• Title/Summary/Keyword: BTL사업

Search Result 138, Processing Time 0.028 seconds

Development of CM Model for BTL Projects in a Public Educational Facilities (공공교육시설 BTL사업의 CM적용모델 개발)

  • Shin, Nam-Kyoung;Woo, Kwang-Min;Lee, Hak-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.338-341
    • /
    • 2006
  • After the revision of Private Investment Law in January 2005, BTL is introduced to expand the social infrastructures as a major business procedure. Especially, the size of the public educational infrastructure ordered by each city education office is increased by 45% compared to last year, so it is major in BTL Project. However, in the process of practicing BTL Project by now, there are a lot of problems specially in the public educational infrastructure. As a result, this study gives the solutions in the process of BTL Project, the CM models to support the Education Office${\square}{\square}$job and the suggestions for the working scope of the participating construction companies.

  • PDF

Effective Models for Connecting BTL and Project Finance (BTL 사업과 프로젝트 금융의 효과적 결합 방안)

  • Park, Won-Seok
    • Journal of the Economic Geographical Society of Korea
    • /
    • v.11 no.2
    • /
    • pp.233-250
    • /
    • 2008
  • This paper aims to analyze the characteristics of BTL, and to propose the effective models connecting BTL and project finance, through the analysis of current state and case study of BTL. The main results of this study are as follows. Firstly, BTL business have been increasing fast, and most of projects are middle size projects below 100 billion Won. Nextly, key suggestions for improving BTL business model are analyzed, which are, first, risk allocation between public and private interests, second, improvement of method for selecting private investment consortium, and third, alleviation of long-term burden of local finance. Finally, effective models for connecting BTL and project finance, which are, first, model for using asset backed securities, second, model for dividing project corporations into construction corporation and operation corporation, and third, model for risk allocation between public and private interests.

  • PDF

A Case Study of Construction management for OO Cultural Welfare Center, BTL (OO문화복지종합타운 BTL사업 CM수행사례 발표)

  • Ha, Han-ki;Ha, Sin-Jae;Kim, Ki-sung
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.13-18
    • /
    • 2008
  • The BTL and CM are main issues in Korea construction industry lately. The BTL applying CM is sufficient to have interest in terms of combination of BTL and CM. OO Cultural and Welfare Complex Town construction was the first cultural and welfare facility with the BTL applying CM. Because application of CM to the BTL project is at the early stage, there are many problems under the progress such as administration procedure from misunderstanding of the BTL and lack of communication between supporting Dept. and management Dept. This article focuses on those problems and advantages of CM services including negotiation, schedule management and cost management for the better CM service in the BTL project in the future.

  • PDF

Improvement of Concessionaire Designation Evaluation Criteria for Build-Transfer-Lease Private Participation in Infrastructure Projects (BTL사업의 사업시행자 선정 평가기준개선에 관한 연구)

  • Shin, Hyun-In;Park, Tae-Keun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.6
    • /
    • pp.121-131
    • /
    • 2006
  • Since "Act on Private Participation in Infrastructure" were changed in January 2005, BTL(Build-Transfer-Lease) projects of Private Participation In Infrastructure was introduced in the domestic construction market for the purpose of providing public facilities with the public. Selecting the most qualified Promoter should be considered discreetly in BTL projects because BTL projects is for projects with approximately thirty year project life cycle, plan, construction, operating, maintenance and obviously the success of the project totally depends on the capability and role of concessionaire. However, score for cost is likely to influence designating concessionaire to take the project. Accordingly, low bid contract with too much competition could decrease the quality of the construction plan and operating plan. Thus, this study did preliminary research and documents on problems of evaluation criteria for designating concessionaire in BTL projects, and proposed improvement program by doing questionnaire over specialists of each field.

The VFM Analysis on the BTL Projects: Focused on the Case Studies (BTL 사업에 있어서의 VFM 분석에 관한 연구 : 사례연구를 중심으로)

  • Park, Tong-Kyu;Kim, Sun-Kuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.3 s.31
    • /
    • pp.94-101
    • /
    • 2006
  • Since 'Private Investment Act for Social Infrastructure Facilities' were changed in January 2005, BTL projects have been activated in the market. Nevertheless, several problems have been indicated as to the BTL system. Most of these problems are about the choice and scale of the target facilities and the reasonable rate of return allowed to the private investors, which are directly related to the VFM (Value for Money) analysis for the BTL projects. This study discusses the concepts and the methodologies of the VFM analysis, reminds its importance by investigating current problems of the BTL system concerned with the analysis, and suggests useful implications and alternatives through the case studies on the four ongoing BTL projects for the educational facilities.

On Analysis of Undertaking Accomplishment Process for the BTL Project (BTL사업의 사업수행 절차 분석에 관한 연구)

  • Chun, Jin-Ku;Lim, Jong-Ah;Park, Young-Dae
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.917-920
    • /
    • 2007
  • Private companies will get back their investment by leasing facilities to the government, Since act on private participation in infrastructure were changed in January 2005, BTL(Build Transfer Lease) project of introduced in the domestic construction market for the purpose of providing public facilities with the public. BTL projects is for with approximately project life cycle form plan to maintenance the success of the project totally depends on the capability and role of concessionaire. Accordingly, this study is aimed to improve in order to proceed with BTL project efficiently, a clear standard for the item of evaluation was presented.

  • PDF

Promotion of the Private Investments in the Military Facilities through Integration of BTL and BTO Methods (BTL방식과 BTO방식을 혼합한 군시설 민간 투자사업의 활성화 방안의 연구)

  • Kwak, Soo-Nam;Park, Sang-Hyuk;Han, Seung-Heon;Kim, Hyoung-Kwan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.278-283
    • /
    • 2006
  • Koran Government introduced BTL(Build-Transfer-Lease) to provide convenience through early supplying infrastructure and plans to invest 8,315million dollar to 84 projects of 15 BTL type involving official residence and railroad. But some of construction company hates to invest BTL projects because of its low earning rate. In addition if we correctively apply project which partly has profitability to BTL, the earnning rate declines more seriously. So this paper presents BTL+BTO model which operates BTL in the non-profitable parts to improve convenience of users and BTO in the profitable parts to improve earning rate. BTL+BTO model based on operate period was presented and its suitability was confirmed by applting 00 region official residence project.

  • PDF

Analysis of Project Management Firms' Characteristics in BTL Projects (BTL사업 PM사의 특성 분석 연구)

  • Lee, Hyun-Ki;Kim, Han-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.230-233
    • /
    • 2007
  • As a new form of the public procurement method, that is BTL(Build-Transfer-Lease) was introduced in 2005, it has consequently created a new form of emerging business, so called BTL Project Management firms. As a key participant of BTL projects, PM firms play an important role in securing the projects. But due to the short history of BTL, the identity of BTL PM firms has not been widely understood. The objective of this paper is to investigate major characteristics of BLT PM firms for better understanding of the emerging business.

  • PDF

A Value-For-Money Model of BTL Projects for Educational Facilities (교육시설 BTL 사업의 투자가치 평가모형 구축)

  • Kim, Jang-Young;Son, Ki-Young;Kook, Dong-Hoon;Kim, Sun-Kuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.87-91
    • /
    • 2006
  • After reformation of 'the law of private investment on social infrastructure' on January 2005, BTL of educational facilities can improve the education circumstance at early stage, however there are trial and error, problems of execution as well. The key of this problem is not only related to whether BTL project is more reasonable, but it also leads to the proper performance of eligibility analysis on BTL. Therefore, it lead to the proper carryout of eligibility analysis on BTL. In order to promote effective BTL project of educational facilities, this study analyzes problems of existing model and creates the evaluation model for solving this problem. In this study, the evaluation model of investment on BTL has more quick ,accuracy and useful effect than previous one, if it is applied on eligibility stage. Moreover, this method could be applied to public building, SOC facilities effectively based on being modified as each characteristics of structure suitably.

  • PDF

A Sensitivity Analysis for Risk Management of Private Investment Projects - Focused on BTL Projects - (민자유치사업의 리스크 관리를 위한 민감요인 분석 - BTL 사업을 중심으로 -)

  • Kim, Sun-Kuk;Park, Tong-Kyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.1 s.29
    • /
    • pp.168-175
    • /
    • 2006
  • Since the partly changed 'Private Investment Act for Social Infrastructure Projects' set forth in January 2005, the number of BTL(Build-Transfer-Lease) projects offered to the market has rapidly increased. The scope of BTL projects offered covers not only legally defined facilities but several facilities for the private schools. A BTL project, by definition, is a way of project management that includes the entire process of development such as planning, design, construction and operation over the period of 20-30 years. As a result, various types of risk may happen at each stage of the project and it is extremely important to efficiently control the sensitive factors that affect the risk profiles of the project. The examples of the sensitive factors are construction cost, interest rate, discount rate, lease amount, rental fee, O&M cost and so on. This study examines the characteristics of these sensitivity factors, analyzes their impact on the project feasibility and suggests the alternatives to manage them efficiently.