• Title/Summary/Keyword: Blasting in urban area

Search Result 37, Processing Time 0.021 seconds

Application of Automated Measuring System for the Underground Construction in Urban Area (도심지 근접시공의 자동계측응용)

  • 남순성;정상용
    • Explosives and Blasting
    • /
    • v.15 no.2
    • /
    • pp.53-72
    • /
    • 1997
  • It is impossible to precat the behavior of ground soil and structure accurately during underground construction in urban area or excavation in soft ground area because of difference between the assumed design condition and the actual site condition. Therefore, it must be managed by measuring system and correct the difference by real data. Large scale under ground construction in urban area like a seoul subway project has needed for Intelligent Construction technique, a field of the Engineering Contractor. The automated measuring system is developed for the technique. It is described that the procedure and the method of measuring work with application of the automated measuring system.

  • PDF

A Case Study of Deck-Charge Blasting Using Electronic Blasting Systems In Urban Area (분산장약공법을 이용한 도심지 전자발파 시공사례)

  • Son, Young-Bok;Kim, Gab-Soo;Kim, Jae-Hoon
    • Explosives and Blasting
    • /
    • v.34 no.3
    • /
    • pp.21-26
    • /
    • 2016
  • In case of urban blasting works at near neighbors, the size of one blasting should be minimized to reduce the vibration and noise. However, the complaints is not decreased due to increased numbers of blasting per day so that the period of blasting works become long. This case study is related to urban apartment construction site. In order to overcome the weakness of general detonators which is required many blasting times to meet the day productivity, we have been applied deck-charge blasting method using electronic detonators and then we successfully increased the day productivity with much less blasting times. Hence, we had effectively achieved the declined neighbors'complaints and shortening construction period.

Analysis of the Maximum Principal Strain on the Splitting Surface by Blasting Detonation Pattern (발파 기폭 패턴에 따른 분할 단면의 최대주변형률 분석)

  • Song, Jeong-Un;Kim, Seung-Kon;Park, Hoon
    • Explosives and Blasting
    • /
    • v.37 no.2
    • /
    • pp.1-13
    • /
    • 2019
  • In this study, Rock deformation on the splitting surface was investigated by using the finite element code relating to the blasting in urban area. The maximum principal strain according to the blasting detonation pattern was analyzed by the modeled blast section, and deformation of the splitting surface formed by the numerical analysis and the real blasting were compared. As a result, it was found that the maximum principal strain was observed a difference according to the blasting detonation pattern on the splitting surface, and the splitting surface was showed a similar waveform both the numerical analysis and the real blasting.

The Development of Soundproof System for the Blasting Noise Reduction in Tunnels (터널 발파소음 감쇠를 위한 방음시스템 개발)

  • 노상림;김욱영;조영천;이상필;유지영
    • Explosives and Blasting
    • /
    • v.22 no.1
    • /
    • pp.67-74
    • /
    • 2004
  • Blasting in urban area has become a serious issue in our living because it causes inconvenience to the resident living by construction area. Therefore, the practical solution and the better method for reducing blasting noise are highly required. However, finding practical solutions for the blasting noise is very difficult due to the lack of basic data and insufficient existing research. In order to overcome the limitation of existing sound barrier, we applied a new material to multi-layer soundproof system in the construction site, Kuksabong Tunnel in Yang Nyung-Ro. The statistical method was used to analyze blasting noise data. Through all these processes, it was verified that the soundproof system in this study was very effective method to decrease blasting noise.

The Characteristics of Blasting Vibration in the Construction of Apartment and Buildings in Urban Area (도심지 발파공사장의 발파진동 특성)

  • 이연수;장서일
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2004.05a
    • /
    • pp.521-526
    • /
    • 2004
  • In order to evaluate the effect of blasting vibration in buildings and it's resident located around blasting construction field in urban area, blasting vibration characteristics were measured the vibration level, vibration velocity. The 250g and 750g of charged powder were used at the apartment and at the ground, respectively. In the measurement of the ground, Z(perpendicularity) axis was the highest value in vibration level, but vertical axis was the highest value at 25m point and longitudinal axis was the highest value at 50m point in vibration velocity. The amount of measurement was high value when measuring point is higher than blasting source, while that of measurement was low value when measuring point is lower than blasting source. In the measurement of the apartment, 2 axis was the highest value in vibration level, but in vibration velocity transverse axis was the highest value at ground, was vertical axis at 1st floor, was longitudinal axis at 3rd floor and was vertical and longitudinal axis at 5th floor. The vibration level and the vibration velocity of 50m point showed higher correlation value than 25m point at the ground, but those of 25m point showed higher correlation value than 50m point at the apartment.

  • PDF

The Characteristics of Blasting Vibration in the Construction of Apartment and Buildings in Urban Area (도심지 발파공사장의 발파진동 특성)

  • 장서일;이연수
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.14 no.7
    • /
    • pp.632-638
    • /
    • 2004
  • In order to evaluate the effect of blasting vibration in buildings and it's resident located around blasting construction field in urban area, blasting vibration characteristics were measured by the vibration level, vibration velocity. The 250g and 750g of charged powder were used at the apartment and at the ground, respectively. In the measurement of the ground, 2 (perpendicularity) axis was the highest value in vibration level, but vertical direction was the highest value at 25 m point and longitudinal direction was the highest value at 50 m point in vibration velocity. The amount of measurement was high value when measuring point is higher than blasting source, while that of measurement was low value when measuring point is lower than blasting source. In the measurement of the apartment, Z axis was the highest value in vibration level, but in vibration velocity transverse direction was the highest value at ground, was vertical direction at 1st floor, was longitudinal direction at 3rd floor and was vertical and longitudinal direction at 5th floor. The vibration level and the vibration velocity of 50 m point showed higher correlation value than 25 m point at the ground, but those of 25 m point showed higher correlation value than 50 m point at the apartment.

The Vibration Velocity and Vibration Level of Near-field Blasting Vibration in an Urban Blasting Site (근접장 발파진동에서 진동속도와 진동레벨)

  • Lee, Yeon-Soo;Chang, Seo-Il
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2005.05a
    • /
    • pp.766-771
    • /
    • 2005
  • To compare blasting vibration at blasting construction field in urban area, the vibration level (dB(V)) and vibration velocity (cm/sec) on the ground and the structure of buildings due to the differences of the measuring sites from the blasting source is investigated and the difference between the measured vertical vibration level and the calculated vibration level by using vibration velocity PVS and the correlation between vibration velocity and vibration level and is studied in the thesis.

  • PDF

A Case of the Alternative Method to Improve the Ambient Vibration Blasting Method Applied NATM Tunnel Construction in Urban Areas (도심지 NATM 터널 굴착시 적용된 미진동발파 공법 개선사례)

  • Lee, Jong-Yoon;Hwang, Yeon-Soo;Choi, Hack-Yong;Bae, Hyo-Jin
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.535-542
    • /
    • 2010
  • Various difficulties have been increased in the construction of public structure; like the road in the overcrowding urban area, because of civil complaint, cost and period of construction. In oder to overcome these social problems, the tunnel has been planned the road design. Despite the resolution, there are many technical problems when constructed near facilities. The design of new tunnel below the existing service reservoir is applied to the ambient vibration blasting using Plasma. The result of test blasting was exceeded the standard ("2kine"). So it was considered a countermeasure for the vibration reduction applied to change the controlled blasting method, reduce the charge, add the pre middle horizontal hole in the cut blasting site, and so on. The result was satisfied the standard. Accordingly, if the quality of blasting process can be managed well, the application of this alternative method is highly effective one. Also, based on cost analysis between two methods, the alternative method is very competitive.

  • PDF

A Study on Data Analysis of Ground Vibration.Noise Dust Dispersion Measurement for Enhancing Safety at the Construction Sites - Focussed on Blasting and Piling in Sedimentary and Igneous Rocks in the Youngnam Area - (건설 현장에서 안전성 향상을 위한 지반진동.소음.비산먼지 측정자료의 분석에 관한 연구 -영남지역의 퇴적암.화성암층에서의 발파 및 항타작업을 중심으로-)

  • 안명석;류창하;박종남
    • Explosives and Blasting
    • /
    • v.19 no.3
    • /
    • pp.91-104
    • /
    • 2001
  • As in Korean environments with mountainous and hilly areas, the rock generally has to be removed in construction or civil engineering work in tunnelling or excavation for development in urban area. Explosives should be used for blasting, which may cause serious problems on local people for their claim for compensation due to ground vibration, noise. For safe and economic blasting, geology and engineering characteristics of rocks such as discontinuities of rock or weathering are very important factors, together with site characteristics for prediction of ground vibration. In this study, conducted were the detailed study for major rocks most widely distributed in the South-east area, in-situ geological survey, geological and geochemical analysis, and further laboratory uniaxial rock stress, seismic velocity of core samples together with in-situ seismic velocity measurements. Regulations on ground vibration and noise were reviewed for assessing their adaptabilities, and a total of 4,856 measured blasting vibration data were examined for enhancing the confidence level in estimating the predictive formulation using scaled distance statistically.