A basic study 3D model advancement method for nuclear power plant (원자력 발전설비의 3D 모델 상세화 방안에 대한 기초 연구)

  • Lim, Byung-Ki
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.37-38
    • /
    • 2018
  • BIM(Building Information Modeling) in the architecture, VDC(Virtual Design and Construction) defined CIFE(Center for Integrated Facility Engineering) of Stanford university in USA, and Data-driven design definition issued by TECDOC-1284 of IAEA are doing data-level design generated by 3D CAD technology, integrating and managing related information based on the 3D model, and Using 3D models effectively during nuclear power plant life cycle. 3D model of domestic nuclear power industry is using interference review between design fields, 4D system linked 3D construction model and schedule activity, but the 3D model generated in the design phase is effectively not utilized during the construction, operation, decommissioning. therefore, This study is aimed to suggest 3D model LOD(Level of Detail) advancement method through the analysis of existing literature, 2D drawings, and 3D models throughout nuclear power plant lifecycle.

  • PDF

The Development Method of IFC Extension Elements using Work Breakdown Structure in River Fields (작업분류체계를 활용한 하천분야 IFC 확장 개발방안)

  • Won, Jisun;Shin, Jaeyoung;Moon, Hyoun-Seok;Ju, Ki-Beom
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.4
    • /
    • pp.77-84
    • /
    • 2018
  • As the application of BIM (Building Information Modeling) to the civil sector has become practical, and mandatory for road projects, the standardization, development of systems, etc. for the application and operation of BIM are required. In particular, it is important to develop BIM data standards for producing, sharing and managing the lifecycle data of civil facilities because they are commonly national public facilities. The BIM data standards have been developed by utilizing or extending IFC (Industry Foundation Classes), which is an international standard, but schema extensions of river facilities has not been developed thus far. This study proposes an approach to an IFC extension for river facilities using the WBS (Work Breakdown Structure) as a fundamental study for IFC-based schema extension in the river field. For this purpose, the research was carried out as follows. First, the IFC extension development method was selected to represent the river facilities by analyzing the existing IFC structure and previous research cases for the IFC extension. Second, extended elements of the river facilities were identified through an analysis of the WBS and classified according to the high-level structure of the IFC schema. Third, the classified elements were arranged based on the IFC hierarchy and the IFC schema extension for river facilities was established. Based on the suggested extension method of IFC schema, this study developed the schema by defining the element components and parts of river facilities, such as distribution flow elements and deriving their detailed types and properties.

BIM-Based Simulator for Rebar Placement

  • Park, U-Yeol
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.1
    • /
    • pp.98-107
    • /
    • 2012
  • Reinforcing bars (rebar) comprise an integral part of a concrete structure, and play a major role in the safety and durability of the building. However, the actual placement or installation of rebar is not planned and controlled by the detailer. Recently, 4D simulations, using 3D model and scheduling software, have been used to improve the efficiency of the construction phrase. However, 4D simulators have not been introduced at the detailed level of work, such as rebar placement. Therefore, this paper suggests a BIM-based simulator for rebar placement to determine the sequence with which rebar is placed into the form. The system using Autodesk Revit API automatically generates rebar placement plans for a building structure, and labels the placement sequence of each individual bar or set of bars with ascending numbers. The placement sequence is then visualized using Autodesk Revit Structure 2012. This paper provides a short description of a field assessment and limits.

A HAZARDOUS AREA IDENTIFICATION MODEL USING AUTOMATED DATA COLLECTION (ADC) BASED ON BUILDING INFORMATION MODELLING (BIM)

  • Hyunsoo Kim;Hyun-Soo Lee;Moonseo Park;Sungjoo Hwang
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.17-22
    • /
    • 2011
  • A considerable number of construction disasters occur on pathways. Safety management is usually performed on construction sites to prevent accidents in activity areas. This means that the safety management level of hazards on pathways is relatively minimized. Many researchers have noted that hazard identification is fundamental to safety management. Thus, algorithms for helping safety managers to identify hazardous areas are developed using automated data collection technology. These algorithms primarily search for potential hazardous areas by comparing workers' location logs based on a real-time location system and optimal routes based on BIM. Potential hazardous areas are filtered by identified hazardous areas and activity areas. After that, safety managers are provided with information about potential hazardous areas and can establish proper safety countermeasures. This can help to improve safety on construction sites.

  • PDF

A STUDY ON DURATION ESTIMATE METHOD USING STOCHASTIC MODEL IN THE BIM ENVIRONMENT

  • Jae H. Park;Seok H. Yun;Joon H. Paek
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1209-1215
    • /
    • 2009
  • Recently, Construction Projects are being much bigger and more complex. So the importance of Construction Planning and Management is increasing and increasing because of the Construction Projects is involved in a variety of construction-related subjects. Competitive of the Construction Industry decided Cost, Construction Duration and Productivity. But they were just focused on Cost Saving instead of Construction Duration and Productivity. However, they have to finish construction projects using minimum cost and duration with quality and function of required level for successful Construction projects. Thus, current high exchange rate and high period, it is clear to decrease construction cost and to do economic construction in huge Construction Projects and it means more advanced Construction Schedule Management needs for economic construction. But Construction Scheduling Planning, basic of Construction Schedule Management, adjusted contract period without Pre-Planning, just depending on experience and ability of Construction Engineer. Because of that, this study suggests new Duration Estimate Method using Stochastic Model in BIM Environment for advanced Construction Schedule Management. Existing Duration Estimate Methods are just modified wrong points of them or analyzed effective factors of construction schedule. However, New Duration Estimate Method is just consists of Stochastic Model and BIM Environment without existing Duration Estimate Methods. So, new method has creativity and specialty. After this research, it would be a great model in construction industry field.

  • PDF

What is a Critical Factor for Determining the Issue-Resolving Time in the BIM-based Coordination Process?

  • Jang, Sejun;Lee, Dongmin;Lee, Ghang
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.392-395
    • /
    • 2015
  • This study analyzes critical factors that affect issues of resolving time in BIM-based coordination using a case study. According to recent buildings that are meant to be more complex, BIM-based design coordination is regarded as an essential stage of the project delivery process. In the design coordination phase, a relocation of architectural, structural, mechanical, and electrical elements is conducted to avoid interference. In addition, the procedure of the development of each element in detail for the actual construction is carried out. Delays in coordination can affect delays in the entire delivery schedule of the project, and therefore many researches have focused on efficient coordination methods and how to shorten the period. In this study, we conducted a detailed analysis of the issue-resolving process using a case study, and found out that the participation of decision-makers for issue-resolving and the physical combination of trades affect delays in coordination time. In particular, we proposed the concept of organizational relation, indicating the level of decision-makers for issue-resolving, and the concept of physical relation, indicating the physical complexity of the issue, and we analyzed the effects of coordination delays.

  • PDF

Object Classification List for BIM-based Maintenance Information Modeling in Electrical and Telecommunications Field of Architecture (BIM 기반 유지관리정보 모델링을 위한 객체분류목록 개발 -건축 전기/정보통신 분야를 중심으로-)

  • Song, Jong-Kwan;Cho, Gen-Ha;Won, Ji-Sun;Ju, Ki-Beom;Bea, Si-Hwa
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.5
    • /
    • pp.3183-3191
    • /
    • 2014
  • It is essential to effectively manage facilities because operating and maintenance cost for them accounts for more than 83% of lifecycle cost. This study developed BIM Object-based classification list to manage information required to operating and maintenance phase of them from design and construction phase. In order to develop this classification list, Construction Information Classification System, Design Criteria for Architectural Electrical Installations, commodity list classification of PPS(Public Procurement Service) were analyzed. and problems for consisting of object classification list were drawn. And each materials is classified that drawings discipline code (KSF 1540:2010 (Principle and criteria for CAD Drawing) was classified as level 1 to cover main areas and construction information classification system was classified as level 2 to cover elements also UNSPSC was classified as level 3 to cover objects for devices and equipments. this classification criteria was given code. This study is expected to be useful to exchange and share information in operating and maintenance phase by offering object point of view classification in design and construction phase. besides, it is looking forward to effective operating and maintenance of facilities by enabling management of devices and equipments by function, space, use.

Facilitated Oxygen Transport through a Polyethersulfone Membrane Containing Cobalt Tetraphenylporphyrin-Benzylimidazole (Cobalt Tetraphenylporphyrin-benzylimidazole을 포함한 산소 촉진수송막)

  • Lee, Seung Hwan;Park, Se Hyung;Park, Jung Hoon
    • Membrane Journal
    • /
    • v.28 no.6
    • /
    • pp.424-431
    • /
    • 2018
  • The gas separation performance of a mixed membrane structure based on a mixture of polyethersulfone (PES) and cobalt tetraphenylporphyrin-benzylimidazole (CoTpp-BIm) as an oxygen carrier was investigated. The CoTpp-BIm mixed PES membrane had an asymmetric structure with a mixture of finger structure and sponge-like structure, and the upper surface was dense. The gas separation performance test was carried out using $94%\;N_2$ gas and $6%\;O_2$ mixed gas. Oxygen and nitrogen permeability coefficients were measured at ${\Delta}P$ ranging from 15 to 228 cmHg and the permeate side of the PES membrane was maintained at vacuum level. The oxygen permeability coefficient of CoTpp-BIm mixed PES membranes increased as supplied pressure was decreased. When the supply pressure was 15 cmHg, the gas permeability ($P_{O_2}$) was 6676 Barrer, the $O_2/N_2$ selectivity (${\alpha}$) was 6.1, and the promoting factor (F) was 2.39. Based on these results, it was confirmed that the addition of CoTpp-BIm to the PES film improved the oxygen separation characteristics.

A Comparison of the Cognitive Effect of Three-dimensional Images on a Computer Monitor and a Mixed Reality Device (컴퓨터 모니터와 혼합현실기기의 3차원 이미지 인지 효과 비교 연구)

  • Choi, Sung-Jin;Liu, Shu-Jun
    • Journal of KIBIM
    • /
    • v.13 no.4
    • /
    • pp.45-53
    • /
    • 2023
  • The educational benefits and potential of XR as a new medium are well recognized. However, there are still limitations in understanding the specific effects of XR compared to the more widely utilized representation of images on computer monitors. This study therefore aims to demonstrate the differences in effectiveness between the two technologies and to draw implications from a cognitive comparison of three-dimensional objects represented on a flat surface and virtually. The study was conducted a quantitative research method with an experiment involving two independent groups, and the results were tested using regression analysis. The results showed that for low-level, two-dimensional objects, the computer monitor method may be more effective, but above a certain level of complexity, the effectiveness of learning through the monitor tends to decrease rapidly. On the other hand, the group that used extended reality technology showed relatively high comprehension compared to the monitor group even as the complexity increased, and in particular, unlike the monitor group's rapidly decreasing comprehension level, the extended reality technology group showed a trend of decreasing comprehension with the level of complexity, suggesting the potential for compatibility and predictability in the use of technology.

Hazardous Area Identification Model using Automated Data Collection(ADC) based on BIM (BIM기반 자동화 데이터 수집기술을 활용한 위험지역 식별 모델)

  • Kim, Hyun-Soo;Lee, Hyun-Soo;Park, Moon-Seo;Lee, Kwang-Pyo;Pyeon, Jae-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.6
    • /
    • pp.14-23
    • /
    • 2010
  • A considerable number of construction disasters occurs on pathway. A safety management in construction sites is usually performed to prevent accidents in activity areas. This means that safety management level of hazards on pathway is relatively minified. Many researchers have introduced that a hazard identification is fundamental of safety management. Thus, algorithms for helping safety managers' hazardous area identification is developed using automated data collection technology. These algorithms primarily search potential hazardous area by comparing workers' location logs based on real-time locating system and optimal routes based on BIM. And potential hazardous areas is filtered by identified hazardous areas and activity areas. After that, safety managers are provided with information about potential hazardous areas and can establish proper safety countermeasures. This can help improving safety in construction sites.