A geophysical conductivity logging technique has been adopted to determine hydraulic constants using a simplified physical model that depicts the borehole condition. An experiment has been made by monitoring the conductivity change within the model hole using borehole environment water and incoming-outgoing water of different salinity, under the state of constant flow rate by maintaining balance between inflow and outflow. Conductivity variation features were observed that depended on flow rate, salinity contrasts between fluid within the hole and incoming-outgoing fluid, and density contrasts between fluid conductivity within the hole and incoming fluid. The results of the experiment show the uniform change of fluid conductivity within the hole with time, a fairly good correlation between the flow rate and the conductivity change rate. The geophysical conductivity logging technique can be an efficient tool for determining hydraulic constants if the model equation is verified by henceforward experiments.
Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
/
v.16
no.4
/
pp.479-490
/
2018
The granite melting concept, which was suggested by Gibb's group for the closing of a deep borehole, was experimentally checked for KURT granite. The granite melting experiments were performed in two pressure conditions of atmospheric melting with certain inorganic additives and high pressure melting formed by water vaporization. The results of atmospheric tests showed that KURT granite started to melt at a lower temperature of $1,000^{\circ}C$ with NaOH addition and that needle shaped crystals were formed around partially melted crystals. In high pressure tests, vapor pressure was increased by adding water with maximum pressure of about 400 bars. KURT granite was partially melted at $1,000^{\circ}C$ when vapor pressure was low. However, it was not melted at vapor pressures higher than 200 bars. Therefore, it was determined that high pressure with a small amount of water vapor more effectively decreased the melting point of granite. Meanwhile, high temperature and high pressure vapor caused severe corrosion of the reactor wall.
Monte Carlo N-Particle (MCNP) modeling algorithm based on the Monte Carlo method was used to perform the simulation of neutron logging in order to increase the reliability and utilization of neutron logs applied in geological and resource engineering fields. To perform the simulation using MCNP, we used a realistic three-dimensional configuration of neutron sonde and formation. Validation of the modeling was confirmed by comparing the calibration curves of sonde manufacture with those calculated by MCNP modeling. After the validation, lithology effects, pore fluid effects, borehole diameter change, casing effect, and effects of borehole water level were investigated through modeling experiments. Numerical tests indicate that changes in neutron count ratio according to the lithology were quantitatively understood. In case of a borehole with a diameter of 3 inches, ratio of counting rates was higher than expected to be interpreted as borehole fluid has small effects on neutron logging. Effect of casing was also small in general, particular when porosity increases. Since modeling results above the groundwater level showed a tendency opposite to those below the groundwater level, neutron logs can be used to detect groundwater level. The modeling results simulated in this study for various borehole environments are expected to be used for data processing and interpretation of neutron log.
Kim, Jungyul;Kim, Yoosung;Yun, Jeumdong;Kwon, Sungil;Kwon, Hyongil;Park, Seongbin;Park, Juhyun
Geophysics and Geophysical Exploration
/
v.20
no.1
/
pp.1-11
/
2017
In order to improve the accuracy of microseismic epicenter location through the inversion techniques using P and S wave first arrivals, field experiments of microseismic monitoring were performed using borehole 3-component geophones. The direction of epicenter was estimated from the hodograms of P-wave first arrivals through the weight drop experiments in which the $\times$ component of 3-component geophone was aligned to the magnetic north. The picking of S wave first arrival was possible in the polarization filtered data even if S waves are difficult to be identified in raw data. The inversion technique using only P wave first arrival times can often converge to the local minimum when the initial values for epicenter are largely apart from the true epicenter, so that the correct solution can not be found. To solve this problem, the epicenter determination method using differences between P and S wave arrival times was used to estimate proper initial values of epicenter. The inversion result using only P-wave first arrival times which started from the estimated initial values showed the improved accuracy of the epicenter location.
High-frequency electromagnetic (EM) wave propagation associated with borehole ground-penetrating radar (GPR) is a complicated phenomenon. To improve the understanding of the governing physical processes, we employ a finite-difference time-domain solution of Maxwell's equations in cylindrical coordinates. This approach allows us to model the full EM wavefield associated with crosshole GPR surveys. Furthermore, the use of cylindrical coordinates is computationally efficient, correctly emulates the three-dimensional geometrical spreading characteristics of the wavefield, and is an effective way to discretise explicitly small-diameter boreholes. Numerical experiments show that the existence of a water-filled borehole can give rise to a strong waveguide effect which affects the transmitted waveform, and that excitation of this waveguide effect depends on the diameter of the borehole and the length of the antenna.
Proceedings of the Korean Geotechical Society Conference
/
2004.03b
/
pp.491-498
/
2004
In recent years, as an effort to grasp the leading position in the field of maritime trading, new ports and container terminals arc now under construction. Old ports are extended. At the beginning, stones were thrown down to form stone embankments, that is stone-dams, in the outer and inner boundaries of the planned reclamation-land. S.C.P(Sand Compaction Pile) works are often needed to improve the stability of stone-dams, where marine sediments arc relatively thick. Here, interests are centered on the shape of stone body. In this, drilling work won't provide a sufficient resolution. In addition, the result corresponds to only one borehole point information. Thus, the aim of this paper is to introduce an affordable technology, that is, a combined geophysical method(seismic tomography + Televiewer) enables to get the whole information about stone-dam section. The measuring and evaluating procedure is described in detail with an emphasis on dealing with the use of seismic detonator, proper borehole deployment and integrated data analysis. Examples of field experiments at Busan new port are illustrated, which will prove the benefit of combined geophysical method.
The evolution of the mining-induced fracture network formed during longwall top coal caving (LTCC) has a great influence on the gas drainage, roof control, top coal recovery ratio and engineering safety of aquifers. To reveal the evolution of the mining-induced stress and fracture network formed during LTCC, the fracture network in front of the working face was observed by borehole video experiments. A discrete element model was established by the universal discrete element code (UDEC) to explore the local stress distribution. The regression relationship between the fractal dimension of the fracture network and mining stress was established. The results revealed the following: (1) The mining disturbance had the most severe impact on the borehole depth range between approximately 10 m and 25 m. (2) The distribution of fractures was related to the lithology and its integrity. The coal seam was mainly microfractures, which formed a complex fracture network. The hard rock stratum was mainly included longitudinal cracks and separated fissures. (3) Through a numerical simulation, the stress distribution in front of the mining face and the development of the fracturing of the overlying rock were obtained. There was a quadratic relationship between the fractal dimension of the fractures and the mining stress. The results obtained herein will provide a reference for engineering projects under similar geological conditions.
This paper presents the numerical investigation for the hydraulic behavior of a fractured rock mass with a hydromechanical interaction which may be considered during the in-situ hydraulic injection test. These experiments consist in a series of flow meter injection tests for fractures existing along an open hole section installed in a borehole, and experimental results are applied for testing a numerical model developed to the analysis and prediction of such hydromechanical interactions. Field experimental results show that conductive fractures form a dynamic and interdependent network, that individual fractures cannot be adequately modeled as independent systems, that new fluid intaking zones generate when pore pressure exceeds the minimum principal stress magnitude in that borehole, and that pore pressures much larger than this minimum stress can be further supported by the circulated fractures. In this study, these characteristics are investigated numerically how to influence the morphology of the natural fracture network in a rock mass by using a discrete fracture ntework model.
Park, Mi-Hee;Chang, Chan-Dong;Jo, Yeong-Uk;Choo, Min-Kyoung;Yum, Byoung-Woo
The Journal of Engineering Geology
/
v.21
no.2
/
pp.147-156
/
2011
We conducted laboratory experiments to determine the physical and mechanical properties, and the failure behaviors, of cements for use as grouting material in a $CO_2$-injection borehole. Samples with lour different ratios of water to cement mass (0.4, 1, 2, and 3) were tested. The analyzed properties (porosity, sonic velocity, modulus, and compressive and tensile strengths) varied systematically as a function of the ratio of water to cement (w/c), showing a sharp change between w/c ratios of 0.4 and 1. Triaxial compression tests revealed a clear boundary between brittle and ductile failure depending on the w/c ratio and confining pressure. The present results can be utilized as input parameters for numerical models to understand the initial deformation and failure behavior of grouting cements in a $CO_2$-injection borehole.
The Ground anchor is reinforcement to resist pull-out through ground that is used supports structure. The pull-out resistance of anchor is constructed by skin friction resistance from compression borehole wall in expanded wings and bearing pressure from the ground. Especially, underreamed ground anchor is reinforcement that adopts active reinforcement to prevent deformation of ground using bearing resistance generated reaming anchorage. This study is conducted to calculate bearing resistance of underreamed ground anchor. Realistic model tests were fulfilled to determine bearing resistance of anchor, and correlate results of tests to Uniaxial Compressive Strengths (UCS) of ground models that assumed weathered rock condition in 8 case. In a comprehensive series of the tests, the bearing resistances were measured by pull-out tests. The bearing resistances derived from tests have a linear correlation with UCS. We also suggest empirical equation between bearing resistance and UCS of rocks by single linear regression analyses. In test results of this study, the bearing resistances were evaluated approximately 13 times higher than UCS of the grounds, and it is qualitatively similar to numerical values of pull-out force derived from theory.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.