• 제목/요약/키워드: BIM Manager

검색결과 27건 처리시간 0.021초

Profession and strategy of BIM managers in Japan

  • Kaneta, Takashi
    • 국제학술발표논문집
    • /
    • The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
    • /
    • pp.167-175
    • /
    • 2017
  • Building Information Modeling (BIM) comes to be implemented into architectural design, construction, and maintenance in Japan in order to convert design information thoughout a construction project. However, various problems are taking place in data transaction. It is not also clear about the role and the responsibility of the architects and the enginners in charge.There is a movement to establish a BIM manager as a general coordinator concerning BIM in Singapore and other countries, though it is not yet popular in Japan. This paper deals a BIM manager as a new profession in a construction project. The function and skills necessary to a BIM manager is analyzed, and the strategy of Japanese general contractors is discussed. General contractors from Japan are operating BIM in Singapore compatible with open system of supply chain. This style is different from the one in Japan even they belong to the same company. In this paper it is analyzed based on the survey in detail.

  • PDF

A Development of Unified and Consistent BIM Database for Integrated Use of BIM-based Quantities, Process, and Construction Costs in Civil Engineering

  • Lee, Jae-Hong;Lee, Sung-Woo;Kim, Tae-Young
    • 한국컴퓨터정보학회논문지
    • /
    • 제24권2호
    • /
    • pp.127-137
    • /
    • 2019
  • In this study, we have developed a calculation system for BIM-based quantities, 4D process, and 5D construction costs, by integrating object shape attributes and the standard classification system which consist of Cost Breakdown System(CBS), Object Breakdown System(OBS) and Work Breakdown System(WBS) in order to use for the 4 dimensional process control of roads and rivers. First, a new BIM library database connected with the BIM library shape objects was built according to the CBS/OBS/WBS standard classification system of the civil engineering field, and a integrated database system of BIM-based quantities, process(4D), and construction costs(5D) for roads and rivers was constructed. Nextly, the process classification system and the cost classification system were automatically disassembled to the BIM objects consisting of the Revit-family style elements. Finally, we added functions for automatically generating four dimensional activities and generating a automatic cost statement according to the combination of WBS and CBS classification system The ultimate goal of this study was to extend the integrated quantities, process(4D), and construction costs(5D) system for new roads and rivers, enabling the integrated use of process(4D) and construction costs(5D) in the design and construction stage, based on the tasks described above.

BIM기반 건축적산 매뉴얼 개발을 위한 만족도 분석에 관한 연구 (Study on the Satisfaction Analysis for Development of Construction Estimating Manager based on 3D Data)

  • 최창훈;이준복;한충희;소지윤
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 추계 학술논문 발표대회
    • /
    • pp.222-223
    • /
    • 2014
  • According to the improvement of IT technology, an enhanced efficiency of management system in the construction industry is expected since a quotation system with BIM (Building Information Modeling) technique effectively estimates construction materials. For an enhanced efficiency of management system, related guidelines, standards, and manuals based on BIM are required, but the lack of this information causes difficulty to utilize in practice. In the paper, the satisfaction analysis was performed in order to promote the completeness of construction estimating manager that can be presented criteria and details of BIM-based quantity-takeoff, classification criteria.

  • PDF

BIM 건설정보 상호운용성 개선에 관한 연구 (A Study on the Improvement of Interoperability Construction Process)

  • 오정근;하란
    • 한국BIM학회 논문집
    • /
    • 제4권2호
    • /
    • pp.10-16
    • /
    • 2014
  • Interoperability in the BIM construction information is the information management technology, which allows user to control and effectively use construction's lots of information that occur and disappear through construction life cycle. And it is information interchange through accurate and rapid decision-making to get the participants' wanted value. In this study, we will present plan to improve productivity and quality through effective BIM operation. And we will present improvement plan after deduce existing process's problem.

유지보수공사 프로세스기반 BIM-문서 넥서스 구축 (Development of Nexus for BIM and Documents based on Maintenance Process)

  • 한지호;박상헌;윤선재;구교진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.168-169
    • /
    • 2021
  • Maintenance is carried out over a long period of time, and various documents are utilized in the maintenance work. In maintenance work which is progressed simultaneously in a short period of time, it is important to provide relevant information to the parties in a timely manner. As the types of work increase, manager needs more time and effort to select and utilize the documents. It is necessary to have an information system that supports the person in charge by grasping work procedures for each construction and providing the necessary documents and information for that step. This paper proposes an process based nexus model that can provide necessary documents to the parties to the work steps by linking the maintenance work process and BIM. Through the nexus model presented, manager can efficiently acquire the necessary documents and utilize them for the construction works currently being carried out.

  • PDF

A Case Study on Assessing the Productivity of a BIM team in a Construction Company

  • Huang, Chien-Hsun;Hsieh, Shang-Hsien
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.259-262
    • /
    • 2015
  • Due to the labor-intensiveness, high investment cost, long execution time, frequent change orders, and many stakeholders in a BIM project, a BIM manager is bound to face a lot of risks to make decisions in cost managing process. Since the productivity of a BIM team will affect the execution cost, this study investigates a simple method of assessing the productivity of a BIM team using the working timesheet records of the team. In this research, the productivity of a BIM team is defined as the effective working floor area (in square meters) of BIM uses per labor-time (in man-months) spent by the team. After the applicability of this method is tested by regression analysis using data from 5 real BIM projects in the construction phase, it is found that the simple productivity definition adopted in the method, although easy-to-implement, does not produce a statistically constant productivity value. More research is therefore needed in the future to devise better indicator(s) for assessing the productivity of a BIM team.

  • PDF

재고모형과 BIM 데이터를 활용한 건설현장의 적정 재고 관리방안에 대한 연구 (The Research on the Managing Method for Reasonable Amount of Inventory in Construction Site Using Inventory Model and BIM Data.)

  • 김반석;박병주;박정로;김주형;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.119-120
    • /
    • 2012
  • The management for materials and inventory is one of the factors which are considered the most for profits of a business in almost all industrial fields. Resource procurement which occupies more than 40% of an overall construction cost has a strong relationship with profits of a business but it is regarded as a work for a manager rather than for a technician. It makes the importance of resource procurement relatively low and slows down the development of workings. As the construction project becomes more larger and complicated, effective management for materials are directly affecting the profits of a business. Therefore, this research works on finding an economical managing method for materials according to a characteristic of construction project based on accurately forecasted BIM data. Finding a reorder point by using BIM data which contains an accurate data for schedule and material enables a better management for materials and provides more accurate data on matters which were used to be determined by an intuition of a manager.

  • PDF

CM(ConstructionManagement)에의 효율적 BIM활용에 관한 연구 (A Study on the good use of Construction Management Model based on BIM)

  • 민영기;김경준
    • 한국디지털건축인테리어학회논문집
    • /
    • 제10권3호
    • /
    • pp.87-95
    • /
    • 2010
  • The CM(Construction Manager) of D-university has been seeking the advice of my BIM-team to adopt CM(Construction Management) and BIM best practices to improve project delivery results, and has authored best practice reports for spatial validation, BIM, 3D, 4D and 5D performance. Building Information Modeling(BIM) Process, Integration, and Adoption looks at BIM implementation from a company and project level laying out a process for companies to use BIM. Following this studies, participants will be able to: 1. BIM participants has been creating a BIM process diagram for a project, and has been evaluating and selecting process options for a specific BIM project. 2. BIM participants has been describing the roles and responsibilities of participants in the BIM process, and has been communicating the BIM process to management, colleagues, and project stakeholders. 3. BIM participants has been identified consistent factors influencing BIM return on investment at the project level and the company level, and has been outlining a process for BIM adoption on the project level and company level.

능동형 BIM 체계에 의한 토목 및 건축분야 BIM 활용성 개선 연구 (Usability Improvement of BIM for Construction Projects Using Active BIM Functions)

  • 강인석;문현석;김현승;곽중민
    • 한국건설관리학회논문집
    • /
    • 제14권5호
    • /
    • pp.74-83
    • /
    • 2013
  • 현재 활용되고 있는 대부분의 BIM체계는 설계 및 시공단계의 작업 현상에 대한 시각적 정보제공에 초점을 두고 있는 수동형 BIM (Passive BIM) 운영체계이다. 수동형 BIM체계에서는 설계성과품의 간섭발생 부위를 3D객체에 의해 시각적으로 파악할 수 있으나, 추가적으로 간섭 상황의 해결방안을 제시하는 것은 곤란하다. 또한 시공단계 4D시뮬레이션도 일정별 시공형태의 표현은 가능하나, 프로젝트 공정조건을 고려한 최적화된 일정계획의 제시 등은 미흡한 수준이다. 그러나 최근 다양한 기관에서 BIM을 적용하면서 사용자의 BIM 요구수준은 이미 시각적 정보제공을 넘어서, 파악된 문제 현상의 해결방안까지 BIM으로 표현할 수 있는 능동형 BIM (Active BIM) 기능들을 요구하고 있다. 본 연구에서는 능동형 BIM의 개념적용을 위해 시공단계의 대표적 BIM 도구인 4D CAD시스템을 예로 하여 능동형 기능 구성방법론을 제시하고 독자적 개발엔진으로 시스템 구현을 시도하였다.

건설현장 굴착작업을 위한 토공 BIM 프로토타입 개발 (Development of a Prototype for an Earthwork BIM Environment)

  • 문성우;손지홍;홍순헌
    • 대한토목학회논문집
    • /
    • 제35권3호
    • /
    • pp.707-714
    • /
    • 2015
  • 현재 정부에서는 설계기술발전을 위해서 BIM을 적극적으로 장려하고 있다. BIM 환경에서 건설관리자는 시각적인 정보뿐만 아니라 비용과 시간을 접목시켜서 건설공사의 진행사항과 이와 관련된 비용집행현황과 공정 스케줄을 검토할 수 있다. 그러나 BIM은 건물, 교량 등 고정된 구조물 설계와 시공에 대부분 적용되고 있는 것이 현실이다. BIM은 그 기능을 확장시켜서 고정된 구조물뿐만 아니라 환경변화가 지속적으로 발생되는 토공작업에도 적용할 수 있다. 본 논문에서는 BIM 기법을 토공현장에 적용시키기 위한 프로토타입 개발과 적용을 연구목적으로 한다. 토공 BIM 프로토타입은 굴삭기와 같은 건설장비와 연동하여 변화되는 지형에 대한 3차원적 데이터를 제공하여 토공작업의 현황정보를 제공한다. 본 연구과정에서는 BIM을 동적인 토공작업에 적용하기 위해서 필요한 속성정보를 찾고, 이를 바탕으로 토공 BIM의 사용자 화면을 제시한다.