실시설계단계 BIM 기반 도면 작업 효율 향상을 위한 도면화 템플릿 개발 (Developing a Drawing Template for BIM software to Improve BIM-based Drawing Work Efficiency in the Construction Document Phase)

  • 김이제;김인채;진상윤
    • 한국BIM학회 논문집
    • /
    • 제10권4호
    • /
    • pp.98-109
    • /
    • 2020
  • Based on the prior research which developed the consistency review checklist of the BIM model and 2D drawing through the drawing analysis of the construction documents phase, the apparent limits of the existing template and the template development items were derived. As well, the BIM-based drawing templates of the construction documentation phase were developed and verified using ArchiCAD BIM software. The developed template was then applied to the actual project model in the construction documents phase, and, as a result, 50% of existing work elements could be utilized as templates. This is an increase of more than 30% over the existing template utilization elements, and it is analyzed to be effective in practical application and utilization. Based on the results of this study, if the BIM model construction criteria matching the drawing's utilization purpose are presented, while at the same time the BIM data interlocking and drawing template development studies are conducted, the utilization of BIM data can be maximized and additional drawing work can be minimized to increase the percentage of template utilization elements. In addition, it is believed that this can employed to address functional and institutional problems of BIM-based drawing and make a contribution to the activation of BIM.

BIM을 위한 도면 표현 사례에 관한 연구 (A Research on Drawing Representation for BIM(Building Information Modeling))

  • 채갑수;김언용;전한종;이명식;김길채;최종천;유석준
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2008년도 정기 학술대회
    • /
    • pp.470-475
    • /
    • 2008
  • Building Information Modeling(BIM) is rooted in the economic and functional advantages of maturing from paper-based 2D drawings. The paper-based design and construction drawings are typical production from BIM and using the drawing under BIM environment is needed because there is not an alternative media instead of paper-based drawings. However using the 2D drawing process based on 2D CAD for BIM environment directly has difficulties because there are significant differences in data structure between CAD and BIM. CAD is based on traditional drawings as a whole while BIM is focused on individual objects and providing various levels of information associated with the objects. It can be an obstacle to move from 2D CAD to BIM that we don't have a standard or guideline for BIM. Futhermore, the complexity of drawing in representation would be the obstacle too, so the solution is discussed in the research based on the case of Samoo Architects and Engineers.

  • PDF

유전자 알고리즘을 활용한 BIM 도면 주석 간섭 조정 기술 개발 (Development of BIM Drawing Annotation Interference Adjustment Technology Using Genetic Algorithm)

  • 전진규;박재호;김이제;진상윤
    • 한국BIM학회 논문집
    • /
    • 제13권4호
    • /
    • pp.85-95
    • /
    • 2023
  • In the process of creating drawings based on Building Information Modeling (BIM), automatically generated annotations can cause interference issues depending on the drawing type. This study aims to develop an algorithm for repositioning annotations using genetic algorithms to minimize such interferences. To achieve this, the Application Programming Interface (API) of BIM software was used to analyze data extractable from BIM drawing files. The process involved defining drawing data related to annotation repositioning, preprocessing this data, and deriving optimal placement coordinates for the annotations. Furthermore, applying the developed algorithm to the preliminary design drawings of small and medium-sized neighborhood facilities resulted in approximately a 95.37% decrease in annotation interference, indicating that the proposed algorithm can significantly enhance productivity in BIM-based drawing tasks.

BIM 기반 견적업무 효율성 증대를 위한 마감설계자동화 시스템 개발 (A Development of Finish Drawing Automation System for Improving Efficiency on BIM based Estimation)

  • 김성아;강명구;신태홍;진상윤;윤수원;최철호
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2008년도 정기 학술대회
    • /
    • pp.429-434
    • /
    • 2008
  • The objective of this paper is to introduce a project on developing Finish Drawing Automation System. The system aims to improve efficiency of the BIM-based estimation, which is realized by automatic derivation of three-dimensional geometry models of the finish details. First, overall workload differences between the drawing-based estimation methods and the BIM-based methods are analyzed. Second, an automated finish detail design method is proposed as a time-saving measure for the BIM-based estimation, as manual modeling accounts for the most time spent in the model-based estimation process. Finally, the proposed system is evaluated using a case of washboard design.

  • PDF

DEVELOPMENT OF LEGALITY SYSTEM FOR BUILDING ADMINISTRATION PERMISSION SERVICE BASED ON BIM

  • Inhan Kim;Jungsik Choi
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.593-600
    • /
    • 2009
  • In Korea, the government has developed SEUMTER, an administration system for building related public service, to facilitate and promote the electronic submission and permission activities. SEUMTER is progressing legality system based on 2D drawing for building administration permission service. However, there are a lot of problems related to legality system owing to complexity of Korea regulation relation and structure, inefficiency of legality system based on 2D drawing, duplication examination of document (soliciting forms for civil affairs) and drawing. Therefore, the purpose of this study is to develop legality system for building administration permission service based on BIM in Korea. To achieve this purpose, the authors have investigated permission procedure and regulation structure that is used in current building administration permission and suggested permission procedure and regulation structure for legality system based on BIM. In addition, the authors have investigated element technologies (for examples, method of structured regulation, BIM model checker, Viewer, etc) for legality system based on BIM. Finally, the authors have suggested strategy and hereafter direction for application of legality system based on BIM.

  • PDF

2D 건축도면기반 BIM 엘리먼트 생성 모델 (Generation Model for BIM Elements based on Architectural Drawings)

  • 배창준;박상헌;조동현;구교진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.68-69
    • /
    • 2018
  • The construction drawing is a collection of knowledge that has accumulated knowledge and experience of designers and is highly valuable for recycling in the future. BIM is a process and technology that acquires and manages the information needed for the whole life cycle of a building. In order to recycle digitalized 2D drawings in BIM Tool, it is required to use 3D information based on the drawing information to save and reuse them, but there is little research on related methods or system development. In this study, 3D elements are created based on 2D drawing information, and libraries are constructed, and BIM Tool is used to improve the recyclability of drawing information.

  • PDF

BIM 모델을 활용한 2D 전자도면 대체 가능성 분석 -도로분야 전자납품체계를 대상으로- (Analysis of Substitutability of 2D Electronic Drawing Using the BIM Model -Focusing on the Electronic Delivery System in Road Field-)

  • 서명배;주기범;김남곤
    • 한국콘텐츠학회논문지
    • /
    • 제13권11호
    • /
    • pp.441-450
    • /
    • 2013
  • 최근 토목분야 BIM(Building Information Modeling) 발주가 늘어남에 따라 발주처에서는 BIM 기반 성과품을 납품받고 있으나 관련지침 등이 미흡하고 작성방법, 수준, 성과품 목록 등이 구체적이지 않아 기존 2D기반의 성과품과 혼용해서 납품받고 있다. 이는 설계사나 시공사의 업무가중으로 연결될 수 있으며 관리해야 할 자료가 많아져 발주처에서도 부담으로 작용한다. 이러한 부담을 줄이기 위해서는 기존 2D 기반의 전자납품체계가 BIM발주체계로 전환될 경우 BIM모델에서 추출하여 활용하거나 대체가 가능한 2D기반의 성과품들을 조사하여 중복된 성과품을 최소화하는 작업이 필요하다. 이에, 본 연구에서는 국토교통부의 실시설계가 완료된 도로공사를 대상으로 BIM 모델링을 수행하였으며 이를 근간으로 총 3,767개 도면항목에 대해 2D도면 추출 가능여부를 검토하였다. 그 결과 67%인 2,549개의 도면항목이 BIM모델에서 2D도면으로 추출이 가능한 것으로 분석되었으며 특히 연결종합, 토공, 부대공 등과 관련된 도면항목들의 대체효과가 큰 것으로 조사되었다. 본 연구는 향후 BIM 관련 성과품 납품체계 개발시 2D 도면을 줄이거나 대체할 수 있는 근거자료로 활용될 수 있을 것이다.

BIM Model 기반 철근 수량산출 시 고려사항 (Considerations When Quantity Take-Off of Rebar Based on the BIM Model)

  • 정서희;김주용;김광희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.73-74
    • /
    • 2023
  • The purpose of this study is to derive the cause of the quantity difference and present the considerations when take-off rebar quantity based on BIM model by comparing the quantity of rebar based on BIM model with 2D drawing. This research was limited to take-off the quantity of rebars in the building frame work, and after take-off the quantity of rebars by 3D modeling the 2D drawing of the target building with Revit, the quantity difference was compared with 2D-based software. Therefore, when take-off the quantity of rebars based on the BIM model, instead of take-off the existing 2D-based quantity premium proportion, according to general structural consider development length, lap splice length, covering thickness, reinforcing bars and spacing. In the future, this study is expected to contribute to improving the accuracy of BIM-based frame construction quantity take-off.

  • PDF

3D BIM 기반 철골 제작도면 산출 생산성 분석 (A Study on the Productivity Analysis of 3D BIM-based Fabrication Documents Extraction)

  • 함남혁;양정혜;여옥경
    • 한국BIM학회 논문집
    • /
    • 제9권3호
    • /
    • pp.30-40
    • /
    • 2019
  • Extraction of fabrication documents is very important because it provides information related to tasks of fabrication and construction. Therefore, in the case of a prefabricated member such as a steel structure, it is necessary to improve the productivity of fabrication documents through 3D BIM. However, research and evidence data on direct comparison analysis of 3D BIM-based documents extraction versus 2D CAD-based documents extraction are hard to find. Thus, this study focuses on productivity analysis of 3D BIM based fabrication documents extraction. In this study, the productivity data of fabrication documents extraction for module construction of EPC project was analyzed. For the productivity analysis, a case study on the fabrication documents of Module A (1,965 sheets) and Module B (1,216 sheets) was conducted. Fabrication documents for each module include general arrangement drawing, assembly drawing, single part drawing and single plate drawing. Comparison of 2D CAD based fabrication documents extraction and 3D BIM based fabrication documents extraction, the productivity for the entire work was improved from 17 hours to 16 hours for Module A and 12 hours to 7 hours for Module B. Especially, the productivity of the assembly drawings, which occupies a large part of the fabrication documents, was improved by about 48.75% from the total time required from 281 hours to 144 hours.

How to automatically extract 2D deliverables from BIM?

  • Kim, Yije;Chin, Sangyoon
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.1253-1253
    • /
    • 2022
  • Although the construction industry is changing from a 2D-based to a 3D BIM-based management process, 2D drawings are still used as standards for permits and construction. For this reason, 2D deliverables extracted from 3D BIM are one of the essential achievements of BIM projects. However, due to technical and institutional problems that exist in practice, the process of extracting 2D deliverables from BIM requires additional work beyond generating 3D BIM models. In addition, the consistency of data between 3D BIM models and 2D deliverables is low, which is a major factor hindering work productivity in practice. To solve this problem, it is necessary to build BIM data that meets information requirements (IRs) for extracting 2D deliverables to minimize the amount of work of users and maximize the utilization of BIM data. However, despite this, the additional work that occurs in the BIM process for drawing creation is still a burden on BIM users. To solve this problem, the purpose of this study is to increase the productivity of the BIM process by automating the process of extracting 2D deliverables from BIM and securing data consistency between the BIM model and 2D deliverables. For this, an expert interview was conducted, and the requirements for automation of the process of extracting 2D deliverables from BIM were analyzed. Based on the requirements, the types of drawings and drawing expression elements that require automation of drawing generation in the design development stage were derived. Finally, the method for developing automation technology targeting elements that require automation was classified and analyzed, and the process for automatically extracting BIM-based 2D deliverables through templates and rule-based automation modules were derived. At this time, the automation module was developed as an add-on to Revit software, a representative BIM authoring tool, and 120 rule-based automation rulesets, and the combinations of these rulesets were used to automatically generate 2D deliverables from BIM. Through this, it was possible to automatically create about 80% of drawing expression elements, and it was possible to simplify the user's work process compared to the existing work. Through the automation process proposed in this study, it is expected that the productivity of extracting 2D deliverables from BIM will increase, thereby increasing the practical value of BIM utilization.