Korean Journal of Construction Engineering and Management
/
v.25
no.4
/
pp.24-33
/
2024
Recently, as smart construction has become more active, construction companys are evaluating their smart construction capabilities in order to transform into smart construction companies. However, the revitalization of smart construction doesn't only apply to construction companies, the level of utilization of all participants, including owners, designers, construction project managers, and construction company, must be improved. Therefore, this study aims to present a model that evaluate the building information modeling (BIM) utilization level for measuring the BIM utilization level of construction management companies in executing construction project management. In this study, an AHP questionnaire survey targeting BIM practitioners to calculate the weight of each BIM utilization item and score it to construct evaluation model and evaluate it by applying it to construction management companies are conducted. As a result of the evaluation using model, there were differences between companies in the number of BIM users, and in the qualitative evaluation, it is mainly used for interference review, constructability review, and design change management. Therefore, in order to revitalize BIM, it is believed that it is necessary to strengthen BIM utilization ability through separate training for construction manager (CMr) and to present clear utilization standards and scope of work for BIM utilization in performing construction management tasks. Consequently, evaluating more construction management companies using the model presented in this study will result in the transition of CM companies to smart construction and revitalization of BIM adoption.
코로나19 이후 건축사업계 비대면 작업 등의 필요성이 대두되면서, 스마트건설 플랫폼 기술인 BIM(Building Information Modeling, 건설정보모델링) 활성화에 관한 목소리도 높아지고 있다. 최근 한국건설기술연구원에서는 공공분야 BIM 기술의 성숙도를 4단계(레벨1~4)로 봤을 때, 우리나라의 평가치는 '레벨1' 초보 수준에 머물러 있다는 진단을 냈다. 이미 '레벨3' 수준에 진입한 영국 등 선진국보다 뒤처져 있다는 분석인데, 이는 2D 환경을 기반으로 설계 또는 시공업무에 대해 제한적으로 BIM을 적용하면서, 일정 규모 이상의 설계BIM만 의무화한 수준이기 때문이다. BIM 트렌드가 '기술개발'에서 '활용' 단계로 넘어가는 과정 가운데 건축분야에서의 활성화 방안은 무엇일까. 월간 '건축사'가 'WBIM(주.더블유빔)'사(社)의 이재환 대표를 만나 BIM의 현장 활용성, 그리고 적용 측면에서의 현실문제 등에 대한 현장 이야기를 들어봤다. 각종 개발사업과 설계파트를 지원하며 BIM전문가로 활동해 온 이재환 대표는 "기획단계부터 BIM을 활용하면 사업 진행 전 과정에서 실시간 검증이 가능하고 동시에 각종 아이디어를 효과적으로 적용할 수 있다"면서도 "활용성을 확보하려면 업계뿐 아니라 발주처, 감독 등도 BIM에 대한 이해도를 높여야 한다"고 말했다.
Journal of the Korea Institute of Building Construction
/
v.17
no.1
/
pp.83-90
/
2017
Recently, BIM has been actively adopted in construction projects and industries, and also integrated with Information and Communications Technology(ICT) such as cloud computing technology, sensor technology, 3D scanning and printing technology etc. However, it is very difficult to efficiently utilize BIM services, technologies and collaborate with each other because of differences of usage and requirements of technologies. Every participant in the same construction project has their own needs, requirements and details of the model in each phase. In order to enhance utilization BIM model, BIM services and technologies required in their project have to be clearly defined in the initial stage of the project. In order to support the owner to define the BIM level, BIM service level and application technologies are identified and guidelines how to define the level and technologies for their project purpose are suggested in this study.
Kim, Sung-Hoon;Sun, Oh-Young;Park, Young-Ho;Lee, Sang-Ho
Proceedings of the Computational Structural Engineering Institute Conference
/
2011.04a
/
pp.243-246
/
2011
본 논문에서는 최근에 개발되어 지하철 919공구에 적용된 BIM 기반 통합 공사관리 시스템의 구축방법과 적용성에 대해 검토하였다. 최근 대형 국책사업이 발주, 시공되면서 효율적인 공사관리를 위한 PMIS 도입이 보다 활발해지고 있는 가운데, 기존의 텍스트와 그래프 위주에서 BIM(Building Information Modeling) 기법의 하나인 4D, 5D 시스템을 이용한 다양한 시도가 되고 있다. 한편, BIM은 건설 전 생애주기에 걸쳐 활용되어야 그 도입목적을 극대화할수 있으나, 현 단계에서는 계획 및 설계단계에만 초점이 맞춰져 있어 실제 공사중에는 그 활용도가 상당히 낮은 수준이었다. BIM 기반의 통합 공사관리 시스템은 공사중, 현장과 본사를 비롯해 발주처와 감리단 등 다수의 공사 주체들이 계획, 설계시 구축된 BIM을 보다 효과적으로 사용하도록 함으로써, BIM의 공사중 활용성을 높일 뿐 아니라 유지관리 단계까지 확장하여 이용될 수 있다. 본 논문에서는 BIM 기반 통합 공사관리 시스템을 구축하기 위한 절차를 살펴보고, 최종 구축된 통합시스템의 적용성 분석후 활용방안을 제시하였다.
Proceedings of the Korean Institute of Building Construction Conference
/
2016.05a
/
pp.253-254
/
2016
In the trend of building enlargement, high-rise and irregular shaped building, domestic application of BIM in construction phase is increasing in recent years. BIM that is based on a three-dimensional, requires a specific building expression. Model expression level required for each phase such as design, construction, and maintenance of the construction project can be different. BIM model to apply in practice is difficult because it is not clear to set up the criteria for the expression level of construction BIM model. And it has a limit that is lower productivity in construction project. Therefore, this study considers the way of the improvement and analyzes the application for representation level of construction BIM model through the survey. By analyzing of the survey results, this study will be to present a basis for an appropriate expression level setting of construction BIM model.
Korean Journal of Construction Engineering and Management
/
v.14
no.5
/
pp.74-83
/
2013
Most current BIM systems are focused on the visual information of work status in the design and construction stages. In a passive BIM system, 3D CAD tool can visualize the interference elements of design drawings, however, it cannot suggest a solution to solve the interference status. And 4D CAD tool in the construction stage can simulate the appearance of each activity by construction schedule, however, it cannot suggest an optimized schedule plan considering specified schedule condition of the project. Recently, many organizations need BIM solutions that can improve the work status beyond the level of simple visual information from BIM system. Active BIM system can provide the solutions to the project manager. This study suggests active BIM functions for the solutions and attempts to develop a 4D CAD engine to validate the usability of the functions.
Korean Journal of Construction Engineering and Management
/
v.22
no.6
/
pp.3-14
/
2021
In the Chinese construction industry, the utilization of Building Information Modeling (BIM) aims to increase the total output of the construction industry by solving the problem of inefficient interoperability in the construction industry. In 2011, the Chinese Ministry of Housing and Urban-Rural Development despite the technical advantages of BIM and the government policy, the BIM adoption rate in China is lower than 45%. Meanwhile, as the South Korean construction industry is a step ahead of its Chinese counterpart in introducing and utilizing BIM, it is expected that BIM is more actively utilized and accepted in South Korea than in China. According to a comparative study based on the hype-cycle theory, South Korea is at a more advanced stage of introducing BIM, than in China. This study aimed to suggest how to increase BIM utilization rates in China. To this end, this study comparatively analyzed factors affecting BIM acceptance between China and South Korea. For the comparative analysis of the BIM acceptance factors between China and South Korea, literature reviews on the technology acceptance model (TAM) and BIM acceptance model were carried out, and based on that, the BIM acceptance factors were classified. Other BIM acceptance factors were also added and considered, as they reflected Chinese national characteristics and construction industry. As for the derived BIM acceptance factors, construction project participants, especially actual BIM users in China and South Korea, were targeted for the survey. A t-test using SPSS 22.00 was carried out to identify significant differences in data. Finally, based on the t-test results, this study suggested ways of improving the BIM utilization rate in China. Based on the findings, this study is expected to contribute to activating BIM adoption in the Chinese construction industry and also to set a theoretical foundation for future studies on BIM utilization in the industry.
Korean Journal of Construction Engineering and Management
/
v.25
no.5
/
pp.3-14
/
2024
Recently, both nationally and internationally, various BIM guidelines have been developed. These guidelines present fundamental principles and standards for the application of BIM. However, practical BIM guidelines for the schedule management area in the construction phase are lacking, making it difficult to apply them effectively in practical work settings. In this study, performance-based delivery guidelines are presented for the key functionalities of 4D CAD systems, which are representative BIM tools used in the construction phase. To achieve this, a survey analysis was conducted to determine the prioritization of these functionalities. Based on the characteristics of the project, delivery guidelines were formulated to allow users to selectively utilize the guidelines at different levels. Furthermore, practical ways to utilize performance-based delivery guidelines for schedule management using 4D CAD were proposed, validating the usability of these guidelines. The research findings suggest that these guidelines for BIM functionality in schedule management can hold practical significance as the utilization of BIM in construction phases continues to increase.
Kim, Sung-Hoon;Lee, Sang-Ho;Nam, Sang-Hyeok;Sun, Oh-Young
Journal of the Computational Structural Engineering Institute of Korea
/
v.24
no.4
/
pp.463-469
/
2011
BIM(Building Information Modeling) technologies should be applied for the construction life cycle to maximize its efficiency, but the utilization for the construction phase has been significantly lower than that for the planning and design phase. Recently, some of BIM techniques such as 3D design review, 4D schedule management and so on are being introduced for efficient managing to the big national construction projects. In this study, the utilization plans of BIM are presented for the construction phase of civil engineering facilities. The methods of utilization of BIM are discussed for each type of construction, and the techniques applied to the Seoul Subway Lot No. 919 are analyzed for checking the applicability and usability. In particular, a web construction management system based on BIM can help field engineers, headquarters and contractors to use BIM more effectively, and it can be extended to maintenance phase for more efficiencies.
Journal of the Korea Institute of Building Construction
/
v.19
no.1
/
pp.87-93
/
2019
In recent years, BIM services have been used in many construction projects. However, they are raising the question that there are many differences between what was initially proposed and what was actually done. In the IT sector, a method called as SLA is used to perform an assessment of the services delivered to the IT service project. In this respect, this study intends to introduce this method into building construction projects to use BIM in order to propose evaluation criteria and the evaluation process for SLA-based BIM service. The BIM service assessment process and criteria presented are judged to help introduce consistent and systematic BIM services in construction projects.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.