• Title/Summary/Keyword: Blasting Noise and Vibration

Search Result 130, Processing Time 0.022 seconds

A Comparative Study on the Effect of Tamping Materials on the Impact Efficiency at Blasting Work (발파작업 시 충전매질에 따른 발파효과 비교 연구)

  • Bae, Sang-Soo;Han, Woo-Jin;Jang, Seung-Yup;Bang, Myung-Seok
    • Journal of the Korean Geosynthetics Society
    • /
    • v.21 no.2
    • /
    • pp.57-65
    • /
    • 2022
  • This study simulated the shock wave propagation through the tamping material between explosives and hole wall at blasting works and verified the effect of tamping materials. The Arbitrary Lagrangian-Eulerian(ALE) method was selected to model the mixture of solid (Lagrangian) and fluid (Eulerian). The time series analysis was carried out during blasting process time. Explosives and tamping materials (air or water) were modeled with finite element mesh and the hole wall was assumed as a rigid body that can determine the propagation velocity and shock force hitting the hole wall from starting point (explosives). The numerical simulation results show that the propagation velocity and shock force in case of water were larger than those in case of air. In addition, the real site at blasting work was modeled and simulated. The rock was treated as elasto-plastic material. The results demonstrate that the instantaneous shock force was larger and the demolished block size was smaller in water than in air. On the contrary, the impact in the back side of explosives hole was smaller in water, because considerable amount of shock energy was used to demolish the rock, but the propagation of compression through solid becomes smaller due to the damping effect by rock demolition. Therefore, It can be proven that the water as the tamping media was more profitable than air.

Suggestion of Safety Level in Fish Farming by Impulsive Sound (충격소음으로 인한 양식어류 피해기준 제안)

  • Choi, Tae Hong;Kim, Jung Han;Song, Ha Lim;Ko, Chin Surk
    • Tunnel and Underground Space
    • /
    • v.25 no.2
    • /
    • pp.125-132
    • /
    • 2015
  • As for noise and vibration occurring due to construction near fish farms, engineering and the technical opinions of experts in different areas were excluded in calculating any damage. The victims tend to present only biological consulting-based opinions while construction companies tend to present information on general construction noise and vibration as they have little biological knowledge on fish. So, the National Environmental Dispute Medication Commission presented specific damage standard in 2009 through studies on standard in calculating compensation and damage assessment of farm-raised fish that were affected by noise and vibration. Currently, 140 dB re $1{\mu}Pa$ is accepted as damage standard of underwater noise in the country. This standard is the RMS value of continuous sounds for more than a second, not the impulsive sounds. To look up the data on existing studies, fish showed different reactions to underwater sounds according to the different kinds of fish such as ostariophysan or non-ostariophysan, and pinnipeds or non-pinnipeds. So, this study will present damage standards for impulsive sounds in consideration of the differences in the characteristics of the impulsive and continuous sounds.

A Case of Shell Structure Demolition Using Explosives (Shell 구조물의 발파해체 사례)

  • Song, Young-Suk;Jeong, Min-Su
    • Explosives and Blasting
    • /
    • v.29 no.2
    • /
    • pp.67-80
    • /
    • 2011
  • Recently, the number of structure demolitions has increased in both civil and architecture fields due to various reasons such as redevelopment of a city, utilization of sites and restoration of deteriorated structures. In the past, domestic shell structures had been constructed with brick masonry and they were not high. Therefore, their demolition had been executed with ease. Recently, however, taller reinforced concrete shell structures have become a target for the destruction. Under these circumstances, how to efficiently demolish a structure and how to minimize effects of the destruction on environment including vibration and noise have become a main issue. One of the possible solutions is the explosive demolition. In this study, a case of explosives demolition of the stack, which is located in Jeju Thermal Power Plant in Republic of Korea and is 70 m tall, is addressed. In order to fall down the structure against the desired direction, 13.5 kg dynamite and 100 electric detonators were used.

Case Study on the Explosive Demolition of the KOGAS Office Building in Bundang District (한국가스공사 분당사옥 발파해체 시공사례)

  • Kim, Sang-min;Park, Keun-sun;Son, Byung-min;Kim, Ho-jun;Kim, Hee-do;Kim, Gab-soo
    • Explosives and Blasting
    • /
    • v.36 no.4
    • /
    • pp.48-61
    • /
    • 2018
  • This case study is concerned with the project of the explosive demolition for the KOGAS office building located in Bundang district in Seongnam city. Since the office building was a kind of long-span beam structures, a mechanical demolition method using jacking support systems was considered in the beginning of the project. With consideration of the excessive reinforcement cost, uncertainty of safety, and prolonged construction period, however, the original plan was later changed to use an explosive demolition method. For the purpose of protecting nearby buildings and facilities during the collapse process, the explosive initiation sequence was elaborately designed to bring down the building structure towards its front left corner. A total of over 550 electronic detonators (Unitronic 600) was used to sequentially initiate the explosives installed at appropriate columns in the first, second, and fifth floors. To diminish dust production, water bags of small and large sizes were respectively installed at each column and on the floors to be blasted. As such, every effort was exercised to mitigate overall noise, dust, and shock vibrations that could be generated during the explosive demolition process for the office building.

Public Nuisance and Aggregate Assessments of the Dangri Crushed Stone Quarry Busan, Korea. (부산직할시 산양사리 당리석산의 채석공해 및 쇄석골재 평가연구)

  • 김항묵
    • Journal of the Korean Professional Engineers Association
    • /
    • v.16 no.3
    • /
    • pp.41-53
    • /
    • 1983
  • The Dangri Crushed Stone Quarry is located in Dangridong, Busan City, and around the estuary of the Nagdong River. The quarry is considered to be a very promised one in the urban area from the standpoints of the assessment of the aggregate rank, the environmental impacts and the transportation distance. The crushed stones for aggregate of the quarry marks the higher rank in the gravity, the absorption ratio, the abrasion ratio, and the stability in comparison with the JISA 5005. The basement vibrations of the residential section in the vicinity of the quarry, which are arised by the millisecond blasting at the quarry site using the gelatin dynamites less than 39kg in weight, are measured to assess the vibration nuisance. The values of acceleration and the magnitudes are less than eight gals and O on the Richter scale respectively, the vibration nuisance thus can be ignored in such scales of the experiments. The traffic vibrations of the residential section are slightly susceptible. In the experiments, the traffic vibrations appears to be sensibler to the basement than the explosion vibration. The explosion noises in the experiments are not checked not only on the RION Sound Level Meter but also to our ears. The values of traffic noises also are in the safety values of the noise nuisance. The crush dust suspends in the air toward the upper valley in the opposite side of the residential area because of the influences of the sea breeze and the valley wind in the daytime, and the monsoon and the topographic disposition. the dust nuisance thus would not be remained in problem. The quarry is operated in the daytime only. The traffic dust in the residential area will be reduced by the faultless pavement and the careful driving. The elaborate survey on the ridges and peaks surrounded the quarry is recommended to prevent in advance the accidents of the rock slide. Moreover, it is required to make an advisory committee to develop the industry and to save the techniques. The most important matter is the accomodation between the attitude of the enterprising man for the social responsibility to the public nuisance and the cooperative spirit of the inhabitants for the industry.

  • PDF

A Case Study on the Design of Railway Tunnel through section for under OO temple (OO 사찰 하부 터널통과 설계 사례)

  • Kim, Shin;Lee, Sung-Ki;Seo, Hyoung-Chul;Kwag, Jung-Yeol;Cho, Bong-Sik
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.208-218
    • /
    • 2006
  • It is very important to evaluate predictable problems diversely such as stability of a tunnel and structures when tunnel is inevitably constructed in the area where is adjacent to a structure and low overburden. Double electrified railway design on the third section of Donghae-Nambu line studied in this paper has some problems mentioned above. So more careful works are required before construction. In this study, ground surrounding is composed of faults, fault zone and set back about 13m from a Buddhist temple located on the upper part of the tunnel. From these conditions, this case study presents proper methods considering ground condition, effects of blasting and civil petitions. It is tried to make the tunnel and Buddhist temple stable by analytical technique and analysis of existing cases. And design considering stability of tunnel and adjacent structure during operation is carried out as well. Especially, environmentally friendly railway tunnel which is appropriate to the local condition and surroundings is designed by minimizing noise and vibration that is able to occur during construction and train service. From now on, this study is helpful to better design in the case of tunnel design which has to consider civil petition.

  • PDF

Prediction of Disk Cutter Wear Considering Ground Conditions and TBM Operation Parameters (지반 조건과 TBM 운영 파라미터를 고려한 디스크 커터 마모 예측)

  • Yunseong Kang;Tae Young Ko
    • Tunnel and Underground Space
    • /
    • v.34 no.2
    • /
    • pp.143-153
    • /
    • 2024
  • Tunnel Boring Machine (TBM) method is a tunnel excavation method that produces lower levels of noise and vibration during excavation compared to drilling and blasting methods, and it offers higher stability. It is increasingly being applied to tunnel projects worldwide. The disc cutter is an excavation tool mounted on the cutterhead of a TBM, which constantly interacts with the ground at the tunnel face, inevitably leading to wear. In this study quantitatively predicted disc cutter wear using geological conditions, TBM operational parameters, and machine learning algorithms. Among the input variables for predicting disc cutter wear, the Uniaxial Compressive Strength (UCS) is considerably limited compared to machine and wear data, so the UCS estimation for the entire section was first conducted using TBM machine data, and then the prediction of the Coefficient of Wearing rate(CW) was performed with the completed data. Comparing the performance of CW prediction models, the XGBoost model showed the highest performance, and SHapley Additive exPlanation (SHAP) analysis was conducted to interpret the complex prediction model.

Application of risk analysis and assessment considering tunnel stability and environmental effects in tunnel design (터널 안정성 및 환경성을 고려한 위험도 평가기법의 적용)

  • Kim, Young-Geun;Kim, Do-Hyung
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.10 no.1
    • /
    • pp.1-15
    • /
    • 2008
  • Recently, because of the various factors by uncertainty of underground, the risks in tunnelling have been occurred increasingly. Therefore, it is very important to estimate and control the risks considering geotechnical conditions for tunnel stability and environmental problems by tunnel construction. In this study, the risk analysis for tunnel stability was carried out by classifying the risk factors such as ground support capacity, ground settlement, the inflow of groundwater into the tunnel and the damage by the earthquake. Also, the risk assessment for the environmental problems was performed by calculating the vibration and noise by blasting and the drawdown of the groundwater level caused by tunnel construction. Each risk factor was evaluated quantitatively based on the probabilistic and statistic technique, then it was analyzed the distribution characteristic along overall tunnel site. Finally, it was evaluated that how much each risk factor influences on the construction cost with a period for tunnel construction, so it is possible to perform reasonable tunnel design which was capable of minimizing the risks in the tunnel construction.

  • PDF

Continuous Excavation Type TBM Parts Modification and Control Technology for Improving TBM Performance (TBM 굴진향상을 위한 연속굴착형 TBM 부품개조 및 제어기술 소개)

  • Young-Tae, Choi;Dong-Geon, Lee;Mun-Gyu, Kim;Joo-Young, Oh;Jung-Woo, Cho
    • Tunnel and Underground Space
    • /
    • v.32 no.6
    • /
    • pp.345-352
    • /
    • 2022
  • The existing NATM (New Austrian Tunneling Method) has induced civil compliants due to blasting vibration and noise. Machanized excavation methods such as TBM (Tunnel Boring Machine) are being adopted in the planning and construction of tunneling projects. Shield TBM method is composed of repetition processes of TBM excavation and segment installation, the machine has to be stopped during the later process. Consecutive excavation technology using helical segment is under developing to minimize the stoppage time. The modification of thrust jacks and module are planned to ensure the advance force acting on the inclined surface of helical segment. Also, the integrated system design of hydraulic circuit will be remodeled. This means that the system deactivate the jacks on the installing segment while the others automatically act the thrusting forces on the existing segments. This report briefly introduces the mechanical research part of the current consecutive excavation technological development project of TBM.

A study on the utilization of abrasive waterjet for mechanical excavation of hard rock in vertical shaft construction (고강도 암반에서 수직구 기계굴착을 위한 연마재 워터젯 활용에 관한 연구)

  • Seon-Ah Jo;Ju-Hwan Jung;Hee-Hwan Ryu;Jun-Sik Park;Tae-Min Oh
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.25 no.5
    • /
    • pp.357-371
    • /
    • 2023
  • In cable tunnel construction using TBM, the vertical shaft is an essential structure for entrance and exit of TBM equipment and power lines. Since a shaft penetrates the ground vertically, it often encounters rock mass. Blasting or rock splitting methods, which are mainly used to the rock excavation, cause public complaints due to the noise, vibration and road occupation. Therefore, mechanical excavation using vertical shaft excavation machine are considered as an alternative to the conventional methods. However, at the current level of technology, the vertical excavation machine has limitation in its performance when applied for high strength rock with a compressive strength of more than 120 MPa. In this study, the potential utilization of waterjet technology as an excavation assistance method was investigated to improve mechanical excavation performance in the hard rock formations. Rock cutting experiments were conducted to verify the cutting performance of the abrasive waterjet. Based on the experimental result, it was found that ensuring excavation performance with respect to changing in ground conditions can be achieved by adjusting waterjet parameters such as standoff distance, traverse speed and water pressure. In addition, based on the relationship between excavation performance, uniaxial compressive strength and RQD, it was suggested that excavation performance could be improved by artificially creating joints using the abrasive waterjet. It is expected that these research results can be utilized as fundamental data for the introduction of vertical shaft excavation machines in the future.