Proceedings of the Korean Institute of Intelligent Systems Conference
/
2001.12a
/
pp.56-59
/
2001
In this paper, unmaned fully automation systems are applied for the CSTR(Continuously Stirred Tank Reactor) and, SBR (Sequencing Batch Reactor) wastewater treatment pilot plant. This plant is constructed in the country side which is little far from a main city. So networks and wireless modules are employed for the data transmission. The SBR plant has a local control and monitoring system which is contained communication parts which consist of one ADSL (Asymmetric Digital Subscriber Line) network and one CDMA (Code Division Multiple Access) module. Remote control and monitoring systems are constructed at a laboratory in a metropolis.
Taihu Lake is a major water source for part of Yangtze Delta, which is one of the most urbanized and economically prosperous areas in China. In last couple of decades, some parts of the lake were highly polluted due to eutrophication. This study analyzed dioxin-like potential and mutagenic potential in surface water samples from Taihu Lake. The samples were prepared by XAD-2 resin procedure. A batch of biological assays, including dioxin-like potential microassay with the rat hepatocyte cell line H411E, and Ames test was employed in the research. Results showed that jour water samples have high content of dioxin-like biological potential, the highest activity TEQ to 2,3,7,8-TCDD was 48 pg/ι in sample 1. The mutagenic effect with reading-frame shifting mechanism was confirmed in 3 of 4 samples. The effective sewage treatment facilities and reliable monitoring surveillance system are urgently needed for this area.
For a more effectively designed gravity thickener, thickening experiments were conducted for residuals produced by a ceramic membrane water treatment plant (WTP). Two kinds of residuals, one from backwashing (BW) and the other from chemically enhanced backwashing (CEB) procedure, were separately collected during a pilot plant experiment and their limiting solid flux ($SF_L$) measured. Batch thickening experiments showed that the BW and CEB residual had $SF_L$ of 10 and $25kg/m^2{\cdot}d$, respectively. Continuous operation of a pilot-scale gravity thickener proved that a mixed BW and CEB residual could be successfully thickened at the solid loading rate (SLR) of $12kg/m^2{\cdot}d$, allowing the concentration of the thickened residual to be about $15kg/m^2{\cdot}d$. From the experimental results and consideration of the seasonal thickening characteristics of the residual, SLR of $15kg/m^2{\cdot}d$ was proposed as a design parameter for full-scale gravity thickeners.
Journal of Institute of Control, Robotics and Systems
/
v.4
no.6
/
pp.802-810
/
1998
The purpose of this study is to find the analytic solution of determining the optimal capacity of processes and storages to meet the product demand. Recent trend to reduce product delivery time and to provide high quality product to customer requires the increasing capacity of storage facilities. However, the cost of constructing and operating storage facilities is becoming substantial because of increasing land value, environmental and safety concern. Therefore, reasonable decision making about the capacity of processes and storages is important subject for industries. The industrial solution for this subject is to use the classical economic lot sizing method, EOQ(Economic Order Quantity) model, trimmed with practical experience but the unrealistic assumption of EOQ model is not suitable for the chemical plant design with highly interlinked processes and storages. This study, a first systematic attempt for this subject, clearly overcomes the limitation of classical lot sizing method. The superstructure of the plant consists of the network of serially and/or parallelly interlinked processes and storages. A novel production and inventory analysis method, PSW(Periodic Square Wave) model, is applied. The objective function of optimization is minimizing the total cost composed of setup and inventory holding cost. The advantage of PSW model comes from the fact that the model provide a set of simple analytic solution in spite of realistic description of material flow between process and storage. The resulting simple analytic solution can greatly enhance the proper and quick investment decision for the preliminary plant design confronting diverse economic situation.
Lab-scale experiments have been carried out to investigate the effect of F/R ratio of ASBR (Anaerobic Sequencing Batch Reactor) process on the removal of the organic matters in ammonia stripped swine wastewater. Three ASBR inoculated with sludge mixed with granular sludge of UASB (Upflow Anaerobic Sludge Blanket) and anaerobic digested sludge of municipal wastewater treatment plant were operated. Ammonia stripped swine wastewater was used as influent. Prior to conducting the experiments with varied conditions, the effect of increasing organic loading rate from 2.34 to $5.79gTCOD_{Cr}/L$-day at a fixed F/R ratio of 0.1 on the organic removal efficiency has been studied during start-up period. As the result of the experiment, under the condition of varied organic loadings, less than $4.14gTCOD_{Cr}/L$-day, the removed efficiency $TCOD_{Cr}$ of the ASBR process is 83% resulted from the mean value of effluent $TCOD_{Cr}$, 9,125 mg/L during the start-up period. Then ASBRs were operated with F/R ratio of 0.024, 0.303 and 0.91 respectively. Organic loading rate was increased from 4.56 to $15.43gTCOD_{Cr}/L$-day to investigate the effects of F/R ratio and organic loading rate on the organic removal efficiency. As the result of the experiment, less than $6.23gTCOD_{Cr}/L$/L-day, F/R ratio haven't an effect on the organic removal efficiency and the mean removal efficiency of TSS, $TCOD_{Cr}$ and $SCOD_{Cr}$ was about 80%, 86% and 78% at the all of F/R ratio. But as organic loading rate was increased from 8.54 to $12.04gTCOD_{Cr}/L$-day at the F/R ratio of 0.024, the removal efficiency of $SCOD_{Cr}$ decreased from 71% to 63%. The range of decreased removal efficiency of $SCOD_{Cr}$ at the F/R ratio of 0.024 was much more higher than at the F/R ratio of 0.303, 0.91. Thus, as organic loading rate was increased, ASBRs were operated with high F/R ratio to obtain high removal efficiency.
As distributed control systems (DCS) and plant information systems (PIS) are introduced into gas industries, process monitoring systems based on process data have attracted significant interests. However, these technologies have not been fully due to strong nonlinearities of batch processes. The multiway principal component analysis, which has been recently developed, has solved these problems and has been widely used in the industries. However, the lack of statistical background of process operators has been one of major obstacles for maximum utilization of the technology This paper introduces a real time monitoring system for batch gas manufacturing processes that offers a variety of tools that operators can understand and use without serious difficulties. The proposed integrated system covers the whole spectrum of monitoring and diagnosis that include data collection, monitoring and diagnosis. The developed system has been verified to be very effective for monitoring and diagnosis using its application to the construction of monitoring system for a typical industrial batch reactor.
The aim of this study was to investigate the removal efficiency of $17{\alpha}$-methyltestosterone (MT) from aqueous solution by Salvinia cucullata Roxb. ex Bory in an active plant-based reactor with a specific focus on linear regression analysis for the sorption phenomena of MT onto the plant roots. A high performance liquid chromatographic method using UV detection (245 nm) was used to analyse the samples. The batch experiments of the active plant reactor (APR) were established to investigate the ability of Salvinia cucullata to remove MT from the liquid phase. The results revealed that 40% and 60% removal of MT from the liquid phase was observed at 5 min. and at 4 h, respectively. Salvinia cucullata can effectively remove MT from the aqueous solution in APRs. Kinetic studies revealed that the sorption phenomena of MT by Salvinia is best described using a linearized pseudo - second order model. Based on the kinetic parameters, it is likely that during the first 4 h of the contact (t = 0 to t = 4 h) sorption is the major driving mechanism of the disappearance of MT from aqueous solutions. However, at higher MT concentrations, diffusivity of MT has a significant effect on the migration of MT from the bulk stream to the root surface. The isotherm analysis revealed that the sorption kinetics favourably followed pseudo second-order. The results of isotherm analysis have indicated that the sorption of MT onto the root surfaces of Salvinia cucullata was favourable and almost irreversible.
Journal of Korean Society of Environmental Engineers
/
v.39
no.8
/
pp.462-469
/
2017
Eutrophication and shortage of phosphate ore raise the necessity of phosphate removal and recovery from wastewater treatment plants. Especially, a sludge treatment system containing highly concentrated phosphate should be targeted for phosphate removal and recovery. This study thus aimed to evaluate the capability of the struvite crystallization process for phosphate removal and recovery from a sludge treatment system of a wastewater treatment plant. Analysis on phosphate concentrations and masses in the sludge treatment system revealed that digested sludge and centrate have phosphate concentrations and masses, high enough to adopt the struvite crystallization process. Chemical equilibrium modeling indicated that the struvite crystallization reaction substantially occurred with pH higher than 8 and $Mg^{2+}$ concentration 1.2 times higher than its theoretical requirement. A series of batch tests with digested sludge and centrate indicated that the phosphate removal reaction by struvite crystallization followed a first-order kinetics and reached over 80% removal efficiency at equilibrium. Aeration in the batch tests was found to purge $CO_2$ in sludge or centrate and increase pH up to 8.7, without adding NaOH. Thus, we concluded that the struvite crystallization process could be an efficient and economical process for phosphate removal and recovery from a wastewater treatment plant.
Seo, Tae Won;Kim, Moon Suk;Park, Young Dal;Cho, Wook Sang
Journal of the Korea Organic Resources Recycling Association
/
v.20
no.2
/
pp.53-65
/
2012
This study was focused on removal efficiency of complex (or mixed) wastewater from agricultural and industrial plant for advanced treatments by HBR-II process, that was well known to be suitable to the treatment of livestock wastewater. The main purpose of this study was intended to evaluate the applicable feasibility of the HBR-II for revamping the present activated sludge process to the advanced one. And also, the settling study including the batch typed experimental column tests was performed to evaluate the coagulation stability of organic colloidal particles in wastewater. The mid-scale plant of HBR-II process between pilot and laboratory was used for this study. As F/M ratio remains constant in the range of 0.20~0.25 $BOD_5/Kg{\cdot}MLSS/Day$, the efficiency of biological treatment increased. It has been shown that the results of biodegradation study were, for removal efficiency(%), $BOD_5$ 98.4%, $COD_{Mn}$ 92.9%, SS 97.5%, T-N 91.3%, T-P 82.3%, respectively, which were relatively higher than other processes. From this study, HBR-II process would be well applied to the biological treatment of agricultural and industrial complex wastewater.
Journal of the Korea Academia-Industrial cooperation Society
/
v.21
no.11
/
pp.19-27
/
2020
On an offshore plant topside, various types of offshore facilities for processing energy resources, such as oil and gas, and equipment and outfitting for connecting these facilities are installed in a limited space. An offshore plant superstructure is composed of numerous supporting rack structures and reinforcements for securing and supporting offshore installations and the related equipment. This paper describes the development of design support software to support this superstructure design efficiently. The developed design support software, which was based on AVEVA Marine's PML(Programmable Macro Language), supports the parametric method for superstructure design. A method of batch 3D modeling from 2D drawings for supporting rack structure produced in the basic and detailed design was also developed using AutoLisp. In addition, through the application example of superstructure module design, the design support software introduced in this paper can be expected to reduce the design time by more than 90% compared to the use of only basic functions of AVEVA PDMS.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.