• Title/Summary/Keyword: BTL 방식

Search Result 49, Processing Time 0.027 seconds

Promotion of the Private Investments in the Military Facilities through Integration of BTL and BTO Methods (BTL방식과 BTO방식을 혼합한 군시설 민간 투자사업의 활성화 방안의 연구)

  • Kwak, Soo-Nam;Park, Sang-Hyuk;Han, Seung-Heon;Kim, Hyoung-Kwan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.278-283
    • /
    • 2006
  • Koran Government introduced BTL(Build-Transfer-Lease) to provide convenience through early supplying infrastructure and plans to invest 8,315million dollar to 84 projects of 15 BTL type involving official residence and railroad. But some of construction company hates to invest BTL projects because of its low earning rate. In addition if we correctively apply project which partly has profitability to BTL, the earnning rate declines more seriously. So this paper presents BTL+BTO model which operates BTL in the non-profitable parts to improve convenience of users and BTO in the profitable parts to improve earning rate. BTL+BTO model based on operate period was presented and its suitability was confirmed by applting 00 region official residence project.

  • PDF

A Study on the Building Process of Public Libraries Using the BTL Method (임대형 민간투자(BTL)방식에 의한 공공도서관 건립에 관한 연구)

  • Kim, Young-Seok
    • Journal of Korean Library and Information Science Society
    • /
    • v.39 no.4
    • /
    • pp.149-170
    • /
    • 2008
  • This study examines public libraries being built using the BTL (Build-Transfer-Lease) method, which is one type of Private Finance Initiative, in order to investigate effective ways of building public libraries in Korea. A literature search, field research and interviews were the methods used for the study. One library was built and eight other libraries are in the process of construction using the BTL method in six cities in Korea in 2008. The study revealed that the bigger libraries are being built using the BTL method. The study suggests that in order to effectively increase the public library infrastructure within a short period of time in Korea, smaller libraries should be built using the BTL method.

  • PDF

Development of CM Model for BTL Projects in a Public Educational Facilities (공공교육시설 BTL사업의 CM적용모델 개발)

  • Shin, Nam-Kyoung;Woo, Kwang-Min;Lee, Hak-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.338-341
    • /
    • 2006
  • After the revision of Private Investment Law in January 2005, BTL is introduced to expand the social infrastructures as a major business procedure. Especially, the size of the public educational infrastructure ordered by each city education office is increased by 45% compared to last year, so it is major in BTL Project. However, in the process of practicing BTL Project by now, there are a lot of problems specially in the public educational infrastructure. As a result, this study gives the solutions in the process of BTL Project, the CM models to support the Education Office${\square}{\square}$job and the suggestions for the working scope of the participating construction companies.

  • PDF

Analysis of Project Management Firms' Characteristics in BTL Projects (BTL사업 PM사의 특성 분석 연구)

  • Lee, Hyun-Ki;Kim, Han-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.230-233
    • /
    • 2007
  • As a new form of the public procurement method, that is BTL(Build-Transfer-Lease) was introduced in 2005, it has consequently created a new form of emerging business, so called BTL Project Management firms. As a key participant of BTL projects, PM firms play an important role in securing the projects. But due to the short history of BTL, the identity of BTL PM firms has not been widely understood. The objective of this paper is to investigate major characteristics of BLT PM firms for better understanding of the emerging business.

  • PDF

Item Establishment and Importance Analysis for Qualitative VFM of BTL System (임대형 민자사업(BTL) 적격성 조사의 정성적 VFM 평가항목 설정 및 중요도 분석)

  • Yang, Jin-Kook;Ri, Min-Hyeon;Kim, Soo-Yong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.5
    • /
    • pp.92-100
    • /
    • 2007
  • PFI(Private Finance Initiative) Project is carried to expand infrastructure effectively through participation of private investment. From the year 2005, the range is expanded not only industrial infrastructure such as made road, harbors and so on but living infrastructure such as school facilities, environmental facilities. For this reason BTL(Build-Transfer-Lease) system is mainly used in new private finance initiative project but in existing private finance initiative project BTO(Build-Transfer-Operate) system was used. BTL system is operated to judge fitness of private investment and classified into quantitative VFM(Value for Money) and qualitative VFM. In this research the estimation item of qualitative VFM which is hard to deduce the effect is created and after surveying of questionnaire in target of experts, relative importance and weight is established with AHP(Analytic Hierarchy Process). By estimating efficiency and benefit of quantitative VFM and qualitative VFM aspect effectively it is expected to support a rational making decision for operating BTL.

Effective Models for Connecting BTL and Project Finance (BTL 사업과 프로젝트 금융의 효과적 결합 방안)

  • Park, Won-Seok
    • Journal of the Economic Geographical Society of Korea
    • /
    • v.11 no.2
    • /
    • pp.233-250
    • /
    • 2008
  • This paper aims to analyze the characteristics of BTL, and to propose the effective models connecting BTL and project finance, through the analysis of current state and case study of BTL. The main results of this study are as follows. Firstly, BTL business have been increasing fast, and most of projects are middle size projects below 100 billion Won. Nextly, key suggestions for improving BTL business model are analyzed, which are, first, risk allocation between public and private interests, second, improvement of method for selecting private investment consortium, and third, alleviation of long-term burden of local finance. Finally, effective models for connecting BTL and project finance, which are, first, model for using asset backed securities, second, model for dividing project corporations into construction corporation and operation corporation, and third, model for risk allocation between public and private interests.

  • PDF

A Study For An Improved BTL Project Delivery Method (BTL 사업주체별 문제분석과 해결방안에 관한 연구)

  • Kim, Chang-Duk;Park, Hye-Sin;Lee, Mun-Jae;Yu, Jeong-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.53-63
    • /
    • 2006
  • Since 2005, the government began to introduce and promote a new project delivery system, BTL(Build, Transfer, and Lease), in order to provide high level of public services for the upgraded quality of life and to boost the domestic and local construction economy. However, the lack of experiences in the new system by the constituents from diverse economic sectors brought a number of drawbacks from each constituent's perspective such as improperly low earning rate, excessive expenses for preparation of the project proposal, imbalanced regulations, heavy cost and procedures to establish SPC, the ineffective structure of the consortium, the short-term oriented evaluation criteria for the selection and so forth. These drawbacks turned out to be obstacles for the successful BTL projects. Hence, this paper analyzes the above issues and conducts the interviews with the professionals from the diverse sectors in order to propose the changes to resolve those for the improvement and finally to deliver the successful BTL projects for the diverse public owners.

A Risk Quantification of Public Sector Comparator in the Financial Analysis of the BTL (Build-Transfer-Lease) Scheme of Railway Projects: a Case Study of the Haman-Jinju Link (철도 BTL 민자적격성조사의 위험계량화방안 연구)

  • Jang, Su-Eun;Gang, Ji-Hye
    • Journal of Korean Society of Transportation
    • /
    • v.24 no.5 s.91
    • /
    • pp.67-74
    • /
    • 2006
  • This paper proposes a way to a risk quantification of public sector comparator in the value-for-money test of the BTL (Build-Transfer-Lease) scheme in rail investment projects. Two principal risks that are project delay and budget increasing costs are identified and are empirically quantified with a case study of the Haman-Jinju link. The methodology suggested is expected to be a good reference for the similar research afterwards and also to help in settling down the scheme that is only an early stage.

A Study on development of Assesment System for BTL Project;Prediction of Reasonable Construction and Maintenance Cost in Education Facilities. (합리적 교육시설물 유지보수 및 공사비 예측을 위한 BTL 적격성 평가 시스템 개발에 관한 연구)

  • Son, Jae-Ho;Kim, Jae-On
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.111-116
    • /
    • 2006
  • The objective of this research is to develop an assesment system for BTL Project. A new method for the prediction of construction and maintenance cost in the educational facilities has been considered and under development by the authors. This paper explains the current BTL assesment method used by most local district office of education and lists its potential problems. Main conceptual modules in the new Assesment System are shown in this paper. Also, viable results of each module are discussed in this paper.

  • PDF

A Study on Efficiency of Mixed Model (BTO+BTL) for Public-Private Partnership Projects (민간투자사업 혼합방식(BTO+BTL)의 효율성에 관한 연구)

  • Kim, Do-Il;Jin, Run-Zhi;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.53-63
    • /
    • 2012
  • Korean Public-Private Partnership, mainly implemented using BTO (Build-Transfer-Operate) and BTL (Build-Transfer-Lease) methods, has contributed in increasing benefits of the people by providing the needed public services in a timely and efficient manner. It has also induced flexible national fiscal management. However, in addition to the repeal of the Minimum Revenue Guarantee (MRG) program in 2009, changes in business environment including recent financial crisis aggravated financial situation in pursing PPPs, resulting in significant contraction of BTO projects. Therefore, the new methods are to be suggested and applied to overcome this situation. This paper seeks to find ways to apply "Mixed Model," characterized as the compound of BTO and BTL, two different implementation methods of PPPs, as an enhanced burden-sharing mechanism.