• Title/Summary/Keyword: Bar Chart

Search Result 94, Processing Time 0.022 seconds

The Effect of Graphical Formats on Computer-Based Idea Generation Performance

  • Jung, Joung-Ho
    • The Journal of Information Systems
    • /
    • v.27 no.1
    • /
    • pp.153-169
    • /
    • 2018
  • Purpose Since human brains catch images faster than texts or numbers, infographics has been widely used in business in the form of "information dashboard" to enhance the efficiency of decision-making. Groupware, however, has neglected the adoption and use of infographics, in particular, in the idea generation process. Given that an overall performance of groupware-based idea generation is no better than that of the (paper-and-pencil-based) Nominal Group Technique, Jung et al. (2010) adopted the notion of infographics in the form of performance feedback to solve the productivity paradox. With the consistent results, which demonstrate beneficial effects of infographics on performance enhancement, an interesting observation that groups with the bar chart treatment performed better than groups with the dot chart treatment was made. The main purpose of this study was to find if there were a performance consistency between the outcomes from the previous study and the outcomes from the current study. Design/methodology/approach In experiment 1, we employed the same system used in the previous study (i.e., Jung et al., 2010). As individuals' contributions accumulated, the mechanism visually displayed individuals' performances two-dimensionally in the form of a bar chart or a dot chart. Then, we compared the performance outcomes from this study to the outcomes from previous study (i.e., Jung et al., 2010). In experiment 2, we modified the performance graph to test the effect of "playfulness" on performance by converting dots to car images. Then, we compared the performance outcome from experiment 2 to the outcomes from experiment 1. Findings Just like our interesting (and unexpected) finding in Jung et al.'s study (2010), the outcome confirmed a consistent superior performance of a bar chart. This implies that a bar chart is a better choice when stimulating performance with a visual aid in the context of groupware-based idea generation. Although a bar chart was criticized in a way that errors of length-area judgments are 40 ~ 250% greater than those of positional judgments along a common scale, such illusion turned out to be facilitating upward performance comparison better. Regarding Experiment 2, the outcome showed that the revised-dot graph is as good as the bar graph in terms of quantity and quality score of ideas. We attribute the performance enhancement of the resized-dot to the interaction between the motivational characteristic and the situational characteristic of playfulness because individuals in the revised-dot graph treatment performed better than individuals in the dot graph treatment. Given the order of performance (Bar >= Revised Dot > Dot) that the revised-dot treatment performed the same as (or lower than) the bar treatment, an additional research is warranted to reach to a consistent outcome.

Economic-Statistical Design of VSSI$\bar{X}$ Control Charts Considering Two Assignable Causes (두 개의 이상원인을 고려한 VSSI$\bar{X}$ 관리도의 경제적-통계적 설계)

  • Lee, Ho-Joong;Lim, Tae-Jin
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.31 no.1
    • /
    • pp.87-98
    • /
    • 2005
  • This research investigates economic-statistical characteristics of variable sampling size and interval (VSSI)$\bar{X}$charts under two assignable causes. A Markov chain approach is employed in order to calculate average run length (ARL) and average time to signal (ATS). Six transient states are derived by carefully defining the state. A steady state cost rate function is constructed based on Lorenzen and Vance(1986) model. The cost rate function is optimized with respect to six design parameters for designing the VSSI $\bar{X}$ charts. Computational experiments show that the VSSI $\bar{X}$ chart is superior to the Shewhart $\bar{X}$ chart in the economic-statistical sense, even under two assignable causes. A comparative study shows that the cost rate may increase up to almost 30% by overlooking the second cause. Critical input parameters are also derived from a sensitivity study and a few guideline graphs are provided for determining the design parameters.

A Study on defermination of the economic Parameter in $\bar{x}$-control chart ($\bar{x}$-chart 의 경제적(經濟的) 파라메터 설정(設定)에 관한 연구(硏究))

  • Han, Byeong-Don;Hwang, Ui-Cheol
    • Journal of Korean Society for Quality Management
    • /
    • v.11 no.1
    • /
    • pp.44-50
    • /
    • 1983
  • The main factors of determining the Control Line of the Control Chart can be classified as follows: 1) sample size (n), 2) the factor that determines the spread of Control Limits (B), (3) sampling frequency (h). The determination of these factors can be explained according to the extent that occurrences of assignable cause should be detected. The purpose of this paper are two: one is for composing a model of which use should be designated for economic decision on the size of these factors leading to the Control Line of the Control Chart, the other is about what influence increasing or decreasing condition, according to changeability of the size of these factors, of expect cost can have on the economy when the Control Chart is used.

  • PDF

-Performance Evaluation of $\bar{x}$ and EWMA Control Charts for Time series Model using Bootstrap Technique- (시계열 모형에서 붓스트랩 기법을 이용한 $\bar{x}$ 와 EWMA 관리도의 수행도 평가)

  • 송서일;손한덕
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.23 no.57
    • /
    • pp.123-129
    • /
    • 2000
  • The Bootstrap method proposed by Efron is non-parametric method which doesn't depend on the estimation of prior distribution refer to population. A typical statistical process control chart which is generally used is developed under the assumption that observations follow mutually independent and identically distributed within a sample and between samples. However, autocorrelation greatly affect the developed control chart under the assumption that observations are mutually independent. Many researchers showed that the result which was analyzed by using a typical control chart for the observations which has the correlation violated to the independence assumption can not be true. Therefore, we compared the standard method with bootstrap method and then evaluated them for x control chart and EWMA control chart by using bootstrap method which was proposed by Efron in the AR(1) model when the observations have correlation.

  • PDF

Delay Analysis Method Considering Productivity (생산성을 고려한 공기지연 분석방법)

  • Koo Ja-Min;Lee Jae-Seob
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.438-441
    • /
    • 2003
  • Construction delays are a common occurrence of most construction projects and difficult to analyze. there are some techniques to analyze delays, such as using CPM, Bar Chart but they are not enough to analyze concurrent and productivity lost delays. Productivity lost delays are different to interruption delays in computing the number of delays and analyzing concurrent delay. This paper describes the delay analysis method considering productivity including concurrent delay analysis.

  • PDF

The Exponentially Weighted Moving Average Control Charts

  • Jeon, Jae-Kyeong;Goo, Bon-chul;Song, Suh-ill
    • Journal of Korean Society for Quality Management
    • /
    • v.19 no.2
    • /
    • pp.172-180
    • /
    • 1991
  • The null hypothesis being tested by $the{\bar{X}}$ control chart is that the process is in control at a quality level ${\mu}o$. An ${\bar{X}}control$ chart is a tool for detecting process average changes due to assingnable causes. The major weakness of $the{\bar{X}}$ control chart is that it is relatively insensitive to small changes in the population mean. This paper presents one way to remedy this weakness is to allow each plotted value to depend not only on the most recent subgroup average but on some of the other subgroup averages as well. Two approaches for doing this are based on (1) moving averages and (2) exponentially weighted moving averages of forecasting method.

  • PDF

Capability Analysis of Sensory Quality of Jajang Sauce

  • Imm, Bue-Young;Lee, Ji-Hye;Yeo, Ik-Hyun
    • Food Science and Biotechnology
    • /
    • v.18 no.3
    • /
    • pp.745-748
    • /
    • 2009
  • Sensory quality variations of jajang sauce were monitored by the $\bar{X}-chart$ and capability analysis based on specifications of each sensory attributes. For sensory quality control (QC) of the sauce which has a strong sweetness and sourness, the ratio of sourness/sweetness was examined as a necessary QC factor to maintain the balance of sweetness and sourness. For the sensory QC factors, all the sensory data were divided into individual sensory score of reference which was a pack of sauce manufactured a week ago. The ratio form of sensory data was useful for decreasing individual variations and for increasing normality of data measured by category scale. The overall proportion of out-spec products under normal manufacturing conditions was obtained by capability analysis of sensory data with normal distribution. Out-spec samples were monitored by the $\bar{X}-chart$ of each sensory attributes.

AN EXAMPLE OF REPRESENTING THREE LEVEL'S SCHEDULES WITHIN SCHEDULE HIERARCHY BY BDM TECHNIQUE

  • Seon-Gyoo Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.445-452
    • /
    • 2011
  • The schedule hierarchy in construction project is generally composed of three levels. The highest level is a milestone schedule and represented by Bar Chart format. The middle level is an integrated project schedule (IPS) and represented by CPM (Critical Path Method) format. The lowest level is a detail working schedule and usually represented by Bar Chart. The traditional scheduling techniques such as ADM (Arrow Diagramming Method) or PDM (Precedence Diagramming Method) cannot represent all kinds of schedule within schedule hierarchy as identical schedule format. However, the BDM (Beeline Diagramming Method) technique can represent all kinds of schedule within schedule hierarchy as identical CPM format. This paper describes the basic concept, principle, interpretation methods, and schedule computation methods of the BDM as a new networking technique that can represent all kinds of overlapping relationships between activities, and then presents an example of representing three level's schedules within schedule hierarchy by the BDM technique.

  • PDF

Design of the Robust CV Control Chart using Location Parameter (위치모수를 이용한 로버스트 CV 관리도의 설계)

  • Chun, Dong-Jin;Chung, Young-Bae
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.1
    • /
    • pp.116-122
    • /
    • 2016
  • Recently, the production cycle in manufacturing process has been getting shorter and different types of product have been produced in the same process line. In this case, the control chart using coefficient of variation would be applicable to the process. The theory that random variables are located in the three times distance of the deviation from mean value is applicable to the control chart that monitor the process in the manufacturing line, when the data of process are changed by the type of normal distribution. It is possible to apply to the control chart of coefficient of variation too. ${\bar{x}}$, s estimates that taken in the coefficient of variation have just used all of the data, but the upper control limit, center line and lower control limit have been settled by the effect of abnormal values, so this control chart could be in trouble of detection ability of the assignable value. The purpose of this study was to present the robust control chart than coefficient of variation control chart in the normal process. To perform this research, the location parameter, ${\bar{x_{\alpha}}}$, $s_{\alpha}$ were used. The robust control chart was named Tim-CV control chart. The result of simulation were summarized as follows; First, P values, the probability to get away from control limit, in Trim-CV control chart were larger than CV control chart in the normal process. Second, ARL values, average run length, in Trim-CV control chart were smaller than CV control chart in the normal process. Particularly, the difference of performance of two control charts was so sure when the change of the process was getting to bigger. Therefore, the Trim-CV control chart proposed in this paper would be more efficient tool than CV control chart in small quantity batch production.

Design of Robust $\bar{x}$ Control Chart Using a Location Parameter (위치모수를 이용한 로버스트 $\bar{x}$ 관리도의 설계)

  • Chung, Young-Bae;Kim, Yon-Soo
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.37 no.1
    • /
    • pp.151-156
    • /
    • 2014
  • Control charts are generally used for process control, but the role of traditional control charts have been limited in case of a contaminated process. Traditional $\bar{x}$ control charts have not been activated well for such a problem because of trying to control processes as center line and control limits changed by the contaminated value. This paper is to propose robust $\bar{x}$ control charts which is considering a location parameter in order to respond to contaminated process. In this paper, we consider $\bar{x}_{\alpha}$, that is trimmed rate; typically ten percent rate is used. By comparing with p, ARL value, the responding results are decided. The comparison resultant results of proposed two control charts are shown and are well contrasted.