• 제목/요약/키워드: Bidding construction cost

검색결과 66건 처리시간 0.029초

설계변경에 의한 공사비의 증감에 관한 연구 (The Research about Increase and Decrease of the Construction Cost by the Alteration of Design)

  • 임칠순;이규철
    • 한국건설관리학회논문집
    • /
    • 제4권4호
    • /
    • pp.106-113
    • /
    • 2003
  • The purpose of this thesis is to provide an appropriate trade-off information for the conflicting interests caused by the various factors between building owner and contractor during selecting the contractor and performing the construction work, in which the construction was contracted by open bidding from the government or private organizations. In order to propose the legitimate evidence, the differences between the domestic contract sheet of drawing change and the process of drawing change and those of the foreign countries were compared and analysed The number of construction ordered in Youngdong area in 2001 whose construction expenses are more than 100,000,000 won is 218 items and 147,005,000,000 won in total cost Among them, the number of 218 items whose total cost amounts to 16,705,000,000 (11.36$\%$) is in case of increase of construction expenses due to the drawing changes, and the number of 48 items whose tool cost amounts to 2,009,000,000 won (1.37$\%$) is the case of decrease. In conclusions, the contractor could have more benefits than the building owner in case they submit the detailed estimate sheet without eliminating the increasing expenses of construction. It is shown that the building owner's loss is increasing whenever the labor cost is higher material cost Therefore, this thesis proposes a proper standards for the harmonious compromise between the contractor and the building owner for the problems caused by the drawing changes when the contract agreement is occurred.

최저가낙찰제도의 적정 낙찰가율 산정을 위한 프로세스 모형 연구 (A Study of Process Model for Estimating Optimal Bidding Rate in the Lowest Bidding System)

  • 안태현;서화진;최광열;강인석
    • 대한토목학회논문집
    • /
    • 제31권5D호
    • /
    • pp.719-726
    • /
    • 2011
  • 정부에서는 최저가 낙찰제도의 무리한 저가투찰을 방지하기 위해 입찰가격 적정성 심사기준 등을 강화하고 있으나, 낙찰가율이 저하되는 근본적인 문제점이 여전히 상존하고 있다. 본 연구에서는 최저가낙찰제도의 입찰금액 적정성 심사기준 문제점을 분석하였으며, 그 결과 발주기관의 기초금액 결정요소의 제한적 공개, 5% 초과분 구분공종의 비율, 부적정공종의 제한적인 심사항목 등이 낮은 낙찰가율을 형성하는 주요 요인으로 파악하였다. 이에 본 연구에서는 기존의 입찰금액의 적정성 심사 절차상의 문제점을 개선 할 수 있는 방법을 제안하고, 적정낙찰가율 범위에서 낙찰자를 선정할 수 있는 입찰금액 적정성 심사 기준을 보완한 프로세스 모형을 제시하며, 기존 발주사례를 통하여 적정성을 검증하고 있다.

국내 건설 엔지니어링 입 ${\cdot}$ 낙찰 제도 개선방안 연구 (Improvement the bidding system in domestic construction engineering procurement)

  • 최봉건;박성제;조훈희
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.632-637
    • /
    • 2006
  • 우리나라의 입${\cdot}$낙찰제도는 1995년 7월에 적격심사제도를 도입하기 전까지 최저가 낙찰제를 근간으로 삼아왔으며, 평균가 낙찰제나 제한적 최저가낙찰제가 보완적으로 시행되어 왔다. 하지만 최저가 낙찰제도에 의해 공사비의 직접비 수준에도 미치지 못하는 저가투찰(덤핑)이 일반화되고 부실공사에 대한 우려가 높아지면서 평균가 낙찰제나 제한적 최저가 방식이 도입되었다. 그러나 평균가낙찰제나 제한적 최저가낙찰제가 건설업체의 기술개발 노력이나 원가절감 노력을 촉진시키지 못하는 문제점이 부각됨에 따라 또다시 경쟁원리를 내세워 최저가 낙찰제로 회귀하는 악순환이 지난 50년간 반복되고 있다. 따라서 사회 ${\cdot}$ 경제적으로 급변하는 건설 환경에 대처하고 건설 산업의 구조개편에 적극 대응하여 국내 건설엔지니어링의 경쟁력을 재고하고, Global Standard와 우리나라의 실정을 모두 충족시킬 수 있는 개선방향을 해외 사례 분석을 통해 제시하고자 한다.

  • PDF

Construction Cost Segregation Process using Building Information Modeling

  • Zhou, Rong;Li, Huimin;Zhang, Chengyi;Lv, Lelin;Tian, Junrui;Cakir, Sevilay Demirkesen
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.1106-1113
    • /
    • 2022
  • Cost segregation helps reduce tax liabilities by reclassifying real property to personal property and accelerates tax depreciation of a property. A typical cost segregation study requires much time and high costs. This study proposed a BIM integrated cost segregation process that can be applied to any commercial building project. The proposed BIM-based cost segregation process was verified in a new commercial construction project. It approved that this approach can: (1) increase the cash flow for the owner and provide assistance to tax-paying enterprises; (2) enable the contractor to use it as an added value in the bidding process; (3) realize data sharing in a common platform to improve the cost segregation study efficiency and reduce costs and errors; (4) contribute to the asset management in the life cycle of buildings while filling in the blank of cost segregation process. Future studies will focus on the automation of cost segregation and asset management in building construction's life cycle.

  • PDF

투찰률을 통한 국내 건설업체들의 입찰행태에 대한 이해 (An Understanding of Domestic Construction Clients' Tender Behavior)

  • 배주현;한상욱;김병일
    • 한국건설관리학회논문집
    • /
    • 제19권1호
    • /
    • pp.74-79
    • /
    • 2018
  • 적정한 낙찰률을 유도하는 제도의 수립은 시설물의 품질보장과 기업의 합리적인 이윤추구를 위해 매우 중요하다. 하지만 과거 낙찰제도의 변화와 최근 사례를 통해 덤핑이나 고가낙찰 등이 남아있어 부실공사, 기업의 적자 또는 세금낭비 등을 유발하고 있는 것을 볼 수 있다. 본 연구는 낙찰률 형성의 배경을 파악하고 기업의 입찰행태에 대한 이해를 증진하기 위해 실제 입찰시장의 데이터를 분석하였다. 투찰률에 각 변수가 주는 영향을 파악하기 위하여 다중회귀분석을 실시하였다. 특히 기업규모를 세분화하여 분석함으로써 기업규모별 상이한 투찰행태를 함께 확인하고자 하였다. 그 결과 사업규모의 경우 모든 기업규모에서 투찰률과 양의 상관관계를 보였으나 연간발주규모, 시공능력평가액의 경우 중소기업과 대기업이 투찰률에 대하여 서로 상반되는 상관관계를 보였다. 본 연구의 결과를 통해 제시된 여러 변수들이 기업이 입찰행위를 함에 있어서 실질적으로 영향을 미치고 있다는 것과 같은 변수라도 기업규모에 따라 투찰률에 영향을 주지않거나 각기 다른 상관관계를 보임을 알 수 있었다.

설계도면 작성기준 최적화 방안에 관한 연구 (A Study on the Optimization plan for Standardization of Engineering Drawing)

  • 김석수;송재호
    • 한국산업융합학회 논문집
    • /
    • 제23권1호
    • /
    • pp.57-64
    • /
    • 2020
  • The construction market became generally opened to overseas and the domestic construction industry has competed with the international construction enterprise of which technical knowledge is superior. In order to compete with the international construction companies, domestic construction industry needs more continuous promotions on the research and development for improving the level of technique of the construction engineering to meet the international norm. This study aims to suggest the better standards of engineering output such as drawings and specifications to correspond the changing integration system and bidding system in preparation for growing international competition. The study starts with comparison and analyses of domestic and international methods and standards for preparing design drawings. And it continues to delve into actual drawing preparation practices, especially focusing on the ones for road and subway construction. Finally, the study presents a better way of the standardization of the main drawings such as general plan, longitudinal drawing, cross section, structural drawings and temporary structure for new bidding systems of historical cost estimation and whole specification tender and for promotion of international competitiveness.

아파트 재건축사업의 수익성평가에 대한 확률적 위험도 분석 모형 적용방안 (Application of Probabilistic Risk Analysis for Profitability-Evaluation of Apartment Reconstruction Projects)

  • 우광민;이학기
    • 한국건설관리학회논문집
    • /
    • 제7권5호
    • /
    • pp.167-176
    • /
    • 2006
  • 현재 재건축사업은 추진 의사결정과 관련한 확정된 지표나 기준이 없이 막연한 수익성에 대한 기대를 토대로 시행되고 있으며, 사업시행과정 에서 직면하게 되는 제반 위험 에 대해 경험 적으로 대응하고 있는 실정이다. 또한 재건축조합이나 시공예정 회사들이 제공하는 관리처분계획에 포함된 수익성에 관한 정보는 결정론적 분석을 통한 단순한 예측에 불과하여 재건축을 시행하는 과정에서 결과가 수정되는 것이 일반적이다. 즉 수익성에 대한 예측이 재건축시행 과정상의 유동적인 상황에서 변경됨에 따라 예측결과에 대한 신뢰도는 근본적으로 내 외적인 한계를 갖고 있다. 본 연구는 재건축사업의 수익성에 영향을 미치는 변수들을 확률적으로 평가하여 수익과 위험을 동시에 분석하는 수익성예측모델을 개발하고, 사례연구를 통해 개발모델의 적합성을 검증하여 기존의 결정론적 접근방식이 갖는 한계를 극복하고자 한다.

건설공사 공사비 예측 및 관리기술 발전방향 : 호주 사례를 중심으로 (Direction for Improving Cost Estimation and Management of Construction Projects : Comparing to Australian System)

  • 지세현;박문서;이현수;윤유상
    • 한국건설관리학회논문집
    • /
    • 제9권2호
    • /
    • pp.170-181
    • /
    • 2008
  • 건설 프로젝트는 생산과정 이전에 설계도면을 바탕으로 예상되는 비용이 산정되며, 기획단계는 소요예산을 책정하고 설계단계는 예산에 합당한 효율적 대안을 찾으며, 정확한 입찰금액을 예측하기 위해 수차례 이루어진다. 특히, 물량산출 이전까지 예측되는 공사비의 정확도와 신뢰도는 매우 중요하다. 그러나, 국내의 경우 면적당 단가 방식 공사비 예측을 벗어나지 못할 뿐 아니라, 단계별 예측방법, 프로세스, 데이터 분석 및 관리기술 등이 표준화되어 체계적이고 종합적으로 관리되지 못하고 있다. 이에 국내 공사비 예측기술 및 관리기술 발전을 위하여 첫째, 표준화된 공사비 데이터베이스 구축과 국가차원의 종합적 관리가 필요하며, 구축 방법으로 다차원 공사비 데이터베이스 개념모델 CUBE를 제시하였다. 둘째 단계별 공사비 예측의 목적에 맞는 코스트 모델 적용이 필요하며, 코스트 모델의 방법론을 기획단계와 설계단계로 구분하여 제시하였다. 셋째, 이러한 두 가지 코스트 모델을 적용한 코스트 플래닝 프로세스를 제시하였고, 넷째, 공사비 예측 및 관리 전문인력 양성의 필요성을 제시하였다.

해외토목 원도급사업의 원가상승 원인에 관한 연구 (Cause Analysis of Cost Overruns in International Infrastructure Project Conducted by Korean Contractors)

  • 정우용;한승헌
    • 한국건설관리학회논문집
    • /
    • 제18권3호
    • /
    • pp.105-116
    • /
    • 2017
  • 최근 국내 대형건설기업은 해외사업에서 큰 손실이 발생하였으며 이러한 손실의 중요한 원인은 저가수주 및 수행역량 때문이었다는 의견이 많았다. 하지만, 원가상승의 원인을 실제사례를 기반으로 실증적으로 검증한 연구는 없었다. 본 연구에서는 13개 대형건설회사에 수행한 67개 해외토목 원도급 사업에 대해, 원가상승률, 예비비, 견적의 여유분, 입찰 전 리스크, 수주 후 발생한 리스크, 수주 후 원가에 영향을 미친 리스크 등을 조사하였다. 이를 바탕으로 본 연구에서 다음과 같은 결론을 얻었다. 첫째, 원가가 상승한 프로젝트는 입찰 전에도 어느 정도 리스크를 인식하고 있었으나 예비비나 견적에 반영된 리스크 금액이 충분하지 못했다. 특히, 원가가 크게 증가한 프로젝트 일수록 이러한 현상이 심하게 나타났다. 둘째, 원가상승의 원인은 내부역량 리스크보다는 외부환경 리스크에 의한 영향이 컸다. 하지만, 원가상승이 컸던 프로젝트에서는 내부역량 리스크도 상대적으로 크게 평가되었다. 셋째, 원가가 증가한 프로젝트들은 리스크 대응 성과가 좋지 않았지만, 원가가 감소한 프로젝트들은 리스크 대응도 중요하지만 입찰 전부터 리스크가 적었던 것으로 분석되었다. 본 연구는 해외건설사업이 보다 나은 원가관리를 위해서, 입찰 전의 리스크 평가와 견적, 수주 후의 리스크 대응에 대해 기초적인 정보를 제공한다.

Framework to Compute Vehicle Emission Costs Associated with Work Zones

  • Shrestha, K. Joseph;Adebiyi, Jeremiah;Uddin, Mohammad Moin;Sturgill, Roy
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.952-959
    • /
    • 2022
  • Active construction work zones will result in longer travel time and/or longer travel distances for road users because of reduced speed limits and/or detours. This results in increased fuel consumption and increased emissions of harmful gases such as Carbon Monoxide (CO), Nitrogen Oxides (NOx), and Sulfur Oxides (SOx), which causes discomfort to the environment and road users around the work zone. The impact of such emissions should be considered while designing work zones or determining the number of days the roadway will be allowed to be closed partially or fully. This study develops a methodology to compute additional road user costs associated with such work zones. To achieve this goal, a) an extensive literature review is conducted, b) a framework to compute emission cost is developed, c) emission rates are computed for all counties (95) of the state of Tennessee, and d) a case study is conducted to demonstrate the use of the framework to estimate the additional impact of emission because of the work zone. For the case study conducted, the emission cost was computed to be $10,653.60 for the duration of the project. State DOTs can account for such road user costs while selecting contractors using A+B bidding. Accounting for such impact of emission will also indicate the agency's willingness to consider sustainability as a part of the business practices.

  • PDF