Implementation of Customized 4D and 5D System based on BIM (BIM 기반 사용자 맞춤형 4D 및 5D 시스템 구현)

  • Lee, Jae-Cheol
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.8
    • /
    • pp.55-61
    • /
    • 2016
  • BIM is a rising core technology for increasing the productivity of the AEC industry, but such a paradigm shift is placing excessive demand on the practice of small medium size enterprises. BIM has many useful functions that are difficult to imagine in 2D CAD but BIM programs and the system buildup cost are too expensive. Therefore, small medium size enterprises hesitate to apply BIM in their fields. In this study, a customized 4D and 5D system was implemented using the building information generated from basic BIM tools, such as Revit, MS Project, Navisworks, and Excel VBA's customizing process to review the schedule and verify the quantities according to the schedule. Those programs are so basic in BIM circumstances, that small medium size enterprises can be equipped without burden. As a result, essential building information for 4D and 5D system implementation was investigated and its customizing process was established.

Parametric Modeling and Design of Building Information Model for Extradosed Bridge (엑스트라도즈드교의 BIM 구축 및 파라메트릭 모델링)

  • Park, Yeon-Soo;Lee, Byung-Geun
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.25 no.1
    • /
    • pp.9-18
    • /
    • 2012
  • The BIM called information modeling is used by tool not only it will simply be appearing the image and can save the information. Recently, there is a lot of case that improves the construction productivity by using the BIM during the life cycle of bridge from order to management. Although we already recognize the advantage of BIM, it is a careful phase to use the BIM. Therefore, We made the BIM for bridge, evaluated the possibility that can build the object used in the civil engineer, studied about the utility, the improvement in order to use the BIM properly. As a result, the BIM can recycle the information by using parametric model and attribute the efficiency and accuracy on drawing and calculating the quantity. The BIM is able to help productivity increase by using the builded model after we spend the effort building a model in early stage.

A Strategy for Building BIM+PMIS System (BIM+PMIS 시스템 구축 전략)

  • Yoon, Su-Won;Chin, Sang-Yoon;Shin, Tae-Hong;Choi, Cheol-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.61-67
    • /
    • 2008
  • BIM has been increasingly deployed to the construction industry in order to minimize ambiguity and to reduce errors of the communicated engineering information, for which poor communication due to fragmented industrial structure is mainly responsible. Known BIM use cases and related researches are focusing either (1) on a specialized solution for a given specialty area (e.g. structural engineering planning and early design, material take-off, constructability simulation, etc.), or (2) on handling interoperabillty issues with Industrial Foundation Classes (IFC); Neither of these approaches have sufficiently catered for collaboration and information management in actual construction projects. This paper proposes the strategy for BIM+PMIS (project management information system) system focused on improving PMIS which has been commercially provided with ASP(Application Service Provider). It also describes the architecture of the BIM-based information management module prototype, which is a key component of the BIM+PMIS system.

  • PDF

A strategy for the Introduction and Development of BIM Technology in the Construction Industry (기획특집 - BIM기술 도입 및 단계별 발전 전략)

  • Choi, Cheol-Ho
    • Journal of the Korean Professional Engineers Association
    • /
    • v.42 no.5
    • /
    • pp.23-28
    • /
    • 2009
  • BIM technology has been introduced in various fields of the construction industry recently. The owners of the public construction projects are already interested in BIM technology and they started to apply BIM technology in their projects. This paper introduces the successful BIM cases of overseas and domestics projects and shows how to introduce and apply BIM technology in the architectural design firms and construction companies and how to train their engineers with BIM technology.

  • PDF

특집 (1): BIM을 활용한 MEP(기계.전기.소방) 시공실무- 황영범 (주)정도설비이사

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.247
    • /
    • pp.45-53
    • /
    • 2011
  • 조달청에서는 2012년부터 총사업비 500억원 이상의 건축공사에 대해 3D 건축기법인 BIM 적용을 의무화하는 등 국내에 BIM이 본격 도입될 예정이다. BIM은 건축공사에서 세계적인 추세이며 앞으로 국내 도입이 가속화될 것으로 보여짐에 따라 BIM 도입을 추진하거나 준비중인 업체가 많아지고 있다. 이에 따라, 본지는 지난해 12월호에서 디지털도면 작성의 패러다임 및 BIM에 대한 개괄적인 내용과 함께 조달청의 단계적 BIM 도입 계획 등을 소개했다. BIM에 대한 독자 여러분의 관심이 많아짐에 따라 본지는 이번호에 Mechanical Electronic Plumbing 분야의 활용 사례와 주의사항 등에 대해 한번 더 게재한다.

  • PDF

BIM-based Repair&Replacement (R&R) Cost Estimating Process (BIM기반 건축물 수선교체비 산정 프로세스)

  • Park, Jieun;Yu, Jungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.31-38
    • /
    • 2016
  • In a construction project, the portion for maintenance costs for a building is considerable compared to the initial construction cost. As such, Life Cycle Cost (LCC) analysis is being increasingly utilized to assess the design value of engineering work in Korea. Additionally, the Public Procurement Service in Korea announced that it will be mandatory for all domestic construction projects to adopt BIM. Furthermore, the paradigm for architectural design has shifted from 2D to 3D, and to BIM, which includes a data management system. Within this background, however, there is currently no adequate BIM-based LCC analysis software and the requirements of cost estimation for repair and replacement cost for a building is not completely adequate in BIM tools such as Revit and Archicad. Therefore, this study suggests a process of cost estimation for repair and replacement (R&R) cost based on IFC data. First, we analyzed existing R&R criteria and defined BIM-based requirements when calculating R&R costs. These requirements were extracted from relevant IFC data. Subsequently, this was saved to a database and a BIM-based database was built for R&R cost estimation. Finally, this database was connected with external databases such as R&R Criteria DB and Cost Information DB to calculate R&R costs. This process is expected to improve upon the traditional process of cost estimation of R&R cost by applying a BIM model. The proposed process can contribute to a further standardizing of BIM-based LCC analysis thru application to initial construction costs, energy costs, and other maintenance costs.

A Study on the Using of BIM Data and Template for Construction Progress Management (건설공정관리를 위한 BIM데이터와 템플릿 활용 방안)

  • Oh, Kun-Soo;Park, So-Hyun;Song, Jung-Woo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.8
    • /
    • pp.157-163
    • /
    • 2016
  • BIM is currently applied in some domestic construction firms, but it is not being actively utilized due to changes in working environments and qualms about new studies. In order to utilize a BIM model in the design phase, process information is needed during construction, but the input system and utilization method of the process information's state are not complete. Therefore, we propose a BIM template for construction progress management that can show basic BIM information as the construction progresses in an easy and convenient way. This method will facilitate the adoption of BIM and enhance the productivity of construction companies. To this end, we designed a progress explorer for step-by-step progress and work schedules, and we generated three-dimensional views and a progress list by applying unit information (primary units, part units, and detail units) of the work breakdown structure (WBS) to the parameters. To use the BIM template, work progress information is input to the BIM modeling objects through Dynamo. We also used Dynamo for quick and easy calculation of the quantity of materials needed for construction work. To test the BIM template, we applied it to an actual project and evaluated its visibility and a progress list. The results showed that the proposed BIM template facilitates progress management of a project and can thus facilitate the adoption of BIM and improve the productivity of construction companies.

A study on extracting of 2D Drawings from BIM Model which consideration of Korean Standard of the CAD drawings (2D 전자도면표준을 고려한 BIM모델에서의 2D도면추출에 관한 연구)

  • Seong, Jun-Ho;Chae, Kab-Su;Choi, Jong-Chun;Kim, Khil-Chae
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2009.04a
    • /
    • pp.573-577
    • /
    • 2009
  • 최근 건설업계에서는 3D객체기반인 Building Information Modelling(이하 BIM)에 대해 관심이 증가하기 시작했다. 하지만 BIM도입에 어려움을 격고 있는 것이 현실이며 특히 전통적인 정보교환 방식에서의 BIM을 적용하는데 가장 큰 어려움을 격고 있다. 현재 국내에 활용되는 전자도면 표준지침에는 BIM도입에 필요한 2D표준에 대한 내용은 없으며, BIM소프트웨어들도 이 부분에 대해서 충분히 커스터마이징 되지 않았다. 이는 BIM과도기에 2D도면의 필요성을 인식한다면 원할한 BIM도입을 위해서 반드시 그 대안이 필요하다. 따라서 본 논문에서는 국내 BIM 도입 시 국내 2D 전자도면표준을 고려한 BIM 모델에서의 원할한 2D도면추출에 대해 Template을 활용하는 방안을 제안하였다. 도면표준의 기준은 "건설CALS/EC 전자도면 작성 표준"에 근거 하여 표현기준 및 데이터 작성기준을 Template파일에 적용 시켰으며, 이 후 실험을 통해 BIM 도입 시 효율적인 도면 생산의 가능성을 확인 하였다.

  • PDF

Integrated Management of Process Schedule and Quantity Take-Off for Steel Structures using BIM Information (BIM정보를 활용한 강구조물의 공정 물량 통합관리)

  • Kim, Jin-Uk;Shin, Tae-Song
    • Journal of KIBIM
    • /
    • v.8 no.2
    • /
    • pp.10-18
    • /
    • 2018
  • BIM technologies store, share and integrate the information produced in each sector of the construction industry. From this point on, it increases the efficiency of the work. Currently, quantity take-off and process schedule are derived separately based on BIM technology. When calculating the quantity by process, relevant information shall be collected, reinterpreted, and reevaluated as required by the practice. The purpose of this study is to develop an integrated process and quantity management system through BIM collaboration and to build prototypes for steel structures. The main research is to build a construction BIM model for steel structures and a process BIM model through BIM collaboration. Furthermore, necessary information was selected and processed according to the user's needs for integrated management. Relevant integration outcomes are visualized graphically to maximize utilization. Through these studies, a system for integrated control of processes and supplies is provided, and the results are expected to contribute to the improvement of working efficiency and are easily and quickly reflected in design change and process change. In this study, we intended to enhance the usability of information by linking process schedules with quantity calculations based on BIM. Thus, the process for integrated control of the quantity of structural components by process unit and the BIM based schedule information was established. In addition, the efficiency of the information link of the integrated management system was considered for design changes and process schedule changes.

Interaction between BIM Model and Physical Model During Conceptual Design Stage (설계 초기 단계에서 BIM 모델과 물리적 모델의 상호작용 방안)

  • Yi, Ingeun;Kim, Sung-Ah
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.38C no.4
    • /
    • pp.344-350
    • /
    • 2013
  • It is essential to consider geometry in the early design stage for rational design decisions. However, a crucial decision had been taken by conversation, physical model, and gesture rather than BIM mode which can analyze geometry efficiently. This research proposes the framework of interaction between BIM model and physical model for real-time BIM analysis. Through this real-time system framework of two models, architects can adopt BIM data at early design stage to review analysis of BIM model. It should facilitate dynamic design based on rich BIM information from an early stage to a final stage.