• Title/Summary/Keyword: BIM Design Verification

Search Result 25, Processing Time 0.024 seconds

An Estimation Model of Historical Cost Using BIM Library for Road Project (도로분야 BIM 라이브러리를 활용한 실적공사비 산정모델 구축)

  • Moon, HyounSeok;Ju, KiBeom
    • Korean Journal of Computational Design and Engineering
    • /
    • v.20 no.4
    • /
    • pp.431-442
    • /
    • 2015
  • Currently, a BIM-based quantity takeoff (QTO) system is mainly focused on architectural projects. To perform this, diverse quantity takeoff methods such as an object-based automatic quantity takeoff, manual quantity and base functions of calculation have widely been utilizing. However, since BIM library for road projects includes structural elements associated with alignment, it is necessary to establish cost estimation system interlocked with historical cost using 3D library by each unit length. Accordingly, the aim of this study is to develop cost estimation model with using a historical cost approach so that it can be utilized in construction planning based on the BIM library for road projects. For this, based on the BIM library for road, the standardized quantity is estimated, and a process for calculating historical cost and a verification model with a 5D simulation was developed by mapping a WBS code with each BIM library object. This can be applied during the approximate cost estimation process in a project planning and an initial design phase for road projects. Besides, it is expected that these results will be utilized in constructing an optimal historical cost estimation process for project libraries.

Design of Browser for The Harbor BIM Service Based on Cloud Computing (클라우드 컴퓨팅 기반 항만 BIM 서비스를 위한 브라우저 설계)

  • Chang, Jae-Yeol;Moon, Hyoun-Seok
    • Journal of KIBIM
    • /
    • v.8 no.4
    • /
    • pp.60-71
    • /
    • 2018
  • The port BIM technology has many problems such as lack of relevant system, high cost of BIM infrastructure construction, and process difference of existing domestic inter-industry. Since the port facilities as national key industries are managed and operated by public organizations, it is necessary to integrate IT resources and have a system that needs collective construction and joint utilization management. In this paper, we proposed the convergence of cloud computing technology and BIM as a way to reduce the infrastructure cost required for port BIM operation and to provide various BIM services for domestic process. To do this, we collected system requirements based on demand surveys of port staff and designed a BIM browser that provides IFC-based BIM server and customized services to reduce infrastructure cost in cloud computing environment. In terms of infrastructure, we designed cloud-based IaaS to support cost reduction, which is an essential component, and designed SaaS to support customized services in terms of services. We will perform performance verification with focus on whether port BIM servers and browsers have reached a level where they can manage four BIM models with different types and capacities.

Extension of the IFC Schema for Road Subsidiary Facility (도로 부대시설 수용을 위한 IFC 스키마 확장 개발)

  • Cho, Geun-Ha;Ju, Ki-Beom
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.12
    • /
    • pp.7385-7392
    • /
    • 2014
  • Extension IFC schema of subsidiary facilities were developed for the purpose of establishing an information model standard for roads. The IFC entities, types and properties for subsidiary facilities were defined through an analysis of the road design documents for the extraction physical component and design information. The converter and viewer for applying the new schema were then developed. Subsidiary facilities BIM models were converted to new IFC models to verify the research results. Standard BIM-based delivery and verification systems are enabled by using a standard model converted by new schema. Furthermore, it can establish an open BIM environment using an IFC over the entire life cycle of the civil engineering project.

Development of a BIM-based Carbon Dioxide Emission Estimation System -Focus on an Apartment in Korea-

  • Lee, Yong-Ju;Jun, Han-Jong
    • Architectural research
    • /
    • v.18 no.4
    • /
    • pp.145-149
    • /
    • 2016
  • Recently, a goal was set globally to reduce the Carbon Dioxide ($CO_2$) emission at national levels by 30 % in comparison to the Business As Usual (BAU) pursuant to the United Nations Framework Convention on Climate Change. As construction industry accounts for as high as 40 % of the $CO_2$ emission by the entire industrial sector in Korea, efforts toward reducing emissions from the construction industry are essential. Buildings are mainly responsible for $CO_2$ emissions, and, to reduce the $CO_2$ emitted from the buildings, a fast and accurate calculation method is required to be introduced in the architectural design phase. If the standardized data based on Building Information Modelling (BIM) is utilized, $CO_2$ emissions can be calculated quickly and accurately during the design phase. However, it is difficult for the designers who lack the knowledge regarding $CO_2$ emissions to reduce and manage such emission during the planning and design phases of buildings by estimating the quantities of various materials and the corresponding $CO_2$ emissions. Accordingly, the objective of this study is to develop a BIM-based $CO_2$ emission estimation system for a rapid and objective analysis and verification of $CO_2$ emissions.

A Study on DEM-based Automatic Calculation of Earthwork Volume for BIM Application

  • Cho, Sun Il;Lim, Jae Hyoung;Lim, Soo Bong;Yun, Hee Cheon
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.38 no.2
    • /
    • pp.131-140
    • /
    • 2020
  • Recently the importance of BIM (Building Information Modeling) that enables 3D location-based design and construction work is being highlighted around the world. In Korea, the road map has been established to settle the design based on BIM using drone survey results by 2025. As the first step, BIM would be applied to road construction projects worth more than 50 billion Korean Won from 2020. On the other hand, drone survey regulation has been enacted and the data for drone survey cost were also included on Standard of construction estimate in 2020. However, more careful improvement is required to reflect drone survey results in BIM design and construction. Currently, Engineering instructions and Standard of construction estimate specifies that earthwork volume must be calculated by cross section method only. So it is required to add the method of DEM (Digital Elevation Model) based volume calculation on these regulations to realize BIM application. In order for that, this study verified the method of DEM based earthwork volume calculation. To get an accurate DEM for accurate volume computation, drone survey was carried out according to the drone survey regulation and then could get an accurate DEM data which have errors less than 3cm in X, Y and 6.8cm in H. As each DEM cell has 3D coordinate component, the volume of each cell can be calculated by obtaining the height of area of the cell then total volume is calculated by multiplying total number of cells by volume of each cell for the construction area. Verification for the new calculation method compare with existing method was carried out. The difference between DEM based volume by drone survey and cross section based volume by traditional survey was less than 1.33% and it can be seen that new DEM method will be able to be applied to BIM design and construction instead of cross section method.

Development of IFC Converter Prototype for Applying BIM in the Road Field (도로분야 BIM 적용을 위한 IFC 변환기 프로토타입 시스템 개발)

  • Seo, MyoungBae;Ju, KiBeom
    • Korean Journal of Computational Design and Engineering
    • /
    • v.19 no.4
    • /
    • pp.347-355
    • /
    • 2014
  • IFC converters and viewers, applicable in the construction field, are being actively developed while, in the civil engineering field, IFC schemata are being developed. To prove the IFC schema grammatically, the existing ISO 10303 30s' pre-processors and post-processors may be used. However, to visually prove the IFC model, the existing commercial 3D modeling software should be converted into the IFC schema of civil engineering field, and a viewer is needed to view it. Thus, this study developed a IFC converter and viewer prototype system to apply BIM in the road field. To express the road line, LandXML was analyzed, and IFC suitable for expressing shapes in the road field was designed. Also, an IFC suitable for bridges with focus on representative bridge structures such as abuts, piers and decks was designed. Further, a converter was developed using AutoCAD's Civil3D and Revit's 3rdp party tools, and software was also developed designed to combine each converted IFC model into one IFC. In addition, a viewer designed to view IFC in the road field was developed to prove the converted IFC. Eight major verification and examination items were selected and used in testing the converted model, and it was confirmed that the viewer normally viewed the IFC schema in the road field. The proposed IFC converter is expected to be used as a visual IFC verification tool in the road field.

A Proposal for Partial Automation Preparation System of BIM-based Energy Conservation Plan - Case Study on Automation Process Using BIM Software and Excel VBA - (BIM기반 에너지절약계획서 건축부문 부분자동화 작성 시스템 제안 - BIM 소프트웨어와 EXCEL VBA를 이용한 자동화과정을 중심으로 -)

  • Ryu, Jea-Ho;Hwang, Jong-Min;Kim, Sol-Yee;Seo, Hwa-Yeong;Lee, Ji-Hyun
    • Journal of KIBIM
    • /
    • v.12 no.2
    • /
    • pp.49-59
    • /
    • 2022
  • The main idea of this study is to propose a BIM-based automation system drawing up a report of energy conservation plan in the architecture division. In order to obtain a building permit, an energy conservation plan must be prepared for buildings with a total floor area of 500m2 or more under the current law. Currently, it is adopted as a general method to complete a report by obtaining data and drawings necessary for an energy conservation plan through manual work and input them directly into the verification system. This method takes a lot of effort and time in the design phase which ultimately increases the initial cost of the business, including the services of companies specialized in the environmental field. However, in preparation for mandatory BIM work process in the future, it is necessary to introduce BIM-based automatic creation system that has an advantage for shortening the whole process to enable rapid permission of energy-saving designs for buildings. There may be many methods of automation, but this study introduces how to build an application using Dynamo of Revit, in terms of utilizing BIM, and write an energy conservation plan by automatic completion of report through Dynamo and Excel's VBA algorithm, which can save time and cost in preparing the report of energy conservation plan compared with the manual process. Also we have insisted that the digital transformation of architectural process is a necessary for an efficient use of our automation system in the current energy conservation plan workflow.

A Study on the Design Change History Management for BIM-based Architecture-Structure Collaboration (BIM 기반 건축-구조분야 협업을 위한 설계변경 이력관리 방안 연구)

  • Park, kyoung Jun;Ock, Jong Ho
    • Korea Science and Art Forum
    • /
    • v.37 no.3
    • /
    • pp.135-145
    • /
    • 2019
  • IFC(Industry Foundation Classes) is used for information exchange in BIM-based collaboration process, and it does not secure reliability of information exchange results between fields due to structural limitations. In the end, it is a realistic problem that we have to use specialized BIM software by field, and we can not secure smooth interoperability in the process of information exchange and change. This study was conducted to find ways to secure the interoperability of BIM work between architecture and structure fields by utilizing Open Source provided by software developers to solve these problems. First, through expert survey and in-depth interview, information and improvement factors required in the process of collaboration between architecture and structure were derived. Second, in order to find a solution to the improvement factors, existing studies related to Open-API and domestic and overseas APIs were investigated and analyzed. Third, Ad-On was developed to secure interoperability by using Open API, mainly BIM S/W, which is mainly used in each field. As a result of the study, the possibility of securing interoperability through the management of the design change history between fields was confirmed by using API. It is judged that the application range of API will be expanded to the construction and maintenance field in the future. Therefore, in order to increase the usability for application diffusion, further research on interface improvement through user-centered verification is needed.

Establishment of Integrated Design Bases Management System of APR1400 Using BIM based Algorithm (BIM기반 Algorithm을 활용한 APR1400 설계기준 통합관리 체계 구축)

  • Shin, Jaeseop;Choi, Jaepil
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.5
    • /
    • pp.52-60
    • /
    • 2019
  • The APR1400 is a 1400MWe nuclear power plant developed through national technology development project over a period about 10years. Approximately 65,000 design drawings are produced for APR1400 construction. In order to maintain consistency among numerous drawings, the highest level of design bases drawings (DBDs) are created according to design bases and this is used in the subsequent design. However, DBDs are produced and managed on a document basis and they are managed various field, it was difficult to accurately reflect the design bases information in the subsequent design. Therefore, this study recognizes limitations of the document based DBDs and develops a system that can accurately reflect the design bases information to subsequent design by adopting BIM based design bases integrated information system. Especially, by introducing DBIL(Design Bases Information Layer) concept, DBIL was created and analyzed based on five design bases(Physical protection, Fire protection, Internal missile protection, Internal flood protection, Radiation protection) applied to APR1400. In the final result DBIL set and Datasheet are integrated of room, design bases information, building data(wall, slab, door, window, penetrations). So it can be used for subsequent design automation and design verification. Furthermore, it is expected that APR1400 DBILs data can be used extensively in constructability and design economics analysis through comparison with next generation nuclear power plant.

A Study on the Design of the Slip-Form System for the Construction of Tapered Concrete Pylons (변단면 콘크리트 주탑공사의 슬립폼 시스템 적용을 위한 설계기술 연구)

  • Yoon, Hyejin;Kim, Young Jin;Chin, Won Jong;Kim, Hee Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.3
    • /
    • pp.128-135
    • /
    • 2014
  • This paper studied design of slip form system considering the erection of a pylon mock-up. The height of the pylon is 10 m. A rectangular hollow cross-section was considered. The outer and inner dimensions of the pylons were varied with respect to the height. The thickness of 1 sides among the 4 faces were varied. Accordingly the slip form was designed to respond to continuous changes in its dimensions and thickness. Structural analysis was conducted to examine structural safety of the slip form. Virtual construction by BIM proved its practicality. The developed design technologies were successfully applied to the erection of a 10m high pylon executed for field verification test.