• Title/Summary/Keyword: Bridge Planning

Search Result 187, Processing Time 0.02 seconds

BrDSS: A decision support system for bridge maintenance planning employing bridge information modeling

  • Nili, Mohammad Hosein;Zahraie, Banafsheh;Taghaddos, Hosein
    • Smart Structures and Systems
    • /
    • v.26 no.4
    • /
    • pp.533-544
    • /
    • 2020
  • Effective bridge maintenance reduces bridge operation costs and extends its service life. The possibility of storing bridge life-cycle data in a 3D parametric model of the bridge through Bridge Information Modeling (BrIM) provides new opportunities to enhance current practices of bridge maintenance management. This study develops a Decision Support System (DSS), namely BrDSS, which employs BrIM and an efficient optimization model for bridge maintenance planning. The BrIM model in BrDSS extracts basic data of elements required for the optimization process and visualizes the inspection data and the optimization results to the user to help in decision makings. In the optimization module of the DSS, the specifically formulated Genetic Algorithm (GA) eliminates the chances of producing infeasible solutions for faster convergence. The practicality of the presented DSS was explored by utilizing the DSS in the maintenance planning of a bridge under operation in the southwest of Iran.

Analysis on Visual Preference of Bridge Landscapes of View Point Selection and Bridge Shape for Improvement of the Rural Landscape - A Case Study of the 'Baegya Bridge of Yeosu City in Jeollanam-do' (농어촌경관 향상을 위한 교량경관의 조망점 및 형태에 관한 경관선호도 분석 -전라남도 여수시 백야대교를 대상으로-)

  • Chun, Hyun-Jin;Lee, June;Jiang, Long;Kim, Sung-Kyun
    • Journal of Korean Society of Rural Planning
    • /
    • v.18 no.3
    • /
    • pp.57-65
    • /
    • 2012
  • This research is focus on the analysis of bridge image and preference. In this study, 3 types of bridge with arch bridge, cable stayed bridge, and suspension bridge, 4 prospect points named A, B, C, and D will be simulated in one scene for final analysis of bridge image and preference.On prospect point A, higher evaluation is received among the arch bridge. In addition, for cable stayed bridge and suspension bridge, the Higher evaluation is received among the most at the arch bridge on prospect point B. At the on prospect point C, higher evaluation is received among the most cable stayed bridge and suspension bridge compared with arch bridge. At the on prospect point D, lower evaluation is received among the cable stayed bridge and suspension bridge compared with arch bridge. The highest average total preference is received for cable stayed bridge. And, The lowest average total preference is received for arch bridge. Cable stayed bridge is suitable for the Baegya Bridge than arch bridge in the Landscape point. In conclusion, the preference for one bridge is not the same at different prospect points through above research.

Analysis on Visual Preference of Bridge Landscapes of Background and Shape in Rural Area - Focused on the Natural Landscape in Rural Area - (농촌지역의 교량의 배경경관 및 교량형태에 따른 시각적 선호도 분석 - 농촌지역 자연경관을 중심으로 -)

  • Chun, Hyun-jin;Jiang, Long;Cheng, Yu-ning
    • Journal of Korean Society of Rural Planning
    • /
    • v.22 no.2
    • /
    • pp.89-98
    • /
    • 2016
  • Due to the rapid economic development of Korea, the bridge have been built by government over the several years. Additionally, there are too many mountain and river and the bridge have been built in rural area. But bridge designers weren't considering the bridge landscape. And bridge was a negative factor in regional landscape. Because of this, this study surveyed the landscape preferences of rural bridge landscapes according to different bridge types. The results were summarized as follows: And this research include conducting a study on visual preference according to the bridge's type and background. And, the landscape of arch bridge in the river 1 is landscape of the highest preference. The the landscape of girder bridge in the river 2 is landscape of the lowest preference. In the river 1 and 2 landscape, high preference is observed in the arch bridge and low preference is noted in the girder bridge. In the mountain 1 and 2 landscape, high preference is observed in the cable-stayed bridge and low preference is noted in the girder bridge. In conclusion, the visual preference of bridge landscape depend on the background and bridge shape, the study said. Therefore, when bridge designer design the bridge, designer have to choose proper bridge shape according to the background. This research was conducted only in bridge landscape of rural area but the visual preference of bridge landscape can be changed according to the various background. And further research is needed to analyze visual preference of bridge landscape according to the various background.

Case Study : BIM for Planning, Simulating, and Implementing Complex Site Logistics

  • Kim, JongHoon;Cohen, Fernando Castillo
    • Journal of KIBIM
    • /
    • v.5 no.4
    • /
    • pp.47-52
    • /
    • 2015
  • This paper presents a case study using Building Information Modeling (BIM) for planning, simulating, and implementing complex site logistics in a headquarter office building construction project in Silver Spring, MD. As part of the project a prefabricated 92ft structural tube steel pedestrian connector bridge was installed between two adjacent buildings in the city of Silver Spring, MD. There were multiple significant challenges to deliver, offload, prepare, and install the connector bridge safely, on time, and with the minimum disturbances to the neighbors. BIM was of the foremost importance to visualize, simulate, analyze, improve, and communicate the site logistics plan from delivery to installation of the connector bridge. As a result of the effort, GC of the project was able to prepare a highly detailed plan, communicate it effectively to all stakeholders, and flawlessly execute the work as planned. This case study would provide a useful reference for contractors who are seeking a better planning method that enables generation of more accurate, implementable, optimized plans for complex site logistics.

Maintenance Planning for Deteriorating Bridge using Preference-based Optimization Method (선호도기반 최적화방법을 이용한 교량의 유지보수계획)

  • Lee, Sun-Young;Koh, Hyun-Moo;Park, Wonsuk;Kim, Hyun-Joong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.2A
    • /
    • pp.223-231
    • /
    • 2008
  • This research presents a new maintenance planning method for deteriorating bridges considering simultaneously the minimization of the maintenance cost and maximization of the bridge performance. Optimal maintenance planning is formulated as a multi-objective optimization problem that treats the maintenance cost as well as the bridge performance such as the condition grade of the bridge deck, girder and pier. To effectively address the multi-objective optimization problem and decision making process for the obtained solution set, we apply a genetic algorithm as a numerical searching technique and adopt a preference-based optimization method. A numerical example for a typical 5-span prestressed concrete girder bridge shows that the maintenance cost and the performance of the bridge can be balanced reasonably without severe trade-offs between each objectives.

Estimation Model for Approximate Construction Quantities of Suspension Bridge in Early Stage (사업기획단계에서의 현수교의 물량추정을 위한 모델연구)

  • Park, Weon-Tae;Chun, Kyoung-Sik
    • Journal of the Korean Society for Advanced Composite Structures
    • /
    • v.6 no.4
    • /
    • pp.24-29
    • /
    • 2015
  • Bridge construction cost estimates have generally been conducted by using historial unit-price(per meter or square meter). The traditional estimating method based on unit-price references can never completely reflect the specialty of cable supported bridge. In this paper, we have developed the system for supporting the approximate construction cost and the quantity estimation based on 3D model information in the pre-project planning phase of 3-span continuous suspension bridge with 2-pylons. First of all, we'd analyzed the design information (such as structural design report, blueprint and quantity) and the real cost data from the existing suspension bridges and derived the design variables of the bridges. We developed the BIM wizard that generates a suspension bridge model parametrically based on derived design variables. The principle material quantities of suspension bridge are calculated directly from 3-dimensional bridge model built by using the BIM wizard. We have established the system that the construction cost can be estimated more specific than the traditional estimating method.

Preliminary Structural Form Planning for Suspension Bridge According to Force Flow (힘의 흐름을 따르는 현수교의 초기 구조형태계획)

  • Kim, Namhee;Koh, Hyun-Moo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.4
    • /
    • pp.1315-1326
    • /
    • 2013
  • Geometric form of a suspension bridge that uses load-sensitive cables takes on not only resisting loads but also becoming a visually sensible shillouette. This study has proposed a preliminary structural form planning for a suspension bridge following force flow by adopting the two possibilities of the graphic statics. First, the force polygon allows alternative load paths for the same loading condition. Second, a new structural form for the newly developed load path can be constructed using the reciprocal principle that exits between a structure space and the corresponding force polygon. Major structural form parameters that affect both structural and aesthetic aspecs are first identified. The relationships between structural forms and the corresponding force polygons are then investigated for the identified parameters. Upon the investigation, a stepwise process is developed for a preliminary structural form planning for a suspension bridge. The proposed structural form planning method is general that can be easily expanded to generate design alternatives of similar form-active structural systems. It is also expected that this method will be used as an educational tool to explain the interrelationships between structural forms and their force flows.

Assessment of Visual Characteristics on Bridge Landscapes in the Seashore (해안에 위치하는 교량경관의 시각적 특성평가)

  • Chun, Hyun-jin;Jiang, Long;Cheng, Yu-ning
    • Journal of Korean Society of Rural Planning
    • /
    • v.22 no.3
    • /
    • pp.63-70
    • /
    • 2016
  • Due to the Korea's topographic characteristic, there are a lot of marine bridges to connect between islands and mainland. In addition, marine bridges play an important role in a regional landscape. For these reasons, landscape design of bridge is necessary in order to improve beautification of region. So, this studies analyzed image and landscape preference of marine bridges in rural area. The main results were summarized as follows: When rating the image of the background in sea and mountain image, 'stable' and 'natural' were rated highly. When rating the image of the arch bridge in sea and mountain image, 'beautiful', and 'attractive' were rated highly. When rating the image of the cable-stayed bridge in sea and mountain image, 'splendid', and 'attractive' were rated highly. When rating the image of the suspension bridge in sea and mountain image, 'beautiful', and 'splendid' were rated highly. Next, When rating the image of the background in sea and building image, 'stable' and 'natural' were rated highly. When rating the image of the arch bridge in sea and building image, 'beautiful', and 'splendid' were rated highly. When rating the image of the cable-stayed bridge in sea and building image, 'beautiful', and 'attractive' were rated highly. When rating the image of the suspension bridge in sea and building image, 'beautiful', and 'attractive' were rated highly. And, The image of suspension bridges in sea and mountain image is more highly preferred than other image. The background in sea and mountain image is landscape of the lowest preference. In the mountain and sea image, the preference of suspension bridge landscape has the highest rating. In the sea and building image, the preference of arch bridge landscape has the highest rating. In conclusion, the results illustrate that the marine bridge's shape and its background in rural area are important elements of a visual preference. When designing the marine bridge, designer have to choose a proper bridge shape for its background. However, this research's limitation is that this research consider only bridge shape and background to analyze landscape preference of marine bridges. Therefore, further research is necessary to consider various elements.

Development of Bridge Maintenance System (교량관리 전산화 시스템 개발)

  • 이장화;장종탁;김성욱;장인호;이성준
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1990.10a
    • /
    • pp.105-110
    • /
    • 1990
  • Effective maintenance system for national highway bridges has been requested due to increasing numbers of bridges. In this study, bridge data base is established in accordance with rating criteria for the structural conditions and functions of bridges. Maintenance system using PC-80386 hardware and ORACLE software is developed to rank the priority of either reconstruction or repairing of bridges and to provide with those information to bridge maintenance staff in order to perform bridge maintenance effectively. With this pre-establised data base and computerized maintenance system, data and information for planning of bridge construction could be obtained in times.

  • PDF

Master plan of Seomoon Bridge Area (서문교 활용방안 기본계획)

  • 임영균;유헌준;박종덕;장태현;홍형순
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.29 no.3
    • /
    • pp.55-60
    • /
    • 2001
  • The Seomoon Bridge, a new planning site, is located in Sangdang-Gu Seomoon-Dong, Chongju and is the oldest bridge built during the rule of Japanese imperialism. As the name implies, Seomoon Bridge is located on the site adjacent to west gate. The Seomoon Bridge is an important bridge as an historical trace of the vanished town of Chongu. However, as new roads and bridges are built, the Seomoon Bridge is losing its functional aspects and has become an area crowed by many street stalls. Closely located newer to Sajic Fountain, the Seomoon Bridge, which has symbolically significant meaning, now faces many problems such as non-practical use of bridge, indifferent management and non-locality, which creates a negative effect on the surrounding cityscape. given this situation, in 2001, 2, Chongju city published an appeal for public subscription of a practical use plan which may design a new, landmark and establish resting spaces for the public. The basic direction of this planning is designed to be place as the symbolic space representing Chongju, and integrated with the surrounding environmental elements such as Moosim-Cheon(stream) and Sajic Fountain, and as a recreational, resting and leisure space of the public. Especially nightscape of the bridge inspires a fresh impact on many people. Because of the widespread influence of developed cities, diverse spaces which already exist or have disappeared may be reclaimed. By establishing appropriate use plans rather than negligence, this project will propose the improved quality of cityscape and show the possibility of bublic´s outdoor living space, and our team will find out the meaning in these approach methods.

  • PDF