of H-beam is performed. Also, a field test of the rhamen type temporary bridge is carried out to evaluate the effect and application of the multi-stepwise TPSM. Truck load was loaded and compared with the structure analysis results.

Experimental Evaluation of Reserve Capacities for Connection Details between Steel Pipe Pile and Concrete Footing of Type-B (Type-B방식의 강관말뚝과 확대기초 연결부 상세에 따른 보유내력의 실험적 평가)

  • Han, Sang-Hoon;Hong, Ki-Nam;Kwon, Yong-Kil
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.12 no.1
    • /
    • pp.183-192
    • /
    • 2008
  • Generally, application of steel pipe pile as deep foundation member needs special requirement for the connection method between steel pipe pile and concrete footing. Even though two types of connection method are suggested in the korea highway bridge code, type-B method is prevalent. In this study, vertical, lateral, and tension loading test are done for two types of type B connection to review stress concentration, formation and behavior of imaginary RC column in the footing. Welding type and hook type as the connection method are considered in this study. Test results show that welding type have the more reserve capacity than hook type and the specimens connected by the welding type behave as the imaginary RC column in the footing. However, the specimens connected by the hook type did not behave as the imaginary RC column in the footing but behave as the hinge.

A Study on Temperature Properties Analysis for Tension Measurement of Steel Cables Using Magnetic Sensor (자기센서에 의한 강재 케이블 장력측정에서 온도특성에 대한 연구)

  • Park, Hae-won;Ahn, Bong-young;Lee, Seung-seok;Park, Jeong-hak
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.13 no.2 s.54
    • /
    • pp.181-188
    • /
    • 2009
  • Measuring the tensile strength of steel cables used to support bridges is a critical inspection item in terms of the safety of a bridge. Today, cable tension is measured with the vibration method and loadcell. Recently, some advanced countries have conducted studies on measuring tension with magnetic method and are suggesting prospective results. Since there were no such studies ongoing in Korea, we began a study on measuring tension with magnetic method as we are undergoing researches to improve the precision of measurements. It is necessary to consider the influence for the magnetic field and the temperature of steel cables in tension measurement of magnetic method. In this paper, we tested an output characteristic of tension sensor according to temperature and deduced temperature compensation coefficient in the given magnetic field and applied the compensation coefficient to the tension measurement system in the lab. We analyzed and evaluated testing results for the output voltages of the tension sensor according to cable tensions.

Crack Example and Crack Control Method of Very-Early Strength Latex-Modified Concrete (초속경 라텍스개질 콘크리트의 균열발생 사례 및 억제방안)

  • Choi, Pan-Gil;Yun, Kyong-Ku;Lee, Bong-Hak
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.13 no.3 s.55
    • /
    • pp.173-180
    • /
    • 2009
  • Very-early strength latex-modified concrete(below ; VES-LMC) was developed for possible early-opening-to-traffic after overlay of bridge deck concrete. The purpose of this study is to analyze the cause of map, transverse and longitudinal cracking in VES-LMC and to provide a control method for minimizing occurrence of cracking. The proposed prevention method against map and transverse cracking was verified by field data. VES cement was modified as the unit cement content was reduced from 390kg/$m^3$ to 360kg/$m^3$. The maximum size of coarse aggregate was increased from 13mm to 19mm. The wire mesh and steel fiber were adopted in concrete mixture. From the results, the proposed prevention method against map and transverse cracking was verified since structural cracking was not occurred until 3 years after overlay.

Estimation of Safety and Economical Efficiency of Large High Tension Bolted Joints (대직경 고장력볼트 이음부의 안전성 및 경제성 평가)

  • Sung, Ki-Tae;Kyung, Kab-Soo;Lee, Seung-Yong
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.13 no.6 s.58
    • /
    • pp.97-105
    • /
    • 2009
  • This study was conducted for the purpose of examinating the safety and economical efficiency of large high tension bolted joints. The specimen using F10T-M30 large high strength bolts has been selected and static tensile test has been conducted to evaluate the slip characteristics. In addition, finite element analysis has been carried out to estimate the number of required bolts. As a result, the average slip coefficient of M30 high strength bolts exceeded 0.4 - the standard in highway bridge design specification - and has satisfied the slip strength, which is the same as that of M22 high strength bolts. In addition, if F13T-M22 high strength bolts were applied, the number of required bolts decreased by 21%, and if F10T-M30 high strength bolts were applied, the number of required bolts decreased by 46%, that leads to the conclusion that the economical efficiency in accordance with diametering of high strength bolts was now verified.