• Title/Summary/Keyword: Bill of Quantities

Search Result 16, Processing Time 0.027 seconds

A Study of the Application for Proper Construction Cost Estimating Method based on the Actual Cost Data (실적자료에 의한 적정 건축공사비 산정 방법에 관한 사례연구)

  • Cho Jae-Ho;Park Sang-Jun;Chun Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.383-386
    • /
    • 2001
  • The ability to make good cost overruns predictions is a very important aspect of in major construction project. The probabilistic cost models can provide more reliable than traditional cost models which have been used in korea to prepare Bill of Quantities, if the actual cost data are sufficient enough to analyze the trends of the variables. The paper considers non-deterministic methods in a cost estimate. The method(referred to as the 'Monte Carlo simulation' method) interprets cost data indirectly, to generate a probability distribution for total costs from the deficient elemental experience cost distribution. The objectives of this research is to develop a method to forecast the probabilistic total construction cost and the elemental work cost

  • PDF

Investigation on Uncertainty in Construction Bid Documents

  • Shrestha, Rabin;Lee, JeeHee
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.67-73
    • /
    • 2022
  • Construction bid documents contain various errors or discrepancies giving rise to uncertainties. The errors/discrepancies/ambiguities in the bid document, if not identified and clarified before the bid, may cause dispute and conflict between the contracting parties. Given the fact that bid document is a major resource in estimating construction costs, inaccurate information in bid document can result in over/under estimating. Thus, any questions from bidders related to the errors in the bid document should be clarified by employers before bid submission. This study aims to examine the pre-bid queries, i.e., pre-bid request for information (RFI), from state DoTs of the United States to investigate error types most frequently encountered in bid documents. For the study, around 200 pre-bids RFI were collected from state DoTs and were classified into several error types (e.g., coordination error, errors in drawings). The analysis of the data showed that errors in bill of quantities is the most frequent error in the bid documents followed by errors in drawing. The study findings addressed uncertainty types in construction bid documents that should be checked during a bid process, and, in a broader sense, it will contribute to advancing the construction management body of knowledge by clarifying and classifying bid risk factors at an early stage of construction projects.

  • PDF

Development of Construction Cost Model through the Analysis of Critical Work Items (코스트 중요항목 분석을 통한 공사비 예측모델 연구)

  • Lee Yoo-Seob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.212-219
    • /
    • 2003
  • In construction project planning and control, a cost model performs a critical role such as cost determination on a contract stage and cost tracing. The model can maximize owner's profit and value within the project budget and optimize cost management works on overall construction implementation stages. A BoQ(Bill of Quantities) generally adopted in a unit price contract has been applied as an important tool for cost control and forecast. However a previous cost model based on the BoQ has shown limitations in that it requires too detailed information and heavy manpower on cost management and difficulty in keeping relationship with construction planning, scheduling and progress management. The each cost items and unit prices which constitute of construction works are individually very important management factors but the relative weight for each items and prices have a difference on the contents and conditions of each conditions of each construction works. In consideration of this structural mechanism of cost determination, this research is aimed at examining the critical factors affecting the construction cost determination and propose and verify a new cost forecasting model which is more simple and efficient and also keeps the accuracy of cost management.

Automatic Inference of Standard BOQ(Bill of Quantities) Items using BIM and Ontology (BIM과 온톨로지를 활용한 표준내역항목 추론 자동화)

  • Lee, Seul-Ki;Kim, Ka-Ram;Yu, Jung-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.99-108
    • /
    • 2012
  • The rough design information is only available from BIM(Building Information Model) based schematic design. So, it is difficult to obtain sufficient information for generating BOQ. Like 2D design, there are some problems that the results are depend on what the choice of cost estimator. However, the most research of BIM based cost estimation are focus on quantity takeoff, the consideration of work item for generating BOQ is insufficient. Therefore, this paper present automatic inference process of work items in a BOQ using ontology. The proposed process and ontology is validated through applying tiling construction. If the proposed process is utilized, it is expected the basis of developing generation method for consistent BOQ by resolving intervention of cost estimator's arbitrary decision.

A Study on the Construction of Computerized Algorithm for Proper Construction Cost Estimation Method by Historical Data Analysis (실적자료 분석에 의한 적정 공사비 산정방법의 전산화 알고리즘 구축에 관한 연구)

  • Chun Jae-Youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.192-200
    • /
    • 2003
  • The object of this research is to develop a computerized algorithm of cost estimation method to forecast the total construction cost in the bidding stage by the historical and elemental work cost data. Traditional cost models to prepare Bill of Quantities in the korea construction industry since 1970 are not helpful to forecast the project total cost in the bidding stage because the BOQ is always constant data according to the design factors of a particular project. On the contrary, statistical models can provide cost quicker and more reliable than traditional ones if the collected cost data are sufficient enough to analyze the trends of the variables. The estimation system considers non-deterministic methods which referred to as the 'Monte Carlo simulation. The method interprets cost data to generate a probabilistic distribution for total costs from the deficient elemental experience cost distribution.

Improvement of Quantity Take-Off and BoQ through the LOD Criteria Analysis of BIM Models (BIM 모델 표현 수준(LOD) 분석을 통한 내역체계 개선방안 연구)

  • Choi, Hyunjun;Yun, Seokheon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.6
    • /
    • pp.89-97
    • /
    • 2019
  • Recently, BIM has been actively introduced in construction projects. In particular, the introduction of BIM in cost estimating process is expected to improve the accuracy and efficiency of the cost estimate. However, the quantity calculation and BoQ documents preparation process still require manual work. Although the BIM model may support quantification process, it is still problematic that the level of detail of the model must be very detailed to meet the items in BoQ. To address this, it is necessary to analyse the LOD criteria and to analyze the extent to which quantity can be computed according to the level of detail in the BIM model. For the analysis of LOD-based work items, the work item grades were divided into A,B, and C. In this study, the ratio and cost of each item that can be calculated at the LOD level in the detailed design phase are reviewed for each type of work, and the method for improving the quantity calculation using BIM is proposed. In the LOD 300 stage(Detailed design stage), the largest number of items in the class B, the major improvement class, are window and glass work. In addition, the most expensive type of work was analyzed by reinforced concrete work. In the future, it is necessary to suggest appropriate improvement way for items with high item ratios and items with high cost ratios. The results of this study are expected to be used as a BIM-based cost estimation or as basic data for improving the current BoQ system.