• Title/Summary/Keyword: Bi-objective Goal Programming

Search Result 3, Processing Time 0.018 seconds

A Fuzzy-Goal Programming Approach For Bilevel Linear Multiple Objective Decision Making Problem

  • Arora, S.R.;Gupta, Ritu
    • Management Science and Financial Engineering
    • /
    • v.13 no.2
    • /
    • pp.1-27
    • /
    • 2007
  • This paper presents a fuzzy-goal programming(FGP) approach for Bi-Level Linear Multiple Objective Decision Making(BLL-MODM) problem in a large hierarchical decision making and planning organization. The proposed approach combines the attractive features of both fuzzy set theory and goal programming(GP) for MODM problem. The GP problem has been developed by fixing the weights and aspiration levels for generating pareto-optimal(satisfactory) solution at each level for BLL-MODM problem. The higher level decision maker(HLDM) provides the preferred values of decision vector under his control and bounds of his objective function to direct the lower level decision maker(LLDM) to search for his solution in the right direction. Illustrative numerical example is provided to demonstrate the proposed approach.

A study on fuzzy goals of system with hierarchical structure (계층적구조를 갖는 시스템의 FUZZY GOALS에 관한 연구)

  • 박주녕;송서일
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.12 no.20
    • /
    • pp.97-104
    • /
    • 1989
  • In this thesis, each objective functions with hierarchical system Bi-level linear programming (BLPP) Problem applications to fuzzy set theory conducted multiple objective programming problem. Using linear fuzzy membership functions make a change typical BLPP and presents modified method turn to account established BLPP method, presents operation results lead to example. Fuzzy Bi-level linear programming problem (FBLPP) can be natural describe realities of life then BLPP.

  • PDF

Preemptive Goal Programming Based Heuristic Methods for Reentrant Flow Shop Planning with Bi-Objective (재방문이 있는 흐름공정의 이종목적 계획을 위한 우선순위 목표계획법 기반의 휴리스틱 방법)

  • Cho, Hang-Min;Jeong, In-Jae
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.35 no.3
    • /
    • pp.240-246
    • /
    • 2012
  • 논문은 병렬 설비로 이루어진 다수의 단계를 포함하는 재방문이 있는 혼합흐름공정의 계획 문제를 다룬다. 재방문작업에서 제품은 몇몇 공정을 여러 번 방문하게 되고 이로 인하여 재공의 혼잡과 장비의 유휴의 원인이 된다. 이 상황에서는 생산성과 고객 만족도를 향상 시키는 것이 중요한 이슈이다. 따라서 본 논문은 혼합흐름공정에서 스루풋을 최대화하고 지연된 고객 수요를 최소화하기 위해 우선순위 목표계획법 기반의 휴리스틱 방법들을 제안한다. 그리고 이 휴리스틱 방법은 이전 문헌에서 제시된 방법과 비교하여 성능을 비교하였다.