• Title/Summary/Keyword: Barge-to-Ship

Search Result 76, Processing Time 0.027 seconds

Numerical simulation for a passing ship and a moored barge alongside quay

  • Nam, B.W.;Park, J.Y.
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.10 no.5
    • /
    • pp.566-582
    • /
    • 2018
  • A moored barge alongside quay can be influenced by a nearby passing ship and its ship-generated waves. In this study, a time-domain numerical method based on a three-dimensional potential flow solver is developed to investigate the passing ship problem with a moored barge alongside quay. Potential flows around the passing ship and the moored barge alongside a quay is directly solved by using a classical finite element method. Total computational meshes including a passing ship, a moored barge and a quay is updated at each step with an efficient re-mesh algorithm. To validate the developed numerical method, a conventional ship wave problem and a passing ship problem on the open sea has been solved and the solutions are compared with the existing data. Then, a series of numerical computations were carried out to investigate the passing ship effect on a moored barge alongside quay. The characteristics of the passing ship effects are studied with varying the simulation parameters such as passing ship speed, separation distance, wall distances and waves. Focus is made on hydrodynamic forces due to the passing ship effect and its ship waves.

A Positioning Mooring System Design for Barge Ship Based on PID Control Approach

  • Kim, Youngbok
    • Journal of Power System Engineering
    • /
    • v.17 no.5
    • /
    • pp.94-99
    • /
    • 2013
  • This paper presents some experimental results about Position Mooring (PM) system applied to the barge ship. In PM operation, the station keeping in surge, sway of vessel is provided by the mooring system. In this paper, a system, consisting of a barge vessel and mooring lines, is mathematically modeled. The position and orientation of vessel is controlled by changing the tensions in the mooring lines. The PID control strategy is applied to evaluate the efficiency of proposed system. Experimental result which corresponds to the applied control strategy is presented and discussed.

Development of the First LNG Bunkering Barge System in Korea (한국 최초의 LNG벙커링 바지시스템 개발)

  • Jung, Dong-Ho;Oh, Seung-Hoon;Jung, Jae-Hwan;Hwang, Sung-Chul;Sung, Hong-Gun;Lee, Jae-Ik;Kim, Eun-Seok
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2018.11a
    • /
    • pp.162-163
    • /
    • 2018
  • This study introduces the R&D project of development of the 1st LNG bunkering barge in Korea. The Design and pilot test of Barge-To-Ship 500cbm LNG bunkering barge system for coastal trading LNG-fueled ship is proposed. The following technologies will be developed from the project ; Basic/Detail design and pilot test of LNG Bunkering barge system, Basic/Detail design and pilot test of LNG bunkering process system considering LNG loading/unloading, Basic/Detail design and pilot test of 500cbm LNG tank in type-C, Evaluation of bunkering performance according to conditions (environment, SIMOPs) by numerical simulation, Performance evaluation of bunkering barge, towed barge and Barge-To-Ship motion considering ocean environment load, and scenario in Barge-To-Ship LNG bunkering. This project will contribute expansion to LNG-fueled ship industry and pave the way to establish LNG bunkering hub port.

  • PDF

Characteristics of Hydrodynamic Interaction on Tug-Barge Using Ship Handling Simulator (선박조종시뮬레이터를 활용한 예부선의 유체력 간섭 특성에 관한 연구)

  • Lee, Sang-Min;Jo, Sang-Hui
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.15 no.1
    • /
    • pp.57-62
    • /
    • 2009
  • In order to investigate the hydrodynamic interaction between the tug-barge and bank or ship which is crossing to the opposite direction, the towing simulations of tug-barge transportation were performed. Heading of barge, yaw moment and lateral force of tug boat were obtained by this simulation. The characteristics of results were analyzed and the safety towing method for tug-barge operation was proposed. In order to reduce the slewing motion of barge for safe towing operation, the speed of tug boat should be kept slow ahead state with shortened towing line as length of barge within the limits of the possible.

  • PDF

Changes of Mooring Force due to Structural Modification of a Barge Ship (바지선 구조변경이 계류력 변화와 안정성에 미치는 영향)

  • Park, Jung-Hong;Kim, Kwang-Hoon;Moon, Byung-Young;Jang, Tak-Soo
    • The KSFM Journal of Fluid Machinery
    • /
    • v.14 no.5
    • /
    • pp.48-54
    • /
    • 2011
  • Structural modifications of a ship may cause a fatal accident such as sinking and wrecking of ship. Especially, barge ship can be easily reconstructed to load more bulk cargo. In this study, for a real accident case, change of mooring force due to structural modification was analyzed to evaluate accident risk. A two dimensional dynamic model for the barge ship was constructed to compute mooring forces with related to floating motion. The equation of motion was established in Matlab code and buoyancy was calculated by using direct integration of submerged volume. The results showed that wind force, current force, and mooring force after rebuilding was approximately 4.3 kN, 14 kN, 1,561 kN respectively. The maximum force of mooring force according to the length of mooring cable were 1,614 kN at 30 m of mooring cable. Thus, an arbitrary modification of ship lead instability and unreliable result so that illegal rebuilding of ship should be avoided.

Characteristic of Hydrodynamic Interaction on Tug-Barge (예부선의 유체력 간섭 특성에 관한 연구)

  • Lee, Sang-Min;Jo, Sang-Hui
    • Proceedings of KOSOMES biannual meeting
    • /
    • 2008.05a
    • /
    • pp.43-47
    • /
    • 2008
  • In order to investigate the hydrodynamic interaction between the tug-barge and bank or ship which is crossing to the opposite direction, we have executed the towing simulation of tug-barge transportation. Heading of barge, yaw moment and lateral force of tug boat are obtained by this simulation. We have analyzed the characteristics of results and propose the safety towing method for tug-barge operation.

  • PDF

A Study on the Hull Resistance Prediction Methods of Barge Ship for Towing Force Calculation of Disabled Ships (사고선박 예인력 계산을 위한 바지선의 선체 저항 성능 추정법 연구)

  • Kim, Eun-Chan;Choi, Hyuek-Jin;Lee, Seung-Guk
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.16 no.3
    • /
    • pp.211-216
    • /
    • 2013
  • Most of hull resistance prediction methods which are used to calculate the towing force of disabled ships are very simple and old-fashioned. In particular, in cases of barge ships, a method similar to the US Navy Towing Manual is being used. This paper reviewed the US Navy Towing Manual and the notification method of Korea Ministry of Oceans and Fisheries and proved that these prediction methods are irrational and inaccurate. Furthermore, a new Modified-Yamagata-Barge method is introduced as a more rational and accurate resistance prediction method which can be applied in case of barge ships.

Experimental Results of Ship-to-Ship Stabilized Mooring System for Mobile Harbor

  • Jeong, Tae-Gweon;Lee, Yun-Sok;Chen, Chao;Kim, Se-Won
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2010.04a
    • /
    • pp.219-220
    • /
    • 2010
  • A new concept of ocean transport system, called mobile harbor, was introduced as a feasibility study in Korea in 2009. Target of the mobile harbor is a smart distance transport of containers with or without cargo handling cranes. Although the mobile harbor project has a lot of topics to deal with, this paper is to focus on only ship-to-ship stabilized mooring, which plays a key role in cargo handling. The ship-to-ship stabilized mooring system was developed and installed on beard a barge of LOA 32m and breadth 12m. The dockside tests as sea test were carried out so as to ascertain ascertained whether the systems can work well to control the barge's motion. The results of dockside test showed that the heave motion of the barge's motion can be reduced by more than 45%.

  • PDF

Experimental Results of Ship-to-ship Stabilized Mooring System for Mobile Harbor

  • Jeong, Tae-Gweon;Lee, Yun-Sok;Chen, Chao;Kim, Se-Won
    • Journal of Navigation and Port Research
    • /
    • v.34 no.4
    • /
    • pp.281-286
    • /
    • 2010
  • A new concept of ocean transport system, called mobile harbor, was introduced as a feasibility study in Korea in 2009. Target of the mobile harbor is a short distance transport of containers with or without cargo handling cranes. Although the mobile harbor project has a lot of topics to deal with, this paper is to focus on only ship-to-ship stabilized mooring, which plays a key role in cargo handling. The ship-to-ship stabilized mooring system was developed and installed on board a barge of LOA 32m and breadth 12m. The dockside tests as sea test were carried out so as to ascertain whether the systems can work well to control the barge’s motion. The results of dockside test showed that the heave motion of the barge's motion can be reduced by more than 45%.

Stability Evaluation during Transportation of Offshore Wind Turbine by Barge (바지선을 이용한 해상풍력발전기 운반에 따른 안정성 평가)

  • Seok, Jun;Back, Young-Soo;Park, Jong-Chun;Kim, Sung-Yong;Cha, Tae-Hyung;Yang, Young-Jun
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.54 no.3
    • /
    • pp.196-203
    • /
    • 2017
  • In general, the installation of offshore wind turbine have been carried out by a jack-up barge or wind turbine installation vessel. In case of using jack-up barge, an additional barge is required to transport offshore wind turbines. During the transportation, barge is affected by environmental conditions such as wave, wind etc. So, it is important to secure the static and dynamic stability of the barge. In this study, fundamental research was performed to evaluate the stability of barge due to use the guide frame. The analysis for static stability of barge was performed under the two loading conditions with or without wave and those results were evaluated according to the Ministry of Oceans and Fisheries rules. Also motion analysis was performed under the ITTC wave spectrum using buoy data and evaluated based on NORDFORSK guideline by using commercial software Maxsurf Motions.