BIM is one of the means of reducing the economic loss caused by design errors. These features of BIM have led to increased use of BIM. With the increasing use of BIM, several studies have been conducted to analyze the performance of BIM. As the importance of BIM staff is emphasized in the performance analysis of BIM, the human resource allocation of BIM staff can become an important research issue. However, there are few studies to measure the workforce effectiveness of BIM staff. Ham et al (2020) measured BIM workforce efficiency using FCFS queue model rules. Since design errors can have different effects on the project depending on the type, there are design errors that must be dealt with first. Therefore, in this study, a priority queue was used to solve design errors with high priority first. The performance of BIM-based design verification was analyzed by quantitatively analyzing the performance of BIM staff when the priority rule was applied to the design error processing sequence.
The BIM design is expected to expand to the domestic and overseas construction industries, depending on the effect of construction productivity and quality improvement. However, with the obligation of Public Procurement Service to design the BIM design, it includes a design error and the problem of utilization of 3D design by choosing a simple 2D to 3D remodelling method that can not be modelled in 3D modeling or use of the construction and maintenance phases. The results reviewed by BIM design results were largely underutilized and were not even performed with the verification of the error. In order to resolve this, one must develop the check system that secures the quality of BIM design and ensure that the reliability of BIM results are available. In this study, it is designed to develop a program that can automatically verify the design of the BIM design results such as violation of the rules of the BIM design, design flaws, and improve the usability of the BIM design. In particular, this programs were developed not only to identify programmes that were not commercially available, but also to validate drawings in low-light computer environments. The developed program(LH-BIM) store the information of attribute extracted from the Revit file(ArchiCAD, IFC file included) in the integrated DB. This provides the ability to freely lookup the features and properties of drawings delivered exclusively by the LH-BIM Program without using the Revit tools. By doing so, it was possible to resolve the difficulties of using traditional commercial programs and to ensure that they operate only with traditional PC performance. Further, the results of the various BIM software can be readily validated, which can be solved the conversion process error of IFC in the case of SMC. Additionally, the developed program has the ability to automatically check the error and design criteria of the drawings, as well as the ability to calculate the area estimation. These functions allow businesses to apply simple and easy tasks to operate tasks of BIM modelling. The developed system(LH-BIM) carried out a verification test by reviewing the review of the BIM Design model of the Korea Land & Housing Corporation. It is hoped that the verification system will not only be able to achieve the Quality of BIM design, but also contribute to the expansion of BIM and future construction BIM.
In the initial step of BIM based architectural design process, workloads are increased and the decision making process becomes more complex than those of the conventional design process. Technologies regarding distribution, exchange, classification, verification of BIM data are fundamental elements of construct environment for information sharing based on BIM. Interoperability of BIM model data is another issue to integrate BIM model. To improve interoperability in BIM-based collaboration, a model for utilizing formal&unformal design informations is suggested. Futhermore, Prototyping the model and practical test is conducted for advancement of data exchange making design data richen.
The automation technology is able to enhance the business process more rapidly and effective. Open BIM technology which supports automation technology of building overcomes the limitations of two dimensions drawings system. The purpose of this study is on the development of open BIM based modules for creating and verifying the core model for super-tall building in the schematic design phase. The module is expected to create cases of core models automatically and it is expected to verify the requirement of building model. This module is anticipated to utilize for creating the core model rapidly in order to create the alternative plan and to make the model accurate by its verification.
The 5th International Conference on Construction Engineering and Project Management
/
pp.267-273
/
2013
Early design phase energy modeling is used to provide the design team with first order of magnitude feedback about the impact of various building configurations. For better energy-conscious and sustainable building design and operation, the construction of BIM data interoperability for energy performance assessment in the early design phase is important. The purpose of this study is to suggest construction of BIM data interoperability for energy performance assessment based on BIM. To archive this purpose, the authors have investigated advantage of BIM-based energy performance assessment through comparison with traditional energy performance assessment and suggested requirement for construction of open BIM environment such as BIM data creation, BIM data software practical use, BIM data application and verification. In addition, the authors have suggested BIM data interoperability and BIM energy property mapping method focused on materials.
Recently, there have been various attempts for the adoption and spread of Building Information Modeling (BIM) in the construction industry. However, the spread of BIM has been less satisfied than expected, because of the insufficient, expensive hardware and software for the authoring, analysis and so forth. As a solution to resolve the obstacles, the applications of cloud computing technology to BIM have been introduced. Due to the vendor-dependent functions and lack of verification on the work process, the spread of cloud-based BIM has been limited in Korea. Therefore, this study proposes the functions of cloud computing services which can support BIM-based design processes through the review of practitioners, questionnaire survey and analysis of design process.
BIM의 생산성과 효율성 때문에 건축설계 방식으로 BIM을 선택하는 건축가들이 증가하고 있다. 또한 건물의 에너지 사용량에 대한 인식 제고와 환경에 대한 관심이 높아지면서 빌딩에너지 코드의 필요성에 대한 요구가 증가하고 있다. 현재 많이 사용하고 있는 2D CAD 설계방식으로는 건물 외피 에너지코드를 검정하는데 많은 시간과 노력이 소요되며 디자인 변경에 다른 즉각적인 대응이 어렵다. 이 연구의 목적은 BIM을 통한 건물 외피 에너지 모델링의 효율성을 보여주는 데 있다. 우리는 BIM을 통해 설계과정에서 디자인 변경에 따른 정보 값을 누락이나 재계산 과정 없이 동시에 산출할 수 있기 때문에 건물 외피 에너지코드 검증에서 생산성과 효율성을 높이는 데 기여할 수 있다. 연구의 절차는 다음과 같다. Revit 2011으로 만든 the Goldin at Essex Crossing 공동주택의 BIM을 사례 모델로 하여, 뉴욕시의 에너지 코드에 부합하기 위한 에너지 계획의 기준을 분석한다. Revit 모델의 설정을 통해 나온 결과 값과 뉴욕시의 에너지코드에서 요구하는 기준 값을 비교한다. 최종적으로 미국 에너지국 (U.S. Department of Energy)에서 제공하는 에너지 검증 프로그램인 COMcheck에 데이터값을 입력하여 건물 외피 에너지 성능이 뉴욕시 에너지 코드에 부합하는 지 여부를 체크한다.
This study focuses on the BIM request for information(RFI) processing performance and quantitatively analyzes the performance of the BIM coordinator and the loss due to the waiting of the project participants. For these purposes, a method to quantitatively evaluate the performance of the BIM coordinator was proposed using a queueing model. For the verification, two projects in which BIM was applied in the construction phase were selected, and the BIM RFI data were collected through the analysis of the BIM monthly report and BIM coordinator work log of each project. In addition, the BIM input personnel, labor cost, and productivity data were collected through interviews with the experts of the case projects. The analysis of the BIM RFI processing performance of the BIM coordinator using the queueing model exhibited on a probabilistic basis that the waiting status of the project participants could vary depending on the preliminary BIM application to the design verification as well as the input number and level of the BIM coordinator personnel. In addition, the loss cost due to the waiting of the project participants was analyzed using the number of BIM RFIs waiting to be processed in the queueing system. Finally, the economic feasibility analysis for the optimal BIM coordinator input was performed considering the loss cost. The results of this study can be used to make decisions about the optimal BIM coordinator input and can provide grounds for the BIM return on investment (ROI) analysis considering the waiting cost of the project participants.
Seo, Jungwon;Ko, Deokyoon;Park, Sooyong;Kim, Seong-jin;Kim, Bum-Soo;Kim, Do Young
한국컴퓨터정보학회논문지
/
제26권12호
/
pp.159-168
/
2021
BIM (Building Information Modeling) 데이터는 전 세계 표준에 맞춰 설계 도면을 디지털화시킨 데이터이며, BIM 데이터의 안전한 공유 및 거래를 위해서 블록체인을 활용하기 위한 연구들이 진행되고 있다. 하지만, BIM 데이터의 용량 크기와 블록체인의 기술적 한계로 인해 BIM 데이터를 블록체인에 직접적으로 저장할 방법이 없다. 본 논문에서는 해당 문제점을 해결하기 위해 분산 파일 시스템과 블록체인을 융합하여 BIM 데이터를 저장하는 방안에 대해서 제안한다. 본 논문에서는 BIM 데이터 저장을 위해 두 개의 네트워크 오버레이를 구축하는 방안과 BIM 데이터의 효율적인 검증을 위해서 LOD (Level of Detail)기반의 머클 트리를 생성하는 방안을 제안하였다. 제안된 방식을 블록체인 클라이언트인 베수와 IPFS 클라이언트에 동기화 모듈과 함께 적용하여 BIM 데이터가 정상적으로 저장되는 것을 확인하였으며, 제안된 방식을 통해서 파일 용량이 증가할 때도 처리 속도가 안정적으로 증가한다는 것을 확인하였다.
Recently, BIM has been widely applying in civil engineering projects centering on the private construction industry in order to establish self guidelines for spreading in practice. However, most BIM technologies and software are based on the architectural projects. In these environments, it is not easy to apply the BIM to a infrastructure field. Even BIM standards with IFC (Industry Foundation Classes) are also focusing on architectural projects. Especially, both private and public sectors do not know about how BIM delivery system should be performed, and how such deliverable should be submitted to the government yet. Thus, we need to analyze an application level of BIM S/W (Software) in real projects and verify their interoperability. Besides, since there are not any common standards that can exchange IFC models for civil engineering projects, we have many issues in converting as-built infrastructure models into IFC and delivering their design documents to the government. Accordingly, this study aims to perform a BIM process with commercial software for real road project after a detailed design process is finished and verify interoperability between diverse BIM software for securing BIM data reliability.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.