• Title/Summary/Keyword: BIM Guideline

Search Result 49, Processing Time 0.025 seconds

An Analytical Appraisal of Building Information Modelling (BIM) Guidelines to Identify Variations in the Procedures

  • Das, Dakshata;Moon, Sungkon
    • Journal of KIBIM
    • /
    • v.6 no.3
    • /
    • pp.1-14
    • /
    • 2016
  • The usage of Building Information Modelling (BIM) in building projects has enabled improvement in project planning, implementation and collaboration process amongst various stakeholders within architecture, engineering and construction (AEC) industry. However, variations exist in the current practices of BIM implementation and coordination process in the industry. These variations result in inconsistent degree of BIM use across the construction industry. This inconsistency gives rise to several managerial and technological challenges such as data interoperability issues and purposeful integration and exchange of information within the BIM components. In order to tackle the issue, it is essential to analyse the different BIM approaches employed by the industry practitioners. BIM guidelines serve as a critical link between the BIM model, and its subsequent execution. They therefore provide the best reflection of BIM application and processes. This research paper aims to address the variations existing in BIM practices across the construction industry. It includes an extensive study of 21 existing, publicly available BIM-based guidelines in order to establish an understanding of the present state of practice and deduce issues and concerns related to them. All guidelines analysed in this paper are first categorised based on authorship and the release date for efficient comparison. The points of similarity and difference between them are thereby realized and outlined. In addition, the transition of project implementation process from traditional methods to BIM technology is also explained. The existence of inconsistencies in the BIM guidelines reviewed in this paper reflects the need of a BIM 'Code Compliance Check'. The Code Compliance Check will serve as a regulatory project guideline that will further improve the potential of BIM by incorporating a consistent BIM modelling methodology for the entire construction industry.

CONNECTING TECHNOLOGY, INDUSTRY AND RESEARCH: A VERTICAL INTEGRAL PROJECT COURSE FOR BIM EDUCATION OPPORTUNITIES

  • F. H. (Bud) Griffis;Mei Liu;Andrew Bates
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.252-259
    • /
    • 2013
  • Building Information Modeling (BIM) is utilizing CAD technology in a way that ultimately ties all the components of a building together as objects imbedded with information, and has been changing the way we design and build over the last 20-30 years. In Polytechnic Institute of NYU, there are four BIM courses offered which provide students with different levels of knowledge regarding BIM Technique, BIM Standards, BIM Guideline and Roadmap for Private and Public Implementation, BIM Application in Real Projects, the Cooperation of BIM and IPD for Public Works in New York City. With advanced BIM technology, BIM's integration into the construction process and its incorporation into project delivery systems, especially Integrated Project Delivery (IPD) are the bridges between technology, industry and research. This paper presents an integrated BIM curriculum with three modules: 1) BIM functions and Bid Preparation; 2) Time-Cost Trade-off Analysis; and 3) Problems Solving in BIM/IPD Environment. In this project-based curriculum developed by the common efforts of academia, public agency and industry, the objectives are: (1) to provide the information and skills needed to successfully implement BIM into the construction phase; (2) to identify BIM's role in construction and the project delivery system; (3) to develop a module in conjunction with leading BIM into project delivery system, particularly coordination between BIM and IPD; (4) to connect technology and research into industry. The course assessment was conducted and the results indicate that it is a successful reform in construction management education.

  • PDF

Data analysis for facility maintenance based on BIM - Case studies of facility maintenance based on BIM and practical process - (BIM 기반 시설물 유지관리를 위한 데이터 정의 - BIM기반 시설물관리 사례와 프로세스 분석 -)

  • Kim, Do Young
    • Journal of KIBIM
    • /
    • v.10 no.3
    • /
    • pp.1-11
    • /
    • 2020
  • The introduction of BIM technology is expanding not only in the field of design and construction, but also in the maintenance and use stage. In particular, researchers are looking to build a smart facility management system that integrates advanced IT technology and BIM. This study proposes the parts to be used and added to the BIM information, focusing on information generated and exchanged in the application case that is an issue during the current facility maintenance work by introducing the smart facility management technology and its use cases. The effectiveness of this proposal is compared with the scenario in which BIM-based facility safety management is applied and the current business scenario. In conclusion, the requirements for smart facility management are analyzed, and linkable parts between facility management tasks and BIM data that should be reflected in the facility management system are presented. In the maintenance phase, through the use case scenario, the facility management phase is subdivided according to the characteristics and contents of the work. In addition, information about the facilities required for each task is specified. Furthermore, it is examined whether BIM data and IT information can be linked with existing facility management systems. It is a process and guideline that can be provided to practitioners who want to introduce BIM and smart technology to facility management. It can define the required data items and levels according to the required information step by step based on the maintenance case.

BIM-modeling Guideline for Quantity Estimation of NATM Tunnel Construction (NATM 터널 물량산출을 위한 BIM 모델링 가이드라인)

  • Shin, Jaecheol;Baek, Yeongin;Eom, Byeongho
    • 한국방재학회:학술대회논문집
    • /
    • 2011.02a
    • /
    • pp.73-73
    • /
    • 2011
  • 현재의 NATM터널에 대한 물량은 설계도면을 기반으로 산출되는데, 이러한 방법은 수작업에 많이 의존하게 되므로 실수로 인한 물량의 오류와 사람의 능력에 따른 물량의 차이가 나타나게 된다. 본 연구는 BIM기반의 모델에서 자동적으로 물량을 산출하여 물량산출의 오류나 차이점을 바로잡고 설계변경에 따른 물량산출작업을 효율적으로 수행하려는 프로젝트에 필요한 BIM 모델링을 통한 물량산출 프로세스의 가이드라인을 제시한다. 또한, 여러 BIM 프로그램들은 각각의 모델링 및 물량산출 방식을 가지고 있어서 하나의 프로세스로 통합하기 어려운 문제가 있기 때문에 본 연구에서는 Autodesk사의 Revit Structure에 적합한 작업 프로세스에 대한 가이드라인을 제시하며 NATM 터널의 전체 구간이 아닌 본선구간만을 대상으로 한다. 본 연구는 전체적인 NATM 터널의 BIM기반 물량산출 모델링 프로세스를 BIM 모델링과 BIM 물량산출로 분리하였다. BIM 모델링 프로세스는 물량산출의 대상과 범위 설정, 모델링을 위한 CAD도면 작성, 패밀리 파일의 설정, 공종별 모델링 작업으로 구성된다. 물량산출의 대상과 범위 설정 단계에서는 NATM 터널의 CAD 파일과 수량 산출서를 분석하여 물량산출을 위한 공종별 물량산출 범위를 확정하고, 도면에 표시되지 않는 물량정보를 파악하여 물량 값을 정확하게 산출할 수 있도록 하며, 모델링을 위한 CAD도면 작성 단계에서는 Revit Structure 특성을 고려하여 모델링에 참조하는 CAD 도면을 Revit Structure에서의 모델링에 적합하게 편집해야한다. 그리고 패밀리 파일의 설정과 공종별 모델링 작업 단계에서는 CAD도면과 Revit Structure의 패밀리 파일과의 단위를 일치시키고 NATM 터널의 특성에 맞게 공종별 모델링을 실시한다. BIM 물량산출 프로세스는 모델링 데이터의 분할, 패밀리의 재구성, 물량산출로 구성된다. 모델링 데이터의 분할단계에서는 물량산출의 목적에 맞게 CAD에서 기준선을 작성하여 공종별 모델링이 작성된 패밀리 파일로 불러온 다음 모델을 분할해야한다. 그리고 패밀리의 재구성과 물량산출단계에서는 분할된 공종별 모델의 패밀리 파일을 프로젝트 파일로 불러온 다음 물량산출의 목적에 맞게 재배치하여 물량을 산출한다.

  • PDF

A Basic Study for Accumulation of IFC-based Schedule Information (IFC 기반의 공정정보 축적을 위한 기초연구)

  • Song, Jong-Kwan;Choi, Won-Sik;Won, Ji-Sun;Kim, Nam-Gon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.11
    • /
    • pp.5890-5896
    • /
    • 2013
  • This Study aimed at suggesting the plan for accumulating and utilizing schedule information of IFC file in BIM-based delivery system. For this Propose, First, literature review is conducted for analyzing utilization plan of schedule information and the IFC standard. Second, Schedule Planning process is analyzed to draw Schedule elements, and schedule information items is derived by analyzing schedule process and commercial software. Also, schedule elements in the IFC schema is derived by analyzing IFC schema through drawn schedule information. Finally, this study suggests a concept model accumulating and utilizing Schedule information included in IFC schema, and a conceptual delivery process of BIM model by analyzing BIM Application Guideline for Facility Project by PPS (Public Procurement Service) for accumulating IFC delivery files This study will expects to contribute to accumulate information of BIM model at the point of nationally introducing BIM.

A Study on the Accuracy of BIM-based Quantity Take-Off of Apartment Interior (BIM기반 공동주택 마감 물량 산출 정확도 연구)

  • Lee, Moon-Kyu;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.12-22
    • /
    • 2013
  • Construction industry throughout the construction projects life cycle using BIM is able to manage information. Among them, BIM-based quantity take-off is directly connected to the data of the construction business as an important management element that is essential for one of the management factors of feasibility study and economic analysis. In addition, the result of BIM-based quantity take-off can be varied depending on modeler, so the exact guideline for BIM modeling is necessary. The BIM-based quantity take-off in terms of reliability and accuracy of the information is very important. Therefore, this study verified the BIM modeling of the apartment interior materials using both separate object and composite object was validated the quantitative comparison of the difference in BIM-based quantity take-off for accuracy & reliability judgment of BIM-based quantity take-off and realistic & desirable suggestion of BIM modeling way. As the result of this study, it is preferable to model various interior materials to use separate object for the purpose of correct BIM-based quantity take-off, but the realistic way of the BIM modeling using both separate object and composite object jointly was verified in order to judge BIM-based quantity take-off in terms of work productivity.

Development of Energy Optimized Geometry Using BIM for Super Tall Office Building in Early Design Stages (BIM을 이용한 건축물 초기 디자인 단계에서 초고층 업무용 건물의 최적 에너지 형태개발)

  • Ryu, Han-Soo;Kim, In-Han;Choo, Seung-Yeon
    • Korean Journal of Computational Design and Engineering
    • /
    • v.16 no.2
    • /
    • pp.83-91
    • /
    • 2011
  • There are many researches to make low-energy building. Lots of them focus on facility systems and insulation performance of building materials. However, not only systematic solutions but also approaches in early design stages are important to reduce energy consumption. Using BIM(Building Information Modelling) is considered as an effective and efficient way to simulate building energy and decide alternatives than traditional energy simulation because BIM based energy simulation makes to reduce much time for energy modeling. This study focuses on development of optimized geometry for super tall office buildings in Seoul, Korea. Specifically, length to width ratio and building orientation are main topics of this study because these two topics are the most basic and preceding factors deciding mass design. In this study, Revit MEP 2011 and Ecotect Analysis 2011 are used to make case models and calculate energy load in early design stages. Energy properties of material abide by Korean Standards for Energy Conservation in Building, Korean Guideline for Energy Conservation in Public Office and ASHRAE Standard in USA. This study presents best length to width ratio of plan and optimized orientation by evaluating the case models. Furthermore, this study suggests what should be considered for each case to decrease energy load.

A Basic Study on Data Structure and Process of Point Cloud based on Terrestrial LiDAR for Guideline of Reverse Engineering of Architectural MEP (건축 MEP 역설계 지침을 위한 라이다 기반 포인트 클라우드 데이터 자료 구조 및 프로세스 기초 연구)

  • Kim, Ji-Eun;Park, Sang-Chul;Kang, Tae-Wook
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.8
    • /
    • pp.5695-5706
    • /
    • 2015
  • Recently adoption of BIM technology for building renovation and remodeling has been increased in construction industry. However most buildings have trouble in 2D drawing-based BIM modeling, because 2D drawings have not been updated real situations continually. Applying reverse engineering, this study analysed the point cloud data structure and the process for guideline of reverse engineering of architectural MEP, and deducted the relating considerations. To active usage of 3D scanning technique in domestic, the objective of this study is to analyze the point cloud data processing from real site with terrestrial LiDAR and the process from data gathering to data acquisition.

A Study on the Feasibility of COBie to the Wastewater Treatment Plant (COBie 기반 하수처리시설 유지관리시스템 구축)

  • Choi, Jae-Ho;Um, Dong-Yong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.1
    • /
    • pp.273-283
    • /
    • 2014
  • With the introduction of COBie (Construction Operation Building Exchange) in BIM technology enabling an automatic transfer of design and construction information to operation and management (O&M) phase, the BIM centric O&M management system development process has been tested on the subject of architectural types of building. However, for now, there is a need to investigate the technical feasibility of COBie application to civil structures including industrial facilities. This study takes both "O&M Guideline for Public Wastewater Treatment Plant" and a real wastewater treatment plant into account for the purpose, in which the latter is intended to supplement the result of the first. The findings are three-folds: (1) COBie, as an asset modeling, is not sufficient enough to encompass commissioning data, (2) more relevant IFC development and family library build-up useful to modeling wastewater treatment plant is imperative, and (3) well-planned coordination and organization of COBie data-set in line with O&M practice will enhance the feasibility of the COBie in industrial facilities. The result could be used for a basis study for COBie application, particularly in industrial facilities.

A Case Study for 3D Architectural Design Guideline (3차원 설계 지침 개발을 위한 사례 연구)

  • Kim, Eon-Yong;Jun, Han-Jong;Lee, Myung-Sik;Kim, Khil-Chae
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.182-187
    • /
    • 2007
  • A case study is a beforehand research to develope 3D architectural design guide line for building and construction. For this case study, the research investigates several cases around world such as Building Information Modeling Guide Series of U.S. GSA(General Service Administration), BIM/IFC User Guide of IAI Germany, IDM(Information Delivery Manual) of IAI Norway, CORENet of Singapore the Ministry of National Development with Building and Construction Authority, and Helsinki University of Technology Auditorium Hall 600(HUT-600) of IAI Finland. The common thing of each case is using IFC for sharing information and interoperability in the life cycle of building. Through the case study, it shows the way how the 3D architectural design guide adapted in Korean situation.

  • PDF