Construction Sequence Analysis for Checking Stability in High-Rise Building under Construction (초고층 건물의 시공 중 안정성 검토를 위한 시공단계해석)

  • Kim, Jae-Yo
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.618-623
    • /
    • 2008
  • Due to recent trends of the atypical plan shapes and the zoning construction in high-rise buildings, the building stability under construction is arising as an important issue for design and construction plan. To ensure the stability under construction, the differential column shortening and the lateral movements with unbalanced distributions of self-weight of structure members and the load flows before completion of member connections and lateral load resisting system should be checked by construction sequence analysis. This paper presents the scheme of zone-based construction sequence analysis, to check the stability of high-rise building under construction. This scheme is applied to the construction sequence analysis for real high-rise building under construction.

  • PDF

A Study on the Construction Process Management of the Top-Down Construction Method (Top-Down 공사의 공정관리 방법 연구)

  • Kang Hyun-Jung;Rhim Hong-Chul;Lee Ghang;Yun Dae-Jung;Kim Sang-Il
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.05a
    • /
    • pp.133-136
    • /
    • 2006
  • The top-down construction method is an excavation and substructure construction method by excavating earth and building slabs from the ground level to the bottom of a building. The top-down method can be categorized into several types by its process and other technical details. Some of commonly used top-down methods in Korea today are S.O.G., N.S.T.D., and S.P.S. Among these, one method is chosen depending on construction field conditions, cost, construction time and so on. This study explores several factors that may affect the selection of a top-down method. This paper reports preliminary survey results with 54 top-down construction experts and comparison results of 5 top-down construction sites.

  • PDF

INCIDENT FREQUENCY AND SEVERITY FOR CONSTRUCTION FACILITIES

  • Jong-Hyun Park;Jae-Su Jeong;Chan-Sik Lee
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.234-240
    • /
    • 2011
  • Preventing incidents occurred in construction process is important for safe implementation of construction projects. Due to the complexity and magnitude of the project and moreover, poor safe planning and management, construction incidents in Korea have been increasing. Reducing construction incidents effectively, appropriate safety management program in consideration of the incident rate of each facility is to be adapted. This study analyzes incident frequency and severity rate of each facility based on the data of construction sites(about 1,560 thousand cases) recorded by Korea Occupational Safety & Health Agency for 3 years from 2007 to 2009, and the incident related data (about 40 thousand cases) of Korea Workers' Compensation & Welfare Service. The results of this study revealed that construction incident rates of 'cold refrigeration storage facilities' are the highest among building types, followed by traditional building religious building, arcade department store and shopping center. In case of other facilities, the incident rate and the rate of intensity of 'pipelining project' are the highest, followed by 'tunneling project'. These results would be used in providing safety programs beneficial for preventing construction incidents.

  • PDF

The Improvement Plan of Organization Management Through the Survey of Actual Condition in Construction Work (건설공사(建設工事) 실무분석(實務分析)을 통한 조직관리(組織管理) 개선방안(改善方案))

  • Choi, Byung-Ju;Cui, Xian;Choi, Suk-Woo;Kim, Ok-Kyue
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.2
    • /
    • pp.121-129
    • /
    • 2008
  • Domestic exoteric construction market by opening of world construction market with recent FTA of rapidly change. On these time, need quality increase of construction to possess government official and international competitiveness of customer satisfaction by offering consumer building of good quality. Therefore, must establish direction to inspects and must advance forward formation government official's present actual conditions for building company's QI. This study is as following if summarize studying result of formation government official to improve quality in construction spot. First, formation's CEO will for QI need side improvement the formation government official enemy by important thing. Second, at checking activity and systematic action that participate of responsible persons cooperation enterprise space-time by complete charge department organization should be achieved. Third, complete charge department for quality control operation large size construction firm substantially formation Organizational well operate, but heavy hydrogen building company was construed by greatly unprepared misgovernment. AHP analysis result complete charge department is serious necessity, and the CEO under direct control organizational structure was construed by thing which can bring excellent effect in operation management side of quality business side and formation. Therefore, heavy hydrogen building company should does to occupy competitive power high position with tissue at active quality complete charge deputy.

Review of Freeform Buildings using CNC T-BAR System (CNC T-BAR 형상제어 시스템을 활용한 비정형 건축물의 곡면 파사드의 시공사례 검토)

  • Kim, SungJin;Park, YoungMi;Park, JungJoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.58-59
    • /
    • 2017
  • Through the case study, we surveyed the performance of a CNC-T BAR system on irregular-shaped building construction project. By CNC T-BAR system, we mean a surface curvature control system has been used in aircraft and ship manufacturing by controlling entire surface points on shape. For the past 10 year, the number of irregularly-shaped building design and construction project has been increased, and also the studies on irregular-shaped construction methods have been conducted. However, the previous studies did not review on the performance of the CNC T-BAR system. We collected construction-completed cases in Korea, which applied the CNC T-BAR system, and we studied its performance by comparing with a segment system in terms of construction duration and its quality. The result shows that the CNC T-BAR system can shorten the construction duration comparing with segment-assembly system while maintaining high quality. The CNC T-BAR system is expected to apply on the more number of irregularly-shape building construction project.

  • PDF

IMPACT OF CONSTRUCTION MATERIAL COST VARIATION ON THE ON THE FEASIBILITY OF BUILDING PROJECTS IN DEVELOPING COUNTRIES: A CASE STUDY IN VIETNAM RISK

  • Soo-Yong Kim;Luu Truong Van;Byeong-Gi Yoo;Luong Thanh Dung
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.96-105
    • /
    • 2007
  • This paper presents a study on the impact of variation of construction material prices on the feasibility of building projects in Vietnam. The paper makes use of Monte-Carlo simulation for financial risk analysis of net present Value (NPV) and internal rate of return (IRR). To well illustrate the influencing, a case study is presented. The research results show that there is a strong correlation between steel prices, gold prices, and $US exchange rate. Outputs of statistics also reveal that the concurrent variation of prices of cement, steel, sand, brick, formwork and stone has strongly negative impact on NPV and IRR of building projects. The results also indicate that the proportion of steel cost to total construction cost is 17.95% which is the cause of risks for the feasibility of building project in Vietnam. The paper stresses that feasibility study of building project must integrate the impact of construction materials prices in order to mitigate risks in developing countries as Vietnam.

  • PDF

A Preliminary Studty on the Efficient Management Manpower Staffing According to the Building Size -Focused on Office Buildings- (건축규모에 따른 관리인력의 효율적 배치에 관한 기초연구 -오피스 건물을 중심으로-)

  • Lee, Won-Suk;Kim, Shin-Eun;Kim, Sun-Kuk;Lee, Dong-Hoon;Won, Il-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.191-194
    • /
    • 2010
  • Construction companies are now trying a variety of cost-cutting strategies in the midst of recent slump of construction market. Notably, contract workers and local hires are accounting for increasing portion of management manpower as a part of their cost-reduction drive. However, construction site manpower researches to date have focused primarily on productivity analysis of site laborers, with little attention to the productivity of site management resources. This study aims to analyze the staffing status of office building construction site management manpower in reference to project size. Conclusions herein will provide basic inputs for subsequent attempts to build a model to enable efficient staffing of construction site management manpower.

  • PDF

Preliminary study for Vertical Dynamic Site Layout Planning of High-Rise Building Construction (고층공사 가설시설물의 동적수직배치 최적화를 위한 기초연구)

  • Pyo, Kiyoun;Lee, Dongmin;Lim, Hyunsu;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.39-40
    • /
    • 2018
  • The goal of site layout planning(SLP) is to maximize the productivity and efficiency of the construction by reducing travel distance and material handling cost and manpower. However, SLPs are static layout schemes, which cannot be reorganized during the construction process to correspond with errors, phase transition, changing working environments on the site. To solve this problem, researches on dynamic site layout planning(DSLP) are emerging. This preliminary study clarifies characteristics of temporary facility's variables to develop the vertical DSLP algorithm of high-rise building construction.

  • PDF

Construction management Learning Model Applying Team-Based Learning and Flipped Learning (팀기반학습과 플립러닝을 적용한 건축시공 학습모형)

  • Noh, Ju-Seong;Lim, Hyung-Eun;Kim, Jae-Yeob
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.69-70
    • /
    • 2018
  • With increased interest in the Fourth Industrial Revolution, there is also a growing interest in the innovation of college education. In this regard, this study aims to develop a learning model for building construction to nurture architectural engineers needed in the era of the Fourth Industrial Revolution. To this end, it analyzed the previous studies on the recent innovations in engineering education. Among the educational innovation methods presented in the previous research, a new learning model was derived by using the most suitable method for the building construction eduction. The derived learning model is a building construction learning model applying team-based learning and flipped learning. The learning model proposed in this study was developed as a learning method to nurture engineers needed in the future. Therefore, it is expected that this model can be utilized in the eduction of architectural engineering at universities in Korea.

  • PDF

Analysis of Building Service System Construction Flow (건축설비 공사 하자 사례 유형 분석 및 대책)

  • Park, Jin-Kwan;Park, Jong-Il
    • Proceedings of the SAREK Conference
    • /
    • 2006.06a
    • /
    • pp.548-553
    • /
    • 2006
  • The aim of this paper is to analysis mechanical system flaw in building service system construction. From this paper, most mechanical flaws are from design mistakes, material flaws, other engineering construction's negligence of construction execution and careless system operation managements. Through this study, the author suggested the way to reduce mechanical flaw, during construction process from drawing survey before execution start to completion of construction.

  • PDF