• Title/Summary/Keyword: Bridge Planning

Search Result 187, Processing Time 0.025 seconds

BIM and 4D planning: a holistic study of the barriers and drivers to widespread adoption

  • Kassem, Mohamad;Brogden, Trevor;Dawood, Nashwan
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.4
    • /
    • pp.1-10
    • /
    • 2012
  • Building Information Modeling (BIM) and its different work streams, such as 4D planning (4D), are among the major drivers for change in the construction industry. The primary aim of this research is to create a holistic map of both the barriers and drivers affecting the industrial uptake of BIM and 4D through the use of an extensive literature review and a survey of contractors and consultants from the UK AEC (Architectural, Engineering and Construction) industry. This research demonstrates that while non-technical barriers such as the inefficiency in the evaluation of the business value of BIM and 4D; the shortage of experience within the workforce, and the lack of awareness by stakeholders are recognized by professionals as main barriers to BIM and 4D adoption, current research is still largely concerned with technical advancement of BIM and 4D technologies. A holistic map of the driving and restraining forces affecting BIM and 4D widespread adoption was provided. The tackling of the non-technical barriers identified will help bridge the gap between technology, end-users and their processes.

BIM Application for Civil Engineering Project in Planning and Design Phases (토목공사 기획 및 설계단계의 BIM 적용방안 연구)

  • Kang, Leen-Seok;Kim, Seol-Gi;Kim, Hyeon-Seung;Moon, Hyoun-Seok
    • Journal of KIBIM
    • /
    • v.1 no.1
    • /
    • pp.26-31
    • /
    • 2011
  • Due to the characteristics of 3D objects of building construction projects which have regular, vertical and repetitive shapes, the most practical utilization of BIM in the country is focused on building projects. The characteristics of 3D objects of civil engineering project have irregular, horizontal and non-repetitive shapes. Therefore, consisting of a practical BIM model is difficult comparing with building project. This study suggests an application process of BIM for the planning and design phases for civil engineering project. A BIM system is developed based on suggested BIM process and it is verified through a bridge construction project.

Development of framework to estimate environmental loads of PSC beam bridges based on LCA

  • Lee, Wan Ryul;Kim, Kyong Ju;Yun, Won Gun;Kim, In Kyum
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.730-731
    • /
    • 2015
  • This study aims at giving the framework to estimate the environmental load at planning and schematic phase. With increasing awareness of environmental issues, the effort to reduce the environmental impacts caused by human activity has been increasingly enlarged. So far most of researches estimating CO2 emissions have analyzed energy consumption based on BOQ (Bills of Quantity) acquired after detailed design. There is also lack of reliability in the estimated environmental impact using the basic unit of a facility at the planning stage, because it uses a limited specific section of historical data. Thus, this study is targeted at developing framework to assess reliable environmental loads based on information available at project early phases by making case-bases from historical design information on PSC Beam Bridge. Historical database is built on the basis of the LCA (Life Cycle Assessment) and in order to set input information for estimating model, the literature about information in an early project phase are reviewed. Using the information available in the planning and schematic design stage, the Framework is presented to estimate the environmental load in an early stage in the project. Developing an environmental load estimation model in accordance with the Framework presented in this study, it is expected that the environmental load in the initial project phase can be estimated more quickly and accurately.

  • PDF

An Experimental Study of Seismic Retrofit on the Viaduct Bridge of Rail Transit (철도 고가교 기둥의 내진성능에 관한 실험적 연구)

  • Kim, Jinho;Shin, Hongyoung;Park, Yeonjun;Hur, Jinho
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.6
    • /
    • pp.616-622
    • /
    • 2012
  • Earthquake damage of viaduct bridge of railroad may give rise to social loss due to transport restrictions greater than cost of structural recovery. Therefore, viaduct bridge of railroad should have ensure adequate seismic performance. But, results of seismic performance evaluation, many of seismic retrofit was required. In this study, five scale models of columns were made and four of them were reinforced by HT-A(HyperTex & perforate Aluminum) which is improved than existing method. Testing the columns by constant axial load and cyclic lateral displacements, seismic performance of columns has been verified from the result of evaluating the stiffness, ductility and energy dissipation capacity.

A Concept of Multi-Layered Database for the Maintenance and Management of Bridges (교량의 유지관리를 위한 멀티레이어 데이터베이스 개념)

  • Kim, Bong-Geun;Yi, Jin-Hoon;Lee, Sang-Ho
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.20 no.3
    • /
    • pp.393-404
    • /
    • 2007
  • A concept of multi-layered database is proposed for the integrated operation of bridge information in this study. The multi-layered database is a logically integrated database composed of standardized information layers. The standardized information layers represent the data sets that can be unified, and they are defined by standardized information models. Classification system of bridge component was used as a basis of the multi-layered database, and code system based on the classification system was employed as a key integrator to manipulate the distributed data located on the different information layers. In addition, data level indicating priorities of information layers was defined to support strategic planning of the multi-layered database construction. As a proof of concept, a prototype of multi-layered database for object-oriented 3-D shape information and structural calculation document was built. Data consistency check of the semantically same data in the two different information layer was demonstrated, It is expected that the proposed concept can assure the integrity and consistency of information in the bridge information management.

Long term structural health monitoring for old deteriorated bridges: a copula-ARMA approach

  • Zhang, Yi;Kim, Chul-Woo;Zhang, Lian;Bai, Yongtao;Yang, Hao;Xu, Xiangyang;Zhang, Zhenhao
    • Smart Structures and Systems
    • /
    • v.25 no.3
    • /
    • pp.285-299
    • /
    • 2020
  • Long term structural health monitoring has gained wide attention among civil engineers in recent years due to the scale and severity of infrastructure deterioration. Establishing effective damage indicators and proposing enhanced monitoring methods are of great interests to the engineering practices. In the case of bridge health monitoring, long term structural vibration measurement has been acknowledged to be quite useful and utilized in the planning of maintenance works. Previous researches are majorly concentrated on linear time series models for the measurement, whereas nonlinear dependences among the measurement are not carefully considered. In this paper, a new bridge health monitoring method is proposed based on the use of long term vibration measurement. A combination of the fundamental ARMA model and copula theory is investigated for the first time in detecting bridge structural damages. The concept is applied to a real engineering practice in Japan. The efficiency and accuracy of the copula based damage indicator is analyzed and compared in different window sizes. The performance of the copula based indicator is discussed based on the damage detection rate between the intact structural condition and the damaged structural condition.

A Study on the Probabilistic Risk Analysis for Safety Management in Construction Projects

  • Lee, Dong-Yeol;Kim, Dong-Eun
    • Journal of the Korea Society of Computer and Information
    • /
    • v.26 no.8
    • /
    • pp.139-147
    • /
    • 2021
  • In this study, we proposed the possibility of reliability analysis of risk index by using Monte Carlo simulation as basic data of safety accident occurrence data and expert opinion by construction industry type. Through this, it is expected that risk index for safety accidents according to detailed types of works will be presented stochastically and it will be possible to predict the risk factors and the expected range of damage based on the reliability analysis in the construction safety management plan. It will also reduce many of the planning risks that are common to decision makers in the field of construction management. In identifying risks, road bridge construction was classified into earthworks, drainage works, and bridge construction, and possible safety accidents were classified based on expert data. The risk index was calculated for each detailed construction of road and bridge construction, drainage construction, and bridge construction.

IFC Property Set-based Approach for Generating Semantic Information of Steel Box Girder Bridge Components (IFC Property Set을 활용한 강박스교 구성요소의 의미정보 생성)

  • Lee, Sang-Ho;Park, Sang Il;Park, Kun-Young
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.2
    • /
    • pp.687-697
    • /
    • 2014
  • This study ranges from planning phase to the detailed design phase of steel box girder bridge and proposes ways to generate semantic information of components through Industry Foundation Classes (IFC), a data model for Building Information Modeling (BIM). The classification of components of steel box girder bridge was performed to define information items required for identifying semantic information based on IFC, and spatial information items based on topology and physical information items based on functions of components were classified to create additional properties that does not support IFC by applying user-defined property set within the IFC framework. Steel box girder bridge information model based on IFC was implemented through BIM software and semantic information input interface, which was developed in this study to examine the effectiveness of the additionally created user-defined property. Furthermore, the quantity take-off of components was performed through information model of steel box girder bridge, and the applicability of the proposed method was tested by comparing the quantity take-off based on design document with the result.

Merits and Demerits of the Inspection System introduced in Construction of City Planning Road: In Case of Crossing Road of the Aioiyama Green Area in Nagoya

  • Yutaka Okamura
    • Journal of the Korean Institute of Landscape Architecture International Edition
    • /
    • no.2
    • /
    • pp.178-184
    • /
    • 2004
  • The Yatomi - Aioiyama line is a city-planning road that was notified in 1957 and subsequently prepared by land readjustments. Currently, approximately 900m of road pass in the inside of the Aioiyama green area has not been constructed. The surveying briefing session for inhabitants was held in July 1992, the project was authorized by the Ministry of Land, Infrastructure and Transport in September 1993, and the project briefing session for inhabitants was held in September 1993. The site purchase has been completed. At the May 2000 briefing session, inhabitants of the area began voicing dissenting demanding the conservation of the natural environment of this green area. The inspector system serves as the third party, independent of both the administration and the inhabitants. Before finalizing the geometric line form of the road to be constructed, some surveys of animals and plants found along the walking trails carried out intensively in the northern area, which is approximately 50 ha, of the Aioiyama green area. The natural environment inspector submitted a plan for changing the geometric line form of the road decided upon by city planning, and it was approved by the city planning council. If the shelter structure or the retaining wall structure is adopted at the location where large slope faces are produced by excavation or landfill, and if the bridge structure is adopted at the place where stream-lines and walking trails intersect, it leads to a reduction of approximately $40\%$ in the areas for which change is planned. Furthermore, approximately $20\%$ of the area to be changed is restored by returning soil to the roof of the shelter.

  • PDF

Design for Gwangjang-dong Neighbourhood Park in Gwangjin-gu, Seoul (서울 광진구 광장동 기능 복합적 근린공원 설계)

  • Lee, Gwan-Gyu;Han, Seon-A
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.34 no.4 s.117
    • /
    • pp.61-68
    • /
    • 2006
  • A park will soon be developed in an area of Gwangjang-dong, Gwangjin-gu. The place has been a patch of green space for years, isolated by driveways and apartment complexes and abandoned. This article describes plans to infuse the abandoned green space with history, ecology, culture, and sports. The facilities that are to be constructed in and around the green space are positioned to take into account the path of the sun and the location of the curvilinear green space axis. The cultural space is planned as a centerpiece of the park, linked with the sports facilities. The overall framework is arranged in harmony with nearby elementary schools, parks, public facilities, athletic facilities, parking lots, and apartment complexes. The themed circulation route was constructed according to the environmental conditions and the spatial plan. In addition, the historical space is planned to work in close conjunction with the cultural space, and the streets and pedestrian pathways have characters of their own. The established contour lines will be carefully preserved, and an ecological pond will. The facilities, such as the outdoor performance stage, the outdoor art gallery, the Monument of Wind represented by a sail, and the pedestrian bridge in memory of Acha-sansung, are positioned for spatial balance and to provide a nexus. The bamboo forest, designed to foster the experience of sound effects, the architectural thematic plants, and the ecological pond are positioned to connect to each other around the greenspace axis. The main facilities are the outdoor theater, the bamboo forest, the Acha-sansung bridge, the Monument of Wind, the ecological pond, the four-season flower garden, parking lots, playgrounds, circulatory athletic pathways, and the tennis court.