Stability of A Surcharged Tunnel under the Effect of Pre-Loading on the Adjacent Braced Wall (근접한 흙막이벽체에 가하는 선행하중의 영향을 받는 상재하중 재하 터널의 안정)

  • Kim, IL;Lee, Sang Duk
    • Journal of the Society of Disaster Information
    • /
    • v.4 no.2
    • /
    • pp.10-27
    • /
    • 2008
  • When the ground is excavated adjacent to the existing tunnel, which is loaded by the surcharge on the ground surface, the tunnel stability would be very sensitive to the deformation of the ground induced by the horizontal displacement of braced wall. The stability of the existing surcharged tunnel could be controlled by pre-loading on the braced wall. In this paper, it was investigated, if it would be possible to keep the existing surcharged tunnel stable by preventing the horizontal displacement of a braced wall by imposing the pre-loading during the ground excavation. For this purpose, large scale model tests were performed in a scale 1/10 at the test pit which was 2.0m in width and 6.0m in height and 4.0m in length. Isotropic test ground was constructed homogeneously by wet sand. Model tunnel was constructed in the test ground. Surcharge was loaded on the ground surface above the tunnel. During the tests, the behavior of model tunnel and model braced wall was measured. Numerical analyses were also performed in the same condition as the tests. And their results were compared to that of the model tests. Consequently, the effect of a surcharge could be compensated by imposing the pre-loading on the braced wall. The existing tunnel and the braced wall could be kept stable by preventing the horizontal displacement of the braced wall through pre-loading, although the tunnel is surcharged.

  • PDF

Behavior of braced wall due to distance between tunnel and wall in excavation of braced wall nearby tunnel (터널에 인접한 흙막이굴착 시 터널 이격거리에 따른 거동특성)

  • Ahn, Sung Joo;Lee, Sang Duk
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.4
    • /
    • pp.657-669
    • /
    • 2018
  • In recent years, the development of complex urban areas has become saturated and much attention has been focused on the development of underground space, and deep excavation is frequently performed in order to increase the utilization of underground space due to the enlargement of buildings and the high rise of buildings. Therefore, in this study, we tried to understand the behavior of the braced wall and the behavior of the tunnel adjacent to the wall according to the stiffness of the wall and the distance between the tunnel and wall. As a result of the study, the deformation of the braced wall tended to decrease with increasing the stiffness of the wall, and the axial force acting on the struts was also different according to the stiffness of braced wall. When the stiffness of the braced wall is small (2 mm), the point at which the axial force of the braces maximizes is near 0.3H of the wall. When the stiffness of the braced wall is large (5 mm), the axial force is maximum at around 0.7H of the wall. Also, the tunnel convergence occurred more clearly when the separation distance from the braced wall was closer, the stiffness of the wall was smaller, and the tunnel convergence was concentrated to the lower right part. The ground settlement due to the excavation of the ground tended to decrease as the distance between tunnel and braced wall was closer to that of the tunnel, which is considered to be influenced by the stiffness of the tunnel.

A Field Case on the Pilot Constructions and Changes of a Braced Cut Wall in a Coastal Filled Land (해안매립지반에서의 토류가시설 시험시공 및 변경사례)

  • Hwang, Young-Chul;Kim, Ki-Rim;Kim, Yeon-Jung
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.10a
    • /
    • pp.46-55
    • /
    • 2006
  • There are many kinds of braced cut wall methods as the sheet pile, SCW, CIP and slurry wall which is adoptable for a deep excavation construction in a coastal filled land. The braced cut wall which has a strong stiffness is very stable but it has the weak point that the construction cost is high. Thus when a braced cut wall is designed, the geotechnical engineers choose the braced cut wall which has more safe and economic in the consideration of surrounding buildings near the construction site. Especially, when the sheet pile method as a braced cut wall is cheesed, the layer order and consistence of a coastal deposit stratum are considered and the pile driving method is also considered. This paper introduces the case that the originally box-type sheet pile wall was changed to U-type and high strength material after the pilot test at the subway construction site in a coastal filled land. This paper also introduces the case that the sheet pile's driving method was changed to special method in the section of the temporary coffer dam which had made when the present coastal filled land was formed.

  • PDF

Correlation between Strut Preloading and Earth Retaining Structures in Braced Excavations (버팀굴착시 버팀대 선행하중과 흙막이 구조물과의 상호 관계)

  • 오성남;조현태;박기태;양구승
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.03a
    • /
    • pp.129-136
    • /
    • 1999
  • The use of strut preloading method is gradually increasing in braced excavations in Korea. And it is necessary to analyse the effects of strut preloading on the wall deflection, bending moment and strut axial force etc. In this study, by using the analysis method of beams on elasto-plastic foundations, parametric studies of correlation between preloading and earth retaining structures in sandy soils were peformed in strut preloading application. As results, about 50% of design strut load was effective as a preloading force in considering the displacement and member forces of structures. And at least the effective stiffness of strut should be over 25% of the ideal value in order to restrain the excessive increase of wall deflection and bending moments. In order to protect excessive movements in braced excavation, to preload the strut was rather effective way than to increase the stiffness of strut and braced wall, but the excessive axial force of strut should be checked simultaneously.

  • PDF

Behavior of Building Lower Part Passage Tunnel due to Adjacent Ground Excavation (근접굴착에 따른 건물 하부 통과 터널의 거동)

  • Lee, Jong-Min;Lee, Sang-Duk
    • Tunnel and Underground Space
    • /
    • v.20 no.5
    • /
    • pp.369-377
    • /
    • 2010
  • Applied to the braced wall in order to stabilize the adjacent tunnel. A pre-load of bracing was imposed to prevent the horizontal displacement of the braced wall during the ground excavation. For this purpose, real scale model tests were conducted, without and with pre-load on braced wall. Real scale model tests were conducted, without and with building load (0 m, 1D, 2D) on ground surface. As a result, it was found that the stability of the existing tunnel adjacent to the braced wall could be greatly enhanced when the horizontal displacement of the braced wall was reduced by applying a pre-load, which was larger than the designated axial force of bracing. In this paper, the behaviors of braced wall and adjacent tunnel was studied. Model tests in 1:10 scale were performed in real construction sequences. Adjacent tunnel was 12 m in diameter and the size of test pit was 2.0 m (width) ${\times}$ 6.0 m (height) ${\times}$ 4.0 m (length) in dimension.

Behavior of Tunnel Due to Adjacent Ground Excavation with Pre-loading on Braced Wall (근접 굴착시 흙막이벽 버팀대 선행하중 재하에 따른 터널의 거동)

  • Kim, Il;Lee, Sang-Duk
    • Journal of the Korean Geotechnical Society
    • /
    • v.23 no.10
    • /
    • pp.163-174
    • /
    • 2007
  • A New pre-loading system, through which a large pre-load could be charged was developed and applied to the braced wall in order to stabilize the adjacent tunnel. A pre-load larger than the designated axial force of bracing was imposed to prevent the horizontal displacement of the braced wall during the ground excavation. For this purpose, real scale model tests (1/10) were conducted, without and with pre-load on braced wall. And numerical analyses were performed for both the cases without and with pre-load, which were half (50%) and full (100%) respectively, and larger scale of the design axial farce of bracing. FEM program called PLAXIS was used for numerical analysis. As a result, it was found that the stability of the existing tunnel adjacent to the braced wall could be greatly enhanced when the horizontal displacement of braced wall was reduced by applying a pre-load, which was larger than the designated axial force of bracing.

Correlation between Strut Preloading and Earth Retaining Structures in Deep Excavations (깊은 굴착시 버팀대 선행하중과 흙막이 구조물과의 상호 관계)

  • 양구승;오성남
    • Journal of the Korean Geotechnical Society
    • /
    • v.16 no.2
    • /
    • pp.23-30
    • /
    • 2000
  • The use of strut-preloading method is gradually increasing in braced excavations in Korea. And it is necessary to analyze the effects of strut preloading on the wall deflection, wall bending moment and strut axial force, etc. In this study, by using the analysis method of beams on elasto-plastic foundations, measured data and calculated results of 2 sites are compared and parametric studies of correlation between preloading and earth retaining structures in sandy soils are carried out in strut preloading application. As results, about 50%~75% of design strut load is effective as preloading force in considering the displacement and member forces of earth retaining structures. And the effective stiffiness of strut should be at least 25% of th ideal value in order to restrain the excessive increase of wall deflection and bending moments. As one of some methods to prevent excessive movements in braced excavation, to preload the strut is confirmed as more effective way than to increase the stiffiness of strut in braced wall, if the excessive axial force of strut due to preloading can be avoided.

  • PDF

Behavior factors for mixed reinforced concrete wall and buckling restrained braced frame

  • Hamid Beiraghi;Behdad Abbaspour
    • Structural Engineering and Mechanics
    • /
    • v.86 no.2
    • /
    • pp.277-290
    • /
    • 2023
  • A supplementary reinforced concrete wall can be used to improve the seismic behavior of a buckling restrained braced frame as a mixed system. In such a novel system, the total lateral force is resisted by the combination of the RC wall system and the BRBF. There is not enough research on the response modification factor of such a mixed system. This paper investigates the response modification factor, and such relevant factors as ductility reduction factor and over strength factor for a system consisting of reinforced concrete wall and buckling restrained braced frame. To this purpose, nonlinear incremental dynamic analysis as well as static push over analysis are used for 6- to 14-story sample structures. The results show that for mixed considered systems, the mean value of response modification factor varies approximately from 7 to 9.

Behavior of tunnel under the influence of pre-loading on braced wall during the adjacent ground excavation (근접굴착 시 벽체에 선행하중 재하에 따른 터널의 거동)

  • Kim, Il;Lee, Sang-Duk
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.9 no.4
    • /
    • pp.331-341
    • /
    • 2007
  • Pre-loads could be imposed on the braced wall to prevent the horizontal displacements during the ground excavation adjacent to the existing tunnel. For this purpose, new pre-loading system through which large pre-loads could be applied to the braced wall was used in the model tests. Large scale model tests were performed in the real scale test pit which was 2.0 m in width and 6.0 m in hight and 4.0 m in length. Test ground was constructed by sand. Model tunnel in 1.2 m diameter was constructed before test ground excavation. Test ground was excavated adjacent to existing tunnel and was braced. To investigate the effect of pre-loading, tests without pre-load were also performed. During the ground excavation were the behavior of braced wall, test tunnel, and ground measured. Model tests were also numerically analysed and their results were compared to that of the real scale tests. As a result, it was found that the stability of the existing tunnel was greatly enhanced when the horizontal displacements of braced wall was reduced by applying pre-load larger than the design load.

  • PDF

Effects of Strut Preloading on the Restraining of Adjacent Ground Displacement at Braced Excavations (버팀 굴착시 버팀대 선행하중의 인접지반 변위 억제 효과)

  • 백규호;조현태
    • Journal of the Korean Geotechnical Society
    • /
    • v.15 no.1
    • /
    • pp.31-40
    • /
    • 1999
  • The bracing system using screw jack is not effective for the restraining of adjacent ground displacement. since the screw jack dose not induce sufficient preloading on struts. In order to protect excessive displacement of adjacent ground at braced excavation, new preloading jack was developed in the country. In this paper, the new preloading jack and the measurement results of the lateral displacement of braced wall at three deep excavation sites in Seoul city are introduced. The measurement results showed that the maximum displacements of braced wall are smaller than 0.15% of excavation depth, therefore the wall displacements can be minimized by preloading which is acted on bracing. If the bracing system with new preloading jack is used in braced excavation, it is effective for reducing the cost and period of construction.