• 제목/요약/키워드: BIM Design Verification

검색결과 25건 처리시간 0.023초

우선순위 규칙을 적용한 BIM 기반 설계검증 성과 분석 (BIM-based Design Verification Performance Analysis with Priority Rules Applied)

  • 허승하;심재형;함남혁;김재준
    • 한국BIM학회 논문집
    • /
    • 제11권3호
    • /
    • pp.1-11
    • /
    • 2021
  • BIM is one of the means of reducing the economic loss caused by design errors. These features of BIM have led to increased use of BIM. With the increasing use of BIM, several studies have been conducted to analyze the performance of BIM. As the importance of BIM staff is emphasized in the performance analysis of BIM, the human resource allocation of BIM staff can become an important research issue. However, there are few studies to measure the workforce effectiveness of BIM staff. Ham et al (2020) measured BIM workforce efficiency using FCFS queue model rules. Since design errors can have different effects on the project depending on the type, there are design errors that must be dealt with first. Therefore, in this study, a priority queue was used to solve design errors with high priority first. The performance of BIM-based design verification was analyzed by quantitatively analyzing the performance of BIM staff when the priority rule was applied to the design error processing sequence.

활용성을 고려한 BIM 설계 오류 검증시스템 개발 (Development of an Verification System for Enhancing BIM Design Base on Usability)

  • 양동석
    • 토지주택연구
    • /
    • 제8권1호
    • /
    • pp.23-29
    • /
    • 2017
  • The BIM design is expected to expand to the domestic and overseas construction industries, depending on the effect of construction productivity and quality improvement. However, with the obligation of Public Procurement Service to design the BIM design, it includes a design error and the problem of utilization of 3D design by choosing a simple 2D to 3D remodelling method that can not be modelled in 3D modeling or use of the construction and maintenance phases. The results reviewed by BIM design results were largely underutilized and were not even performed with the verification of the error. In order to resolve this, one must develop the check system that secures the quality of BIM design and ensure that the reliability of BIM results are available. In this study, it is designed to develop a program that can automatically verify the design of the BIM design results such as violation of the rules of the BIM design, design flaws, and improve the usability of the BIM design. In particular, this programs were developed not only to identify programmes that were not commercially available, but also to validate drawings in low-light computer environments. The developed program(LH-BIM) store the information of attribute extracted from the Revit file(ArchiCAD, IFC file included) in the integrated DB. This provides the ability to freely lookup the features and properties of drawings delivered exclusively by the LH-BIM Program without using the Revit tools. By doing so, it was possible to resolve the difficulties of using traditional commercial programs and to ensure that they operate only with traditional PC performance. Further, the results of the various BIM software can be readily validated, which can be solved the conversion process error of IFC in the case of SMC. Additionally, the developed program has the ability to automatically check the error and design criteria of the drawings, as well as the ability to calculate the area estimation. These functions allow businesses to apply simple and easy tasks to operate tasks of BIM modelling. The developed system(LH-BIM) carried out a verification test by reviewing the review of the BIM Design model of the Korea Land & Housing Corporation. It is hoped that the verification system will not only be able to achieve the Quality of BIM design, but also contribute to the expansion of BIM and future construction BIM.

BIM 기반 협업에서의 상호운용성 향상을 위한 설계정보의 확장방안에 대한 기초적 연구 (A Basic Study on the Extension of Design Information to Improve Interoperability in BIM-based Collaborative Design Process)

  • 정재환;김진만;김성아
    • 한국BIM학회 논문집
    • /
    • 제5권1호
    • /
    • pp.25-34
    • /
    • 2015
  • In the initial step of BIM based architectural design process, workloads are increased and the decision making process becomes more complex than those of the conventional design process. Technologies regarding distribution, exchange, classification, verification of BIM data are fundamental elements of construct environment for information sharing based on BIM. Interoperability of BIM model data is another issue to integrate BIM model. To improve interoperability in BIM-based collaboration, a model for utilizing formal&unformal design informations is suggested. Futhermore, Prototyping the model and practical test is conducted for advancement of data exchange making design data richen.

계획설계 단계에서의 개방형 BIM 기반 초고층건축물 수직동선 계획 및 검증모듈 개발 (Open BIM-based Vertical Circulation Planning and Verifying Modules for Super-Tall Building at the Schematic Design Phase)

  • 김인한;조근하;최중식;천의영
    • 한국CDE학회논문집
    • /
    • 제16권2호
    • /
    • pp.156-164
    • /
    • 2011
  • The automation technology is able to enhance the business process more rapidly and effective. Open BIM technology which supports automation technology of building overcomes the limitations of two dimensions drawings system. The purpose of this study is on the development of open BIM based modules for creating and verifying the core model for super-tall building in the schematic design phase. The module is expected to create cases of core models automatically and it is expected to verify the requirement of building model. This module is anticipated to utilize for creating the core model rapidly in order to create the alternative plan and to make the model accurate by its verification.

A STUDY ON THE CONSTRUCTION OF BIM DATA INTEROPERABILITY FOR ENERGY PERFORMANCE ASSESSMENT BASED ON BIM

  • Jungsik Choi;Hyunjae Yoo;Inhan Kim
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.267-273
    • /
    • 2013
  • Early design phase energy modeling is used to provide the design team with first order of magnitude feedback about the impact of various building configurations. For better energy-conscious and sustainable building design and operation, the construction of BIM data interoperability for energy performance assessment in the early design phase is important. The purpose of this study is to suggest construction of BIM data interoperability for energy performance assessment based on BIM. To archive this purpose, the authors have investigated advantage of BIM-based energy performance assessment through comparison with traditional energy performance assessment and suggested requirement for construction of open BIM environment such as BIM data creation, BIM data software practical use, BIM data application and verification. In addition, the authors have suggested BIM data interoperability and BIM energy property mapping method focused on materials.

  • PDF

BIM 기반 건축설계 관리 지원을 위한 클라우드 컴퓨팅 서비스 기능 제안 (A Proposal of Features of Cloud Computing Service for BIM based Architectural Design Management)

  • 안민규;최종문;이재욱;윤수원
    • 한국BIM학회 논문집
    • /
    • 제4권2호
    • /
    • pp.17-24
    • /
    • 2014
  • Recently, there have been various attempts for the adoption and spread of Building Information Modeling (BIM) in the construction industry. However, the spread of BIM has been less satisfied than expected, because of the insufficient, expensive hardware and software for the authoring, analysis and so forth. As a solution to resolve the obstacles, the applications of cloud computing technology to BIM have been introduced. Due to the vendor-dependent functions and lack of verification on the work process, the spread of cloud-based BIM has been limited in Korea. Therefore, this study proposes the functions of cloud computing services which can support BIM-based design processes through the review of practitioners, questionnaire survey and analysis of design process.

미국 공동주택의 건물 외피 에너지코드 검증을 위한 BIM 에너지 계획 방안 -뉴욕시 에너지 코드를 기준으로- (BIM Energy Efficiency Plan for Verification of Building Envelop Energy Code of Housing in USA - Based on the NYC Energy Conservation Code -)

  • 허진우
    • 문화기술의 융합
    • /
    • 제8권4호
    • /
    • pp.313-322
    • /
    • 2022
  • BIM의 생산성과 효율성 때문에 건축설계 방식으로 BIM을 선택하는 건축가들이 증가하고 있다. 또한 건물의 에너지 사용량에 대한 인식 제고와 환경에 대한 관심이 높아지면서 빌딩에너지 코드의 필요성에 대한 요구가 증가하고 있다. 현재 많이 사용하고 있는 2D CAD 설계방식으로는 건물 외피 에너지코드를 검정하는데 많은 시간과 노력이 소요되며 디자인 변경에 다른 즉각적인 대응이 어렵다. 이 연구의 목적은 BIM을 통한 건물 외피 에너지 모델링의 효율성을 보여주는 데 있다. 우리는 BIM을 통해 설계과정에서 디자인 변경에 따른 정보 값을 누락이나 재계산 과정 없이 동시에 산출할 수 있기 때문에 건물 외피 에너지코드 검증에서 생산성과 효율성을 높이는 데 기여할 수 있다. 연구의 절차는 다음과 같다. Revit 2011으로 만든 the Goldin at Essex Crossing 공동주택의 BIM을 사례 모델로 하여, 뉴욕시의 에너지 코드에 부합하기 위한 에너지 계획의 기준을 분석한다. Revit 모델의 설정을 통해 나온 결과 값과 뉴욕시의 에너지코드에서 요구하는 기준 값을 비교한다. 최종적으로 미국 에너지국 (U.S. Department of Energy)에서 제공하는 에너지 검증 프로그램인 COMcheck에 데이터값을 입력하여 건물 외피 에너지 성능이 뉴욕시 에너지 코드에 부합하는 지 여부를 체크한다.

대기행렬 모형을 활용한 시공단계 BIM 코디네이터 업무 성과 분석 (Empirical Evaluation of BIM Coordinator Performance using Queuing Model in Construction Phase)

  • 함남혁;여옥경;지규현
    • 한국BIM학회 논문집
    • /
    • 제8권3호
    • /
    • pp.31-42
    • /
    • 2018
  • This study focuses on the BIM request for information(RFI) processing performance and quantitatively analyzes the performance of the BIM coordinator and the loss due to the waiting of the project participants. For these purposes, a method to quantitatively evaluate the performance of the BIM coordinator was proposed using a queueing model. For the verification, two projects in which BIM was applied in the construction phase were selected, and the BIM RFI data were collected through the analysis of the BIM monthly report and BIM coordinator work log of each project. In addition, the BIM input personnel, labor cost, and productivity data were collected through interviews with the experts of the case projects. The analysis of the BIM RFI processing performance of the BIM coordinator using the queueing model exhibited on a probabilistic basis that the waiting status of the project participants could vary depending on the preliminary BIM application to the design verification as well as the input number and level of the BIM coordinator personnel. In addition, the loss cost due to the waiting of the project participants was analyzed using the number of BIM RFIs waiting to be processed in the queueing system. Finally, the economic feasibility analysis for the optimal BIM coordinator input was performed considering the loss cost. The results of this study can be used to make decisions about the optimal BIM coordinator input and can provide grounds for the BIM return on investment (ROI) analysis considering the waiting cost of the project participants.

Design and Implementation of a Blockchain System for Storing BIM Files in a Distributed Network Environment

  • Seo, Jungwon;Ko, Deokyoon;Park, Sooyong;Kim, Seong-jin;Kim, Bum-Soo;Kim, Do Young
    • 한국컴퓨터정보학회논문지
    • /
    • 제26권12호
    • /
    • pp.159-168
    • /
    • 2021
  • BIM (Building Information Modeling) 데이터는 전 세계 표준에 맞춰 설계 도면을 디지털화시킨 데이터이며, BIM 데이터의 안전한 공유 및 거래를 위해서 블록체인을 활용하기 위한 연구들이 진행되고 있다. 하지만, BIM 데이터의 용량 크기와 블록체인의 기술적 한계로 인해 BIM 데이터를 블록체인에 직접적으로 저장할 방법이 없다. 본 논문에서는 해당 문제점을 해결하기 위해 분산 파일 시스템과 블록체인을 융합하여 BIM 데이터를 저장하는 방안에 대해서 제안한다. 본 논문에서는 BIM 데이터 저장을 위해 두 개의 네트워크 오버레이를 구축하는 방안과 BIM 데이터의 효율적인 검증을 위해서 LOD (Level of Detail)기반의 머클 트리를 생성하는 방안을 제안하였다. 제안된 방식을 블록체인 클라이언트인 베수와 IPFS 클라이언트에 동기화 모듈과 함께 적용하여 BIM 데이터가 정상적으로 저장되는 것을 확인하였으며, 제안된 방식을 통해서 파일 용량이 증가할 때도 처리 속도가 안정적으로 증가한다는 것을 확인하였다.

도로 프로젝트의 BIM 사례모델 구축을 통한 호환성 검증 (Interoperability Verification using BIM Case Models of Road Project)

  • 문현석;김창윤;조근하;문진석;주기범
    • 한국BIM학회 논문집
    • /
    • 제5권1호
    • /
    • pp.44-53
    • /
    • 2015
  • Recently, BIM has been widely applying in civil engineering projects centering on the private construction industry in order to establish self guidelines for spreading in practice. However, most BIM technologies and software are based on the architectural projects. In these environments, it is not easy to apply the BIM to a infrastructure field. Even BIM standards with IFC (Industry Foundation Classes) are also focusing on architectural projects. Especially, both private and public sectors do not know about how BIM delivery system should be performed, and how such deliverable should be submitted to the government yet. Thus, we need to analyze an application level of BIM S/W (Software) in real projects and verify their interoperability. Besides, since there are not any common standards that can exchange IFC models for civil engineering projects, we have many issues in converting as-built infrastructure models into IFC and delivering their design documents to the government. Accordingly, this study aims to perform a BIM process with commercial software for real road project after a detailed design process is finished and verify interoperability between diverse BIM software for securing BIM data reliability.