• Title/Summary/Keyword: Benefit Estimation

Search Result 235, Processing Time 0.028 seconds

Methodology for Benefit Evaluation according to Maintenance Method and Timing of National Highway Pavement Section (국도포장 유지보수 공법 및 시기에 따른 편익산정 방안)

  • Do, Myungsik;Kwon, Soo Ahn;Choi, Seunghyun
    • International Journal of Highway Engineering
    • /
    • v.15 no.5
    • /
    • pp.91-99
    • /
    • 2013
  • PURPOSES : This study aims at proposing the methodology for benefit evaluations in pavement maintenance methods and timings using KoPMS(Korean Pavement Management System) software which was developed for efficient pavement management. METHODS : This study classified pavement sections into 4 clusters considering AADT(Annual Average Daily Traffic) and ESAL(Equivalent Single-Axle Load) using cluster analysis and used the deterioration models in each cluster. Increased user costs due to pavement deterioration as time goes by and agent costs for maintenance were estimated. Based on deterioration model and KoPMS software, Methodology for benefit evaluation was proposed in pavement maintenance methods and with/without implementation using real pavement section data. RESULTS : This study verified that considering agent costs only would be constrained to decide pavement maintenance methods and timings, and ascertained that decision making with agent and user costs would be effective. In addition, this study revealed that pavement maintenance methods and timings can be affected by AADT and ESAL and frequent pavement maintenances can be more efficient for benefits in pavement sections with more AADT and ESAL. Also this study found that user costs would be more affected to decision making than agent costs. Moreover, Delay of conducting pavement maintenance caused increased vehicle operating costs and environmental costs because of poor conditions of pavements. CONCLUSIONS : This study proposed LCCA and benefit estimation methodology of pavement with considering agent and user costs. The results of this study can be used for baseline data of efficient pavement asset management.

A Study on Differences of Economic Benefits by Volume Calibration in Road Construction Projects (도로시설 규모산정에 있어서 교통량 정산과정에 따른 경제적 편익 차이에 관한 연구)

  • Kim, Sang-Gu;Kim, Geun-Deok
    • Journal of Korean Society of Transportation
    • /
    • v.27 no.5
    • /
    • pp.7-16
    • /
    • 2009
  • This paper proposes a plan which can raise the accuracy of economic benefit estimation in road construction projects. The point of existing economic appraisals may be that the speeds forecasted by models are different from the field speeds because only volumes are calibrated in the road network. The result of such a calibration has an influence on estimating wrong economic benefits in terms of vehicle operating cost savings, travel time savings, and air pollution savings. Then this study performs a calibration when volumes are at the same amount but the calibration between the field speeds and model speeds is different from each other with two different volume-delay functions; the differences of benefits are confirmed according to two different speed calibrations. Three improvement schemes, including the development of a new volume-delay function, are proposed in this study in order to solve the problem of current benefit calculations. The outcome of this study will help practitioners perform more accurate benefit calculations and reasonable economic appraisals.

Analysis of Age Estimation Cases of Living Body Based on Dental aspect in Jeollabuk-do (전라북도 지역의 치과적 생체 연령추정 사례의 분석)

  • Eom, Ae-Ja;Suh, Bong-Jik
    • Journal of Oral Medicine and Pain
    • /
    • v.33 no.2
    • /
    • pp.167-176
    • /
    • 2008
  • We analyzed 121 age estimation clients who had visited oral medicine clinic, Chonbuk National University Hospital, from January 2000 to December 2007 to evaluate its characters in Jeonllabuk-do. The obtained results were as follows : 1. There was distinct difference in sex distribution(Male : 58.7%, Female : 41.3%) and more than half percent(55.4%) was over 50's. 2. The difference between registered and alleged age was the most in more than 5 years, and most of them were over 50's. 3. There were more clients who wanted to increase their age than to decrease and was no prominent difference in sex. Age estimation clients who wanted to decrease their age were predominant under 10 years old and in 20's, and those wanted to increase were predominant in 10's and over 30's. 4. The most reasons to correct age were related to welfare benefit. The purpose of age estimation was different according to each age groups; welfare benefit was the most over 50's, occupation in 40's and 50's, friendship in 30's and 40's, sibling-related in 50's, employment in 10's and 20's. 5. Age was estimated by the attrition of permanent tooth and pulp/tooth ratio from 20 years, root apex closure for 10's and calcification of permanent tooth under 10 years old. In cases that were difficult to estimate by use of the attrition of permanent tooth and pulp/tooth ratio, age was estimated by missing time of permanent tooth and the change of mandibular angle with age. 6. The estimated ages were close to alleged age in 77.7% of clients but the rest(22.3%) was close to registered age.

A Model for Man-Machine System Evaluation (II) (인간 - 기계시스템의 평가모델 (II))

  • 이상도;하정진;정중희;이동춘
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.9 no.13
    • /
    • pp.17-22
    • /
    • 1986
  • Man-machine system is an integrated total system which is linked by functions of man and machine, and the value of the system is determined by its compatability. And it is able to evaluate the system value on the aspects of utility, availability, and cost benefit. The authors previously represented the methodology of system utility using transfer functions, and this paper successively discusses the reliability of man-machine system. The reliability estimation and evaluation methodologies are briefly mentioned, and some examples are shown in this paper.

  • PDF

Bayesian Estimation in Bioequivalence Study

  • Lee, Seung-Chun
    • The Korean Journal of Applied Statistics
    • /
    • v.24 no.6
    • /
    • pp.1095-1102
    • /
    • 2011
  • The classical two-period, two-sequence crossover design is no longer sufficient to assess various demands in a bioequivalence study. For instance, to estimate the within-subject and between-subject variances of test and reference formulations separately, it is necessary to use a replicate design in which each subject receives at least the reference formulation in two periods. Several designs were studied to satisfy the demands. It is provided a unified Bayesian approach applicable to those study designs. The benefit of the method in the bioequivalence study is discussed.

Risk based benefit estimation according to replacement scenarios of CNG bus (천연가스버스 대체 시나리오에 따른 위해도 편익 평가)

  • 김예신;임영욱;이용진;신동천
    • Proceedings of the Korea Air Pollution Research Association Conference
    • /
    • 2002.11a
    • /
    • pp.405-406
    • /
    • 2002
  • 서울시 대기오염물질의 배출량 중 맡은 부분이 자동차 배출물질에 의한 것임은 잘 알려진 사실이다. 특히 이 중 디이젤 연료를 사용하는 자동차 배출량의 기여도가 가장 큰 것으로 알려져 있다 따라서 환경부에서는 디이젤의 대체 연료인 천연 가스를 시내 버스에 적용하여 점차적인 보급을 계획 중에 있다. 청정연료로 알려진 천연가스는 특히 입자상 물질이나 오존 등의 감소에 큰 역할을 하는 것으로 알려져 있다. (중략)

  • PDF

A Study on the Methodologies of Economic Analysis for National R&D Program (국가 연구개발사업의 경제성분석 방법론 고찰 : 가치평가를 중심으로)

  • Rim, Myung Hwan
    • Journal of Information Technology Applications and Management
    • /
    • v.21 no.4_spc
    • /
    • pp.345-359
    • /
    • 2014
  • Technological, policy and economic factors are both important variables in maximizing the results of a national R&D program and key indicators in evaluating an R&D program's eligibility for financial support. Economic analysis, in particular, is used when selecting R&D programs, setting priorities, and estimating economic effects. This paper examines a series of methodological issues related to the economic analysis of national R&D programs within the framework of the current preliminary feasibility evaluation system, and proposes alternative approaches to each of the issues discussed. The issues include the definition of R&D valuation and establishment of valuation factors; estimation of sales attributable to R&D investment; assessment of the total economic value of R&D as intellectual assets; estimation of R&D benefits and assumption of related to sales; and the application of discount rates based on the weighted average cost of capital. Finally, this study presents directions for future research on analytical procedures and methods of improving the reliability of the results of economic analysis within the national technology planning system.

The Estimation of VTTS using Traffic Regulation Obedience Choice Model (교통법규준수선택모형을 이용한 통행시간가치의 추정에 관한 연구)

  • 송영남
    • Journal of Korean Society of Transportation
    • /
    • v.19 no.4
    • /
    • pp.49-57
    • /
    • 2001
  • Since the value of travel time savings is found to be the most important benefit of transportation projects, considerable work has been done on the estimation of the value of travel time in many countries, including U. S. A. England, Australia, and Korea. And majority of them was mode choice model. This paper estimated the VTTS for commuters using traffic regulation obedience market model, which had not been applied in any previous studies, and survey data, which was obtained using Contingent Valuation Method. The result meets our expectations.

  • PDF

High accuracy online 3D-reconstruction by multiple cameras

  • Oota, Yoshikazu;Pan, Yaodong;Furuta, Katuhisa
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2005.06a
    • /
    • pp.1749-1752
    • /
    • 2005
  • For online high accurate reconstruction of an object from an visual information, a linear reconstruction method for multiple images is popular. Basically this method needs many cameras or many different screen shots from different view points. This method, however, has the benefit of less calculation and is adequate for a real time application by comparing other popular method. In this paper, online reconstruction system using more than three cameras is treated. An evaluation method of cameras' position, and of the number is derived for the linear reconstruction method. To decrease errors that are caused from skew of lens, positional error between corresponding points is taken into consideration on the evaluation. The proposed evaluation method enables estimation of the adequate number of cameras and then of feasible view locations. Additionally, repeating search of epipolar lines enables estimation of the hidden point. Comparing with result of an average error analysis, it was confirmed that the proposed methods works effectively.

  • PDF

A Scheme for Estimating Number of Tags in FSA-based RFID Systems

  • Lim, In-Taek
    • Journal of information and communication convergence engineering
    • /
    • v.7 no.2
    • /
    • pp.164-169
    • /
    • 2009
  • An RFID system consists of radio frequency tags attached to objects that need to be identified and one or more electromagnetic readers. Unlike the traditional bar code system, the great benefit of RFID technology is that it allows information to be read without requiring contact between the tag and the reader. For this contact-less feature, RFID technology in the near future will become an attractive alternative to bar code in many application fields. In almost all the 13.56MHz RFID systems, FSA (Framed Slot ALOHA) algorithm is used for identifying multiple tags in the reader's identification range. In FSA algorithm, the tag identification time and system efficiency depend mainly on the number of tags and frame size. In this paper, we propose a tag number estimation scheme and a dynamic frame size allocation scheme based on the estimated number of tags.