A Study on the BIM based architectural design process for APT. competition (공동주택 현상설계의 BIM 프로세스 적용 방안에 관한 연구)

  • Lee, Kwang-Soo;Min, Young-Gi;Kim, Myoung-Keun;Koh, In-Lyong
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.11 no.3
    • /
    • pp.89-97
    • /
    • 2011
  • Accelerating economic growth since the 1960s, penetration rate of the House of Commons has been increased. However, design competition has been imposed for improve of the qualitative level in modern because it was quantitative increasing. Even though its design quality is improved by introducing design competition, distorting the design is increased for the purpose of election. For that reason, errors of information and design changes are increased. So BIM(Building Information Modeling) is adopted to solve the problems. In this study, BIM process on the basis of the existing design process was to clean up and LoI(Level Of Information) based on the level of information was newly defined. Working-level of the design competition is plan-basic design. LOI level is LOI1-LOI2 in plan and Lol3-LOI4 in basic design. At each step of the operation was to clean up the level of detail and content. Also exchange of data in each area and feedback about content are to clean up.

Interoperability Verification using BIM Case Models of Road Project (도로 프로젝트의 BIM 사례모델 구축을 통한 호환성 검증)

  • Moon, Hyoun-Seok;Kim, Chang-Yoon;Cho, Guen-Ha;Moon, Jin-Seok;Ju, Ki-Bum
    • Journal of KIBIM
    • /
    • v.5 no.1
    • /
    • pp.44-53
    • /
    • 2015
  • Recently, BIM has been widely applying in civil engineering projects centering on the private construction industry in order to establish self guidelines for spreading in practice. However, most BIM technologies and software are based on the architectural projects. In these environments, it is not easy to apply the BIM to a infrastructure field. Even BIM standards with IFC (Industry Foundation Classes) are also focusing on architectural projects. Especially, both private and public sectors do not know about how BIM delivery system should be performed, and how such deliverable should be submitted to the government yet. Thus, we need to analyze an application level of BIM S/W (Software) in real projects and verify their interoperability. Besides, since there are not any common standards that can exchange IFC models for civil engineering projects, we have many issues in converting as-built infrastructure models into IFC and delivering their design documents to the government. Accordingly, this study aims to perform a BIM process with commercial software for real road project after a detailed design process is finished and verify interoperability between diverse BIM software for securing BIM data reliability.

BIM and Thermographic Sensing: Reflecting the As-is Building Condition in Energy Analysis

  • Ham, Youngjib;Golparvar-Fard, Mani
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.4
    • /
    • pp.16-22
    • /
    • 2015
  • This paper presents an automated computer vision-based system to update BIM data by leveraging multi-modal visual data collected from existing buildings under inspection. Currently, visual inspections are conducted for building envelopes or mechanical systems, and auditors analyze energy-related contextual information to examine if their performance is maintained as expected by the design. By translating 3D surface thermal profiles into energy performance metrics such as actual R-values at point-level and by mapping such properties to the associated BIM elements using XML Document Object Model (DOM), the proposed method shortens the energy performance modeling gap between the architectural information in the as-designed BIM and the as-is building condition, which improve the reliability of building energy analysis. Several case studies were conducted to experimentally evaluate their impact on BIM-based energy analysis to calculate energy load. The experimental results on existing buildings show that (1) the point-level thermography-based thermal resistance measurement can be automatically matched with the associated BIM elements; and (2) their corresponding thermal properties are automatically updated in gbXML schema. This paper provides practitioners with insight to uncover the fundamentals of how multi-modal visual data can be used to improve the accuracy of building energy modeling for retrofit analysis. Open research challenges and lessons learned from real-world case studies are discussed in detail.

Updating BIM: Reflecting Thermographic Sensing in BIM-based Building Energy Analysis

  • Ham, Youngjib;Golparvar-Fard, Mani
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.532-536
    • /
    • 2015
  • This paper presents an automated computer vision-based system to update BIM data by leveraging multi-modal visual data collected from existing buildings under inspection. Currently, visual inspections are conducted for building envelopes or mechanical systems, and auditors analyze energy-related contextual information to examine if their performance is maintained as expected by the design. By translating 3D surface thermal profiles into energy performance metrics such as actual R-values at point-level and by mapping such properties to the associated BIM elements using XML Document Object Model (DOM), the proposed method shortens the energy performance modeling gap between the architectural information in the as-designed BIM and the as-is building condition, which improve the reliability of building energy analysis. The experimental results on existing buildings show that (1) the point-level thermography-based thermal resistance measurement can be automatically matched with the associated BIM elements; and (2) their corresponding thermal properties are automatically updated in gbXML schema. This paper provides practitioners with insight to uncover the fundamentals of how multi-modal visual data can be used to improve the accuracy of building energy modeling for retrofit analysis. Open research challenges and lessons learned from real-world case studies are discussed in detail.

  • PDF

A Study of BIM level of design process information for floating public facilities (BIM기반 플로팅 공공시설 설계단계별 정보설정에 관한 연구)

  • Jun, Ki Hyung;Jung, Won Jo;Hong, Soon Yeon;Kim, Jung Gil
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2013.10a
    • /
    • pp.295-296
    • /
    • 2013
  • 플로팅건축은 기존 육상의 건축과 달리 다양한 주체와 복잡한 협업이 이루어지므로, 분야별, 단계별 협업에서 프로젝트 참여자들간의 긴밀한 의사소통이 요구되어 진다. 효율적인 정보관리를 위해 국내 외에서 이용되고 있는 BIM(Building Information Modeling)을 활용하면 플로팅건축 프로젝트의 효율적인 진행을 가능하게 한다. 설계프로세스별 정보수준에(LOI) 관한 기준을 정의함으로써 BIM기반 통합설계프로세스 진행시 단계별 적합한 정보를 제공하도록 하였다.

  • PDF

Performance Analysis of BIM Labor using Case Analysis (사례분석을 활용한 시공단계 BIM 인력 투입 성과 분석)

  • Kim, Hyoung-Jin;Yoo, Moo-Young;Kim, Jae-Jun;Choi, Chang-Shik
    • Journal of KIBIM
    • /
    • v.7 no.3
    • /
    • pp.31-39
    • /
    • 2017
  • BIM is effective to improve the labor productivity of construction participants. From this point of view, it is important to analyze the outcome related with BIM Labor which covers most of the BIM investment costs. This research focuses on BIM RFI which is one of the major task of the BIM labor and analyze the outcomes. In addition, this research was quantitatively analyzed by the standby time and related cost caused by BIM labor, which affect the results of the project participants. To this end, analytical standby queue model was utilized to analyze the labor focusing on micros TASK. 11 projects were selected to analyze the results of BIM labor and RFI that the project participants requested to the BIM labor was collected. Through this, it collected variables for analyzing results, and Finally, we pulled out 4 projects for analysis. In this study, the basic results analysis of RFI processing of the BIM labor, the probabilistic analysis of BIM labor service status, and the economic analysis of BIM labor optimal inputs were performed by using the research model presented. The results of this study can be utilized to formulate the optimal strategy for BIM labor inputs(e.g. number of employees, level, time point, etc.) of the construction phase. Moreover, it can contribute to ensuring the credibility of the BIM ROI results by presenting the cost of BIM services in BIM ROI analysis and the standby cost of project participants.

The Current Status and Facilitation Strategy of BIM for Civil Infrastructure Projects (토목공사의 BIM 현황 및 활성화에 관한 연구)

  • Park, Tae-Soon;Park, Hee-Sung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.1
    • /
    • pp.133-140
    • /
    • 2018
  • The purpose of this paper is to provide baseline on the current status and the activation of BIM in civil engineering which can integrate and manage the information and tasks generated during the life cycle. Hierarchical analysis was conducted to identify the level of BIM application, recognition survey for practitioners, and activation plans. The survey results show similar trends in BIM activation inhibition factor, the need for BIM, the effect of BIM and the future possibility of BIM. The utilization of BIM and the technical training in the civil engineering field were lower than those in the architectural field. The analysis of AHP(Analytic Hierarchy Process) is performed to identify the degree of importance in financial, operational, investment, technical, and institutional sections as its activating factors. As a result, the technical factor points the highest degree. Thus, study shows the direction to apply BIM in civil engineering in the future by suggesting an efficient plan.

Empirical Evaluation of BIM Coordinator Performance using Queuing Model in Construction Phase (대기행렬 모형을 활용한 시공단계 BIM 코디네이터 업무 성과 분석)

  • Ham, Nam-Hyuk;Yuh, Ok-Kyung;Ji, Kyu-Hyun
    • Journal of KIBIM
    • /
    • v.8 no.3
    • /
    • pp.31-42
    • /
    • 2018
  • This study focuses on the BIM request for information(RFI) processing performance and quantitatively analyzes the performance of the BIM coordinator and the loss due to the waiting of the project participants. For these purposes, a method to quantitatively evaluate the performance of the BIM coordinator was proposed using a queueing model. For the verification, two projects in which BIM was applied in the construction phase were selected, and the BIM RFI data were collected through the analysis of the BIM monthly report and BIM coordinator work log of each project. In addition, the BIM input personnel, labor cost, and productivity data were collected through interviews with the experts of the case projects. The analysis of the BIM RFI processing performance of the BIM coordinator using the queueing model exhibited on a probabilistic basis that the waiting status of the project participants could vary depending on the preliminary BIM application to the design verification as well as the input number and level of the BIM coordinator personnel. In addition, the loss cost due to the waiting of the project participants was analyzed using the number of BIM RFIs waiting to be processed in the queueing system. Finally, the economic feasibility analysis for the optimal BIM coordinator input was performed considering the loss cost. The results of this study can be used to make decisions about the optimal BIM coordinator input and can provide grounds for the BIM return on investment (ROI) analysis considering the waiting cost of the project participants.

Development and Application of a BIM Library Placement Automation Model (BIM 라이브러리 자동 배치 모형 개발 및 사례 검증)

  • Hyeon-Seung Kim;Hyoun-Seok Moon;Leen-Seok Kang
    • Land and Housing Review
    • /
    • v.15 no.1
    • /
    • pp.157-165
    • /
    • 2024
  • As major public owner agencies in Korea have improved the application level of BIM, many design and construction companies are paying more attention to ways to improve actual work productivity in the BIM execution process. In this study, we introduce a method to automate the placement of BIM libraries, a recurring task in the BIM-based design process that serves as a prime example of BIM design automation methodologies. In particular, we classify the target surfaces for placement of BIM libraries into straight lines, curves, vertical planes, and surfaces. For each target surface, we implement a BIM library automatic placement model in Dynamo, considering the spacing and alignment according to the distance between the centers of two objects and the linear length. The results of case studies confirm that the proposed method can be employed according to various placement environments and conditions with the working time shortened. The study proposes that various objects and structures that need to be placed according to the terrain characteristics can be placed accurately, and work productivity can be significantly improved through the automation of placement.

Optimization of BIM based Space Plan by Expert System (전문가시스템을 활용한 BIM기반 건축공간 면적계획 최적화 방안)

  • Kwon, Ocheol;Cho, Joowon
    • Korean Journal of Computational Design and Engineering
    • /
    • v.21 no.2
    • /
    • pp.99-110
    • /
    • 2016
  • The quality of building space program is a key to measure how the building performance satisfies its owner and users. However assuring its efficiency requires reliable criteria that reflect high level experience knowledge in the field. This study suggests a plan to gauge the level of building space performance using expert knowledge, which has not been utilized well enough but should play a critical role. In order to setup an expert system measuring level of the space program, we firstly optimized the space areas to the best case in a knowledgebase and use them as criteria to judge the quality of the spaces extracted from BIM model. We found the experimental results show us a promising way of measuring a relative quality of the space programs.