Traffic-induced vibrations at the wet joint during the widening of concrete bridges and non-interruption traffic control strategies

  • Junyong Zhou;Zunian Zhou;Liwen Zhang;Junping Zhang;Xuefei Shi
    • Computers and Concrete
    • /
    • v.32 no.4
    • /
    • pp.411-423
    • /
    • 2023
  • The rapid development of road transport has increased the number of bridges that require widening. A critical issue in the construction of bridge widening is the influence of vibrations of the old bridge on the casting of wet joint concrete between the old and new bridges owing to the running traffic. Typically, the bridge is closed to traffic during the pouring of wet joint concrete, which negatively affects the existing transportation network. In this study, a newly developed microscopic traffic load modeling approach and the vehicle-bridge interaction theory are incorporated to develop a refined numerical framework for the analysis of random traffic-bridge coupled dynamics. This framework was used to investigate traffic-induced vibrations at the wet joint of a widened bridge. Based on an experimental study on the vibration resistance of wet joint concrete, traffic control strategies were proposed to ensure the construction performance of cast-in-site wet joint concrete under random traffic without interruption. The results show that the vibration displacement and frequency of the old bridge, estimated by the proposed framework, were comparable with those obtained from field measurements. Based on the target peak particle velocity and vibration amplitude of the wet joint concrete, it was found that traffic control measures, such as limiting vehicle gross weight and limiting traffic volume by closing an additional traffic lane, could ensure the construction performance of the wet joint concrete.

Reliability-Based Assessment of Structural Safety of Regid-Frame-Typed Segmental PSC Box Girder Bridges Erected by the FCM during Construction (FCM에 의한 라멘식 세그멘탈 PSC박스거더 교량의 신뢰성에 기초한 시공간 구조안전도평가)

  • Cho, Hyo-Nam;Joo., Hwan-Joong;Park, Kyung-Hoon;Moon, Kyung-Ho
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.6 no.1
    • /
    • pp.131-140
    • /
    • 2002
  • In this paper, a limit state model based on the analysis of structural behavior of segmental prestressed concrete box girder bridges and reliability-based safety assessment method are proposed for the bridges erected by free cantilever method. Strength limit state models for prestressed concrete box girder and rigid-frame type columns are developed for a structural safety assessment during construction. Based on the proposed limit state models, the reliability of the bridge is evaluated by using the Advanced First Order Second Moment method. The proposed model and method are applied to the Seo-Hae Grand Bridge built by FCM in order to verify its effectiveness in the safety assessment during construction of the kind of bridges. The sensitivity analyses of the main parameters are also performed in order to identify the important factors that need to be controlled for the safety of the bridges during construction.

Applications of bridge information modeling in bridges life cycle

  • Marzouk, Mohamed M.;Hisham, Mohamed;Al-Gahtani, Khalid
    • Smart Structures and Systems
    • /
    • v.13 no.3
    • /
    • pp.407-418
    • /
    • 2014
  • The purpose of this paper is to present an Integrated Life Cycle Bridge Information Modeling that can be used throughout different phases of the bridge life cycle including: design, construction, and operation and maintenance phases. Bridge Information Modeling (BrIM) has become an effective tool in bridge engineering and construction. It has been used in obtaining accurate shop drawings, cost estimation, and visualization. In this paper, BrIM is used as an integrated tool for bridges life cycle information modeling. In the design phase, BrIM model can be used in obtaining optimum construction methods and performing structural advanced analysis. During construction phase, the model selects the appropriate locations for mobile cranes, monitors the status of precast components, and controls documents. Whereas, it acts as a tool for bridge management system in operation and maintenance phase. The paper provides a detailed description for each use of BrIM model in design, construction, and operation and maintenance phases of bridges. It is proven that BrIM is an effective tool for bridge management systems throughout their life phases.

An Experimental Study on the Flexural Fatigue Fracture Behavior of RC Slab of Widened Bridge (교량 확폭시 RC 상판 접합부의 휨 피로파괴거동에 관한 실험적 연구)

  • 박영훈;전준창;조병완;장동일
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1994.04a
    • /
    • pp.13-18
    • /
    • 1994
  • Most widened bridges have been constructed by the joining-construction method that makes new and existing bridge structurally single structure. However, joing-construction method has several problems in design and construction viewpoint. Therefore, this study is conducted in order to investigate structural behavior of widened RC slab and traffic-induced vibration of existing bridge during placing and curing of new concrete by the prototype flexural fatigue test. From the results of this study, it is shown that stress-concentration and slip occur between concrete and reinforcing rod at joint section but the reduction of load carrying capacity and of fatigue strength is negligible according to the traffic-induced vibration as well as the difference of construction method. A reasonable construction method for the bridge widening which takes into account the effects of the traffic-induced vibration and S-N curve for the widened bridge are also proposed.

  • PDF

Risk Analysis of Suspension Bridge by a Linear Adaptive Weighted Response Surface Method (선형 적응적 가중 응답면기법에 의한 현수교의 위험도 분석)

  • Cho, Tae Jun;Kim, Lee Hyeon;Cho, Hyo Nam
    • Journal of Korean Society of Steel Construction
    • /
    • v.20 no.1
    • /
    • pp.93-104
    • /
    • 2008
  • study deals with the reliability assesment for the 5-year phases of a suspension bridge construction in Korea. The main objectives of this study are; (1) the evaluation of the reliability of a suspension bridge by considering an ultimate limit state for the fracture of main cable wires, (2) the determination of the critical phases among 28 construction stages for the deck erection, and (3) the evaluation of the reliability of the limit state for the erection control during construction stages. The research and the design of the suspension bridge have been focused on the state of construction mainly based on empirical data. Based on the recent survey of the distribution of accidents in Korean railways, over 80% of the accidents related to the uncertainties in human error, planning, design, materials and loads during construction have ben reported before the completion of construction. While many researches have evaluated the safety of bridges, the uncertainties in the construction phases have not been well treated in a guidelines or a specifications. An improved adaptive response surface method is used for the risk assessment in the construction phases of the target suspension bridge.

Civil Engineering Conference in the Asian Region, Visit to Several Road and Bridge Construction Site of Japan (아시아 토목대회 및 일본 도로 교량건설 현장 시찰)

  • 장래섭
    • Journal of the Korean Professional Engineers Association
    • /
    • v.34 no.4
    • /
    • pp.17-29
    • /
    • 2001
  • After participating in the 2nd, Asian Civil Engineering Conference which is subjected by Japan, a trip of site during construction recent was done. The country Is being developed to use effectvely by the methods of aqua-line, truss suspersion bridge. double deck bridge, etc. The Japanese engineers have a pride to do their best for the construction In the given environment. 1 want to notify that our civil engineers must have the responsibility to develop the technical engineering, to make the useful country and to resolve the environmental problem via the oversea experience like as.

  • PDF

Evaluation of Cable Tension Forces Using Vibration Method for a Cable-stayed Bridge under Construction (진동법을 이용한 사장교의 시공 중 장력 평가)

  • Cho, Soojin;Yun, Chung-Bang;Sim, Sung-Han
    • Journal of the Korean Society of Safety
    • /
    • v.29 no.2
    • /
    • pp.38-44
    • /
    • 2014
  • When a cable-stayed bridge is under construction, the cable tension that changes according to the construction phase is the index indicating the proper construction management. In this study, the vibration method using the least-square estimation has been implemented to monitor changing tensions of two multi-strand cables of a cable-stayed bridge under construction. The test bridge is Hwamyung Bridge in Korea with a prestressed concrete box girder. The field tests are executed during the second tensioning stage just after the installation of the key segment. The tensions of two cables are measured before and after the tensioning and 5 days later (i.e., after finishing the tensioning of all cables). The accuracy of the estimated tensions by the vibration method has been improved by employing proper effective lengths of the cables. The measured tensions are compared with the result of the lift-off tests and design tensions. The vibration method shows very good performance in monitoring the changing tensions according to the construction phase with minimal error.

Comparison of Aerodynamic Responses for Cable-Stayed Bridges during Construction with Temporary Stabilizing Measures (내풍케이블 배치에 따른 가설 중 사장교의 공기역학적 거동 비교)

  • Cho, Jae Young;Kim, Young Min;Lee, Hak Eun
    • Journal of Korean Society of Steel Construction
    • /
    • v.19 no.2
    • /
    • pp.147-160
    • /
    • 2007
  • In this paper, we described the aeroelastic full-bridge model tests that were conducted to investigate the effect of alternative temporary stabilizing measures for thecable-stayed bridge during construction to ensure aerodynamic stability in the event of a typhoon or similar disasters. The effect of alternative temporary stabilizing measures was investigated through various configurations on two cable-stayed bridges with a main span of 475 m and 230 m, respectively. To investigate the bridge's aerodynamic behaviour and dynamic wind force during construction, the deflections at the end of the cantilever, the accelerations atthe top of the pylon and the moments at the lower part of the pylon were measured. As the result, the system with two sets of vertical cables per cantilever seemed to be the overall most effective solution, but the system with single vertical cable may also work. The combined system using the caisson support and vertical cables and the system with two sets of inclined cables per cantilever on the same anchor block may also be a solution. The inclined cables from the caisson to the girder were effective for some early stages of erecting the deck.

Completing the Seohae Grand Bridge Construction Supervision (서해대교 감리를 마치며)

  • 전준수
    • Journal of the Korean Professional Engineers Association
    • /
    • v.34 no.1
    • /
    • pp.23-26
    • /
    • 2001
  • Seohae Grand Bridge is a part of the new West Coast Highway(353km) under construction, which connects Inchon and Mokpo. It is the longest bridge in Korea (7.31 km), and has 97 spans of 60m each precast segmental approach bridges, 2 main spans of 165m each free cantilever segmental bridge(500m), and 1 stay cable bridge of 990m In total length. During the seven year long construction period, many new construction technologies and methods were utilized for the first time in Korea, and gave invaluable opportunities to experience and master these in completing the project on time with safety and precision. I am proud of being a member of this project, and wish to express deep appreciations to those who participated in the project.

  • PDF

An Experimental Study on Allowable Size of Incomplete Penetration in Butt Joint Bridge Weld Considering Fatigue Strength (교량의 피로강도를 고려한 맞대기용접부 불안전용입 한계결함 결정에 관한 연구)

  • 백영남;장영권
    • Journal of Welding and Joining
    • /
    • v.18 no.3
    • /
    • pp.68-75
    • /
    • 2000
  • The incomplete penetration(IP) discontinuity in butt joint weld, which is detected during safety analysis of the steel bridge by nondestructive evaluation(NDE) method, is classified as unacceptable defect according to the NDE codes and standards. In fact, there are a little allowance in butt joint weld in the view point of design criterion, and also detected IP discontinuity should be classified and evaluated for the fatigue strength and residual life estimation. In this study, we performed fatigue test to evaluate the fatigue strength of high strength steel(SWS490A) containing IP discontinuities in various size, the results compared and classified according to the bridge construction standard specification which published by korea administration of construction and traffic. Experimental results could be used to evaluate and estimate the IP discontinuities considering different stress range in butt joint bridge weld during periodic safety inspection.