배전자동화 시스템의 복구기능 향상을 위한 Multi-Agent 기반의 분산형 정전복구 시스템 (Distributed Restoration System based on Multi-Agent for Improving Restoration in Distribution Automation System)

  • 임성일;임일형;이승재;권성철;하복남;최면송
    • 전기학회논문지
    • /
    • 제56권4호
    • /
    • pp.660-668
    • /
    • 2007
  • In order to improve the efficiency of service restoration function in the current Distribution Automation System (DAS), in this paper it is proposed a more advanced and efficient service restoration approach using Multi-Agent technique based on distributed networks. In the current DAS, communication networks or protocol structures are centralized with communications between the central station and FRTU through 1:1 connection. In order to maintain the current systems and enhance the proposed Multi-Agent based service restoration scheme, a device of communication and intelligence, named MASX, is newly developed to make a FRTU as an agent to cooperate each others. the proposed system applied in a demo system for an distribution automation system and shows 8 times reduction of restoration time in restoration of blackouts.

The Development of a Flood Protection System for Pad Transformers Using Pneumatic Pressure in Areas Prone to Floods

  • Kim, Gi-Hyun;Lee, Jae-Yong;Bae, Suk-Myong
    • 조명전기설비학회논문지
    • /
    • 제24권3호
    • /
    • pp.27-32
    • /
    • 2010
  • The inundation of substation and ground power equipment breaks out every summer season in low-lying downtown areas and low-lying shores by torrential rain, typhoons and tsunamis. It has, in turn, caused replacement, social and economic costs for blackouts. For activity management regarding flood damage we produced a flood protection system which using the Pad transformer as a basic frame and is developed using pneumatic pressure. We tested safety concerns including insulation resistance and current leakage first for water tank flooding and, second, by an empirical test through supplying 22.9[kV]. We estimate that costs associated with flooding and power failure can be diminished by these advances toward creating a more reliable system.

감도 해석을 통한 전압안정도 예방제어 알고리듬 개발 (Preventive Control Algorithm Using Sensitivity Analysis in Voltage Stability Assessment.)

  • 한상욱;서상수;이병준;장경철;김태균
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 A
    • /
    • pp.483-485
    • /
    • 2005
  • In 2003, there was a wide-area blackout in the United States and Canada. More than fifty million people underwent power failure and the estimated financial loss was about four billion dollars. By such wide-area blackouts, the interest in voltage stability has increased gradually. In order to maintain the voltage stability, the preventive control is essential for a contingency. In this paper, a proper preventive control is determined for defined severe contingencies. Among the preventive control methods (generation rescheduling, load curtailment, tap adjusting, injecting the shunt capacitor, and so on.), this paper presents the injection of shunt capacitors by the sensitivity analysis of the voltage stability assessment for preventive controls. The 2006-2010 KEPCO summer peak system is used in case studies.

  • PDF

Preventing cascading failure of electric power protection systems in nuclear power plant

  • Moustafa, Moustafa Abdelrahman Mohamed Mohamed;Chang, Choong-koo
    • Nuclear Engineering and Technology
    • /
    • 제53권1호
    • /
    • pp.121-130
    • /
    • 2021
  • Cascading failure is the main cause of large blackouts in electrical power systems; this paper analyzes a cascading failure in Hanbit nuclear power plant unit two (2) caused by a circuit breaker (CB) operation failure. This malfunction has been expanded to the loss of offsite power (LOOP). In this study, current practices are reviewed and then the methodologies of how to prevent cascading failures in protection power systems are introduced. An overview on the implementation of IEC61850 GOOSE messaging-based zone selective interlocking (ZSI) scheme as key solution is proposed. In consideration of ZSI blocking time, all influencing factors such as circuit breaker opening time, relay I/O response time and messages travelling time in the communication network should be taken into account. The purpose of this paper is to elaborate on the effect of cascading failure in NPP electrical power protection system and propose preventive actions for this failures. Finally, the expected advantages and challenges are elaborated.

결명자 에탄올 추출물이 알코올로 유도로 유도한 기억 장애에 미치는 영향 (Effect of an Ethanol Extract of Cassia obtusifolia Seeds on Alcohol-induced Memory Impairment)

  • 권희영;조은비;전지은;이영춘;김동현
    • 생명과학회지
    • /
    • 제29권5호
    • /
    • pp.564-569
    • /
    • 2019
  • 최근 알코올 소비량이 증가함에 따라 과량의 에탄올을 섭취하는 경우 또한 늘어나고 있다. 이런 과도한 에탄올 섭취는 ${\gamma}$-aminobutyric acid (GABA) 수용체의 활성화와 glutamate 수용체의 활성 억제를 통해 신경계를 교란시켜 단기 기억 형성을 방해 한다. 알코올에 의한 인지기능의 저하는 알코올성 black out을 유도할 수 있으며, 반복될 경우 알코올성 치매로 이어질 수 있기 때문에 black out을 예방하는 치료제의 개발이 필요하다. 따라서 본 연구자는 해당 연구를 통하여 Cassia obtusifolia seeds 에탄올 추출물(COE)이 가진 black out 예방제로써의 가능성을 평가하였다. 본 연구에서는 에탄올에 의해 유도된 기억 장애에 대한 COE의 효과를 확인하였다. 실험 동물의 기억력을 측정하기 위하여 수동 회피 실험과 Y자 미로 실험을 수행하였고, 마우스 해마 절편을 사용하여 에탄올이 기억의 형성과 관련하여 장기 강화(long term potentiation; LTP)에 어떠한 영향을 끼치는지 전기생리학을 통해 확인하였다. 또한 ${\alpha}$-amino-3-hydroxy-5-methyl-4-isoxazolepropionic acid 수용체 길항제인 NBQX ($50{\mu}M$)를 사용하여 에탄올에 의한 인지기능 장애와 관련이 있다고 알려진 N-Methyl-D-aspartate (NMDA) 매개 field 흥분성 시냅스 후 전위를 측정하였다. 결과적으로, COE는 에탄올에 의한 기억력의 손상을 방지하였고, 해마 절편에서 에탄올에 의해 감소된 LTP와 NMDA 매개 흥분성 시냅스 후 전위를 대조군과 비슷한 수준까지 회복시켰다.

A Novel Online Multi-section Weighed Fault Matching and Detecting Algorithm Based on Wide-area Information

  • Tong, Xiaoyang;Lian, Wenchao;Wang, Hongbin
    • Journal of Electrical Engineering and Technology
    • /
    • 제12권6호
    • /
    • pp.2118-2126
    • /
    • 2017
  • The large-scale power system blackouts have indicated that conventional protection relays that based on local signals cannot fit for modern power grids with complicated setting or heavily loaded-flow transfer. In order to accurately detect various faulted lines and improve the fault-tolerance of wide-area protection, a novel multi-section weighed fault matching and detecting algorithm is proposed. The real protection vector (RPV) and expected section protection vectors (ESPVs) for five fault sections are constructed respectively. The function of multi-section weighed fault matching is established to calculate the section fault matching degrees between RPV and five ESPVs. Then the fault degree of protected line based on five section fault degrees can be obtained. Two fault detecting criterions are given to support the higher accuracy rate of detecting fault. With the enumerating method, the simulation tests illustrate the correctness and fault-tolerance of proposed algorithm. It can reach the target of 100% accuracy rate under 5 bits error of wide-area protections. The influence factors of fault-tolerance are analyzed, which include the choosing of wide-area protections, as well as the topological structures of power grid and fault threshold.

계통연계형 에너지저장시스템의 위험우선순위 분석 (Analysis of Risk Priority Number for Grid-connected Energy Storage System)

  • 김두현;김성철;박전수;김은진;김의식
    • 한국안전학회지
    • /
    • 제31권2호
    • /
    • pp.10-17
    • /
    • 2016
  • The purpose of this paper is to deduct components that are in the group of highest risk(top 10%). the group is conducted for classification into groups by values according to risk priority through risk priority number(RPN) of FMEA(Failure modes and effects analysis) sheet. Top 10% of failure mode among total potential failure modes(72 failure modes) of ESS included 5 BMS(battery included) failure modes, 1 invert failure mode, and 1 cable connectors failure mode in which BMS was highest. This is because ESS is connected to module, try, and lack in the battery part as an assembly of electronic information communication and is managed. BMS is mainly composed of the battery module and communication module. There is a junction box and numerous connectors that connect these two in which failure occurs most in the connector part and module itself. Finally, this paper proposes RPN by each step from the starting step of ESS design to installation and operation. Blackouts and electrical disasters can be prevented beforehand by managing and removing the deducted risk factors in prior.

고장파급 시나리오에 기초한 광역정전 해석기법 연구 (Analysis of Power System Wide-Area Blackout based on the Fault Cascading Scenarios)

  • 박찬엄;권병국;양원영;이승철
    • 전기학회논문지
    • /
    • 제57권2호
    • /
    • pp.155-163
    • /
    • 2008
  • This paper presents a novel framework for analysis of power system wide-area blackout based on so called fault cascading scenarios. For a given power system operating state, "triggering" faults or a "seed faults" are chosen based on the probabilities estimated from the hazard rates. The fault probabilities reflect both the load and the weather conditions. Effects of hidden failures in protection systems are also reflected in establishing the fault propagation scenarios since they are one of the major causes for the wide-area blackouts. A tree type data structure called a PS-BEST(Power System Blackout Event Scenario Tree) is proposed for construction of the fault cascading scenarios, in which nodes represent various power system operating states and the arcs are the events causing transitions between the states. Arcs can be either probabilistic or deterministic. For a given initial fault, the total probability of leading to wide-area blackout is estimated by aggregating the individual probability of each fault sequence route leading to wide-area blackout. A case study is performed on the IEEE RTS-79(24 bus) system based on the fault data presented by the North American Electrical Reliability Council(NERC). Test results demonstrate the potentials and the effectiveness of the proposed technique for the future wide-area blackout analysis.

Modeling and Control of Integrated STATCOM-SMES System to Improve Power System Oscillations Damping

  • Molina, Marcelo G.;Mercado, Pedro E.
    • Journal of Electrical Engineering and Technology
    • /
    • 제3권4호
    • /
    • pp.528-537
    • /
    • 2008
  • Primary frequency control(PFC) has the ability to regulate short period random variations of frequency during normal operation conditions and also to respond rapidly to emergencies. However, during the past decade, numerous significant sized blackouts occurred worldwide that resulted in serious economic losses. Therefore, the conclusion has been reached that the ability of the current PFC to meet an emergency is poor, and security of power systems should be improved. An alternative to enhance the PFC and thus security is to store excessive amounts of energy during off-peak load periods in efficient energy storage systems for substituting the primary control reserve. In this sense, superconducting magnetic energy storage(SMES) in combination with a static synchronous compensator(STATCOM) is capable of supplying power systems with both active and reactive powers simultaneously and very rapidly, and thus is able to enhance the security dramatically. In this paper, a new concept of PFC based on incorporating a STATCOM-SMES is presented. A complete detailed model is proposed and a new control scheme is designed, comprising an enhanced frequency control scheme, and a fully decoupled current control strategy in d-q coordinates with a novel controller to prevent dc bus capacitors voltage drift/imbalance. The performance of the proposed control schemes is validated through digital simulation carried out using MATLAB/Simulink.

A New Approach for Corrective and Preventive Control to Unsolvable Case in Power Networks having DERs

  • Dinh, Hung Nguyen;Nguyen, Minh Y.;Yoon, Yong Tae
    • Journal of Electrical Engineering and Technology
    • /
    • 제8권3호
    • /
    • pp.411-420
    • /
    • 2013
  • Recently, Korean system operating conditions have gradually approached an upper limit. When a contingency occurs, the power system may have no solutions. Different from the cases of bad initial guesses or the solutions are too close to the solvability boundary in which numerical methods can be applied, for unsolvable cases, the only way to restore solvability would be structure modifications. In this paper, a new approach for corrective and preventive control to such cases is proposed in two steps: (i) finding any solution regardless its feasibility; (ii) for the infeasible solution, make it feasible with additional modifications at load buses having Distributed Energy Resources. The test case built based on the peak load profile of 2008 by KEPCO including 1336 buses is analyzed. Since reactive power compensation is optimized to restore solvability, all demands are met, therefore no blackouts happen. The proposed method was integrated in the LP program designed by power21 Corporation.