• Title/Summary/Keyword: BTL 임대형 민간투자사업

Search Result 24, Processing Time 0.026 seconds

A Study on Efficiency of Mixed Model (BTO+BTL) for Public-Private Partnership Projects (민간투자사업 혼합방식(BTO+BTL)의 효율성에 관한 연구)

  • Kim, Do-Il;Jin, Run-Zhi;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.53-63
    • /
    • 2012
  • Korean Public-Private Partnership, mainly implemented using BTO (Build-Transfer-Operate) and BTL (Build-Transfer-Lease) methods, has contributed in increasing benefits of the people by providing the needed public services in a timely and efficient manner. It has also induced flexible national fiscal management. However, in addition to the repeal of the Minimum Revenue Guarantee (MRG) program in 2009, changes in business environment including recent financial crisis aggravated financial situation in pursing PPPs, resulting in significant contraction of BTO projects. Therefore, the new methods are to be suggested and applied to overcome this situation. This paper seeks to find ways to apply "Mixed Model," characterized as the compound of BTO and BTL, two different implementation methods of PPPs, as an enhanced burden-sharing mechanism.

A Risk Quantification of Public Sector Comparator in the Financial Analysis of the BTL (Build-Transfer-Lease) Scheme of Railway Projects: a Case Study of the Haman-Jinju Link (철도 BTL 민자적격성조사의 위험계량화방안 연구)

  • Jang, Su-Eun;Gang, Ji-Hye
    • Journal of Korean Society of Transportation
    • /
    • v.24 no.5 s.91
    • /
    • pp.67-74
    • /
    • 2006
  • This paper proposes a way to a risk quantification of public sector comparator in the value-for-money test of the BTL (Build-Transfer-Lease) scheme in rail investment projects. Two principal risks that are project delay and budget increasing costs are identified and are empirically quantified with a case study of the Haman-Jinju link. The methodology suggested is expected to be a good reference for the similar research afterwards and also to help in settling down the scheme that is only an early stage.

Analysis on the Welfare Effect of the PPP Implementation (민간투자사업의 후생효과 분석)

  • Kim, Jungwook;Moon, Weh-Sol
    • KDI Journal of Economic Policy
    • /
    • v.35 no.3
    • /
    • pp.1-38
    • /
    • 2013
  • This study investigates the welfare implications of BTL projects using a general equilibrium model with the public sector and public-private partnerships. We show that when the government is not allowed to run budget deficits but private firms is able to overcome the financial constraint, BTL projects performed by public-private partnerships (PPPs) could be a good alternative and improve the welfare of the model economy. This paper quantitatively investigates excessive expansion of PPP projects and several alternatives to retrieve welfare losses caused by such an expansion. Assuming that future rents of BTL projects are not taken into account, we find the welfare losses up to 20 percent relative to conventional government projects. Finally, we show that it would be possible to reduce the losses by transforming the fully depreciated capital stock of the government projects into much smaller new PPP projects.

  • PDF

Item Establishment and Importance Analysis for Qualitative VFM of BTL System (임대형 민자사업(BTL) 적격성 조사의 정성적 VFM 평가항목 설정 및 중요도 분석)

  • Yang, Jin-Kook;Ri, Min-Hyeon;Kim, Soo-Yong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.5
    • /
    • pp.92-100
    • /
    • 2007
  • PFI(Private Finance Initiative) Project is carried to expand infrastructure effectively through participation of private investment. From the year 2005, the range is expanded not only industrial infrastructure such as made road, harbors and so on but living infrastructure such as school facilities, environmental facilities. For this reason BTL(Build-Transfer-Lease) system is mainly used in new private finance initiative project but in existing private finance initiative project BTO(Build-Transfer-Operate) system was used. BTL system is operated to judge fitness of private investment and classified into quantitative VFM(Value for Money) and qualitative VFM. In this research the estimation item of qualitative VFM which is hard to deduce the effect is created and after surveying of questionnaire in target of experts, relative importance and weight is established with AHP(Analytic Hierarchy Process). By estimating efficiency and benefit of quantitative VFM and qualitative VFM aspect effectively it is expected to support a rational making decision for operating BTL.

Promotion of the Private Investments in the Military Facilities through Integration of BTL and BTO Methods (BTL방식과 BTO방식을 혼합한 군시설 민간 투자사업의 활성화 방안의 연구)

  • Kwak, Soo-Nam;Park, Sang-Hyuk;Han, Seung-Heon;Kim, Hyoung-Kwan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.278-283
    • /
    • 2006
  • Koran Government introduced BTL(Build-Transfer-Lease) to provide convenience through early supplying infrastructure and plans to invest 8,315million dollar to 84 projects of 15 BTL type involving official residence and railroad. But some of construction company hates to invest BTL projects because of its low earning rate. In addition if we correctively apply project which partly has profitability to BTL, the earnning rate declines more seriously. So this paper presents BTL+BTO model which operates BTL in the non-profitable parts to improve convenience of users and BTO in the profitable parts to improve earning rate. BTL+BTO model based on operate period was presented and its suitability was confirmed by applting 00 region official residence project.

  • PDF

A Study on Risk Sharing of PPI Project Demand Risk (민간투자사업 수요위험 분담 방식에 관한 연구)

  • Shin, Sung-Hwan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.2
    • /
    • pp.102-109
    • /
    • 2012
  • One of key success factors in PPI(Public Private Investment) is the structure of risk sharing between the public and the private, and the determination mechanism of fair return to private participants relative to the risk that private participants undertake. In Korea, two basic types of PPI exist. One is BTO and the other is BTL. In BTO, most risks are taken by the private whereas the opposite is the case in BTL. No intermediate form exists. As a result, BTO type projects had difficulty in attracting private participants because of the excessive risks. In this study, one intermediate form is studied where demand risk is shared between the public and the private. In the setting where the public authority takes all the project revenues and then pays ladder type payments to private participants depending upon the level of project revenues, appropriate level of fixed payments is endogenously derived using the real option pricing model. From the fixed payments, expected investment returns are calculated based upon a certain distributional assumption. The results of this study is expected to help introducing diverse forms of PPI in Korea.

The Evaluation of Value at Risk in Build Transfer Lease Project (민간투자사업의 위험가치 평가 - 임대형 민간투자사업(BTL)의 위험가치 평가 제도를 중심으로 -)

  • Choi, Seok-Joon;Kim, Sang-Sin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.10
    • /
    • pp.2907-2916
    • /
    • 2009
  • PPPs(Public Private Partnerships) in Korea was introduced in 1990s, which mainly used for providing transportation facilities such as railroad and high-way. Since 2005, a service delivery type PPPs, in other words BTL(Build Transfer Lease) has been implemented, which focused on social infra-structure including school, military housing, and sewage facilities. According to previous literature, efficient risk evaluation and management is the key factor for successful PPPs in the UK and Australia. However, Korea doesn't have proper risk evaluation system for PPP type project. In this paper, we explore and analyze risk evaluation system of PPPs in Korea and other countries. Also, we apply empirical methodology used in the UK to a BTL project and set up a new PSC(Public Sector Comparator) with risk evaluation.

How to Fiscally Manage the BTL Type Project (BTL(Build Transfer Lease) 사업의 재정관리 방향 -국가부채 여부에 대한 판단기준 및 재정 측면에서의 관리방안을 중심으로-)

  • Choi, Seok Joon
    • KDI Journal of Economic Policy
    • /
    • v.29 no.1
    • /
    • pp.137-175
    • /
    • 2007
  • This paper studies the fiscal issues with regard to BTL (Build Transfer Lease) scheme projects, a newly introduced type of PPPs (Public Private Partnerships) in 2005 and tries to provide some policy options. More specifically, we make suggestions to work out the issues such as how to account for BTL transactions and whether to introduce annual budget ceiling system for BTL payment, while we introduce and analyze the experiences of some other advanced countries and international institutes.

A Study on Model Establishment of the Validity Evaluation for BTL Project Expenses Using an Analytic Hierarchy Process (계층분석법(AHP)을 이용한 BTL사업비 타당성 평가모형정립에 관한 연구)

  • Lee, Chun-Kyong;Jung, Young-Han;Park, Tae-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.905-908
    • /
    • 2008
  • The BTL project, 4 years since its operation, has benchmarked the PFI Project in Japan and has been introduced. Given the evaluation step to select a preferred bidder, in a technological factor, the basic plans are corrected and complemented, whereas in a price factor, the low price bidding system is being enforced. There is concern that how to select preferred bidders and how to operate project costs during operation and management period may be problematic. Thus, in this study, using the Analytic Hierarchy Process, the method of deciding the pribrity to select preferred bidders in an early stage of the project and the evaluation model to evaluate the validity of BTL project expenses in process of project enforcement are established. Targeting the group. composed of experts who have experiences in the BTL project. Then, the levelling of evaluation factors and grouping have been carried out as following: LCC analysis and disbursement for government including two more detailed factors.

  • PDF

A Study on Problems and Improvement in Operation of the BTL Projects. (임대형 민자 사업(BTL)에서 운영부문의 문제점 분석과 해결 방안 연구)

  • Noh, Jung-Ho;Lee, Jae-Young;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.686-691
    • /
    • 2006
  • Beginning January 2005, the BTL (Build-Transfer-Lease) project was initiated by government to provide high level of public services for the upgraded quality of life. The most important process of the BTL project is operation, because the company have to operate the building about $20{\sim}30$ years after completion. But a lot of problems have been founded so far. For example, no counterplan for the risk in operation, no total control system and the vagueness in project guideline and so on. These problems will cause serious demage to the BTL project. Hence, this paper analyzes the above issues and conducts the interviews with the professionals from the diverse sectors in order to propose the improvement and deliver the successful operation in BTL project.

  • PDF