A Case Study on Improvement for Optimal Organization of Work Items in Construction Bill of Quantities (건축공사 내역서 세부항목 구성에 대한 사례연구)

  • Noh, Hae-Ra;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.10a
    • /
    • pp.67-68
    • /
    • 2016
  • In construction management, BoQ(Bill of Quantities) has been commonly used for the cost estimation. However, many problems have been recognized about the work items used in the BoQ that could be varied by the experience and knowledge of the estimators or the project. Also, there are lots of work items that have to be written in BoQ even though the cost proportion of those items is relatively lower than the others. In this study we consider the way how to organize optimally the work items through the analysis of case. The results of this study could be useful for improving the efficiency of preparing construction BoQ and conducting Quantity take-off in our construction management practices.

  • PDF

Improvement of Bill of Quantities of Door and Window Work for BIM-based Cost Estimation (BIM 기반 견적을 위한 창호공사 내역 작성체계 개선 방안)

  • Kim, Mi-Hyeon;Jo, Chan-Won;Yun, Seok-Heon
    • Journal of KIBIM
    • /
    • v.10 no.2
    • /
    • pp.12-20
    • /
    • 2020
  • Recently, interest in BIM technology has been growing in the domestic construction market as the number of construction projects requiring the application of BIM technology has increased. The use of BIM allows the use of various visualization functions through 3D models as well as drawing interference review, quantity calculation and integrated management of information. In particular, estimates of construction costs based on BIM can increase work efficiency by reducing the burden of calculating construction costs and managing them. In order to increase the efficiency of BIM-based cost estimates, it is necessary to improve the correlation between the BoQ(Bill of Quantity) information and the BIM model. For this purpose, the ratio of the amount and item to the detailed construction of the current BoQ was analyzed, especially the problem of the calculation of construction cost in the window work in this study. In addition, we would like to suggest a method for systematically linking the BoQ information with the BIM model by improving the BoQ information structure of the window work. It is expected that this will increase the efficiency of the quantity calculation and analysis work of construction cost of window work. In addition, it is expected that this method will help to analyze and predict changes in construction cost of windows and doors by facility characteristics and type.

Apartment house project cost schedule for integrated management BIM-based BoQ application plan (공동주택 프로젝트 비용일정통합 관리를 위한 BIM 기반 BoQ 구축 및 활용 방안)

  • Zheng, Lianyi;Kim, Woong-Gi;Ham, Nam-Hyuk;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.11 no.2
    • /
    • pp.1-16
    • /
    • 2021
  • Since entering the 21st century, the construction industry has developed faster and faster, and more and more technologies have been applied in the construction industry. BIM technology (Building Information Modeling) was born in this environment. The application of BIM technology can greatly improve the efficiency of cost management and help achieve the goal of cost management. But through BIM to realize project cost management, there is still no good solution. In order to solve this problem, this paper puts forward the concept of WBS structure applied to construction projects by studying the BoQ (Bill of Quantities) list based on BIM, and proposes the numbering method of the structure. The WBS (Work Breakdown Structure) structure proposed in this paper divides more than 5000 cost objects into 133 projects according to the type of work and project schedule. This structure helps to realize the application of BIM in project cost management. Although this article has studied more than 5000 data of three projects, it does not think that it can cover all cost objects in the existing construction industry. The purpose of this article is to propose a solution for cost and Process Control using BIM-based BoQ data.

Improvement of Quantity Take-Off and BoQ through the LOD Criteria Analysis of BIM Models (BIM 모델 표현 수준(LOD) 분석을 통한 내역체계 개선방안 연구)

  • Choi, Hyunjun;Yun, Seokheon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.6
    • /
    • pp.89-97
    • /
    • 2019
  • Recently, BIM has been actively introduced in construction projects. In particular, the introduction of BIM in cost estimating process is expected to improve the accuracy and efficiency of the cost estimate. However, the quantity calculation and BoQ documents preparation process still require manual work. Although the BIM model may support quantification process, it is still problematic that the level of detail of the model must be very detailed to meet the items in BoQ. To address this, it is necessary to analyse the LOD criteria and to analyze the extent to which quantity can be computed according to the level of detail in the BIM model. For the analysis of LOD-based work items, the work item grades were divided into A,B, and C. In this study, the ratio and cost of each item that can be calculated at the LOD level in the detailed design phase are reviewed for each type of work, and the method for improving the quantity calculation using BIM is proposed. In the LOD 300 stage(Detailed design stage), the largest number of items in the class B, the major improvement class, are window and glass work. In addition, the most expensive type of work was analyzed by reinforced concrete work. In the future, it is necessary to suggest appropriate improvement way for items with high item ratios and items with high cost ratios. The results of this study are expected to be used as a BIM-based cost estimation or as basic data for improving the current BoQ system.

Development of Construction Cost Model through the Analysis of Critical Work Items (코스트 중요항목 분석을 통한 공사비 예측모델 연구)

  • Lee Yoo-Seob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.212-219
    • /
    • 2003
  • In construction project planning and control, a cost model performs a critical role such as cost determination on a contract stage and cost tracing. The model can maximize owner's profit and value within the project budget and optimize cost management works on overall construction implementation stages. A BoQ(Bill of Quantities) generally adopted in a unit price contract has been applied as an important tool for cost control and forecast. However a previous cost model based on the BoQ has shown limitations in that it requires too detailed information and heavy manpower on cost management and difficulty in keeping relationship with construction planning, scheduling and progress management. The each cost items and unit prices which constitute of construction works are individually very important management factors but the relative weight for each items and prices have a difference on the contents and conditions of each conditions of each construction works. In consideration of this structural mechanism of cost determination, this research is aimed at examining the critical factors affecting the construction cost determination and propose and verify a new cost forecasting model which is more simple and efficient and also keeps the accuracy of cost management.