• Title/Summary/Keyword: BIM 설계자동화

Search Result 59, Processing Time 0.019 seconds

Automation Review of Road Design Standard using Visual Programming (비주얼 프로그래밍 기법을 활용한 도로설계기준 자동검토 방안)

  • Hyoun-seok Moon;Hyeoun-seung Kim
    • Journal of the Society of Disaster Information
    • /
    • v.18 no.4
    • /
    • pp.891-898
    • /
    • 2022
  • Purpose: There is not much time left for mandatory BIM implementation for all sectors and stages of the construction industry. Therefore, it is necessary to find a way to secure technology to substantially improve the productivity of BIM work. In the research, we proposed a method to automatically verify related construction standards for major objects produced by BIM modeling procedures so that engineers can verify construction standards in the BIM-based design process. Method: We defined a modeling work procedure for BIM-based road design work and prepared a method for constructing related design standards in a database. In addition, a process map for developing a BIM-based design basis review automation system was also presented. Result: A BIM-based design standard review automation module was developed using Civil3D and Dynamo. And it was confirmed by the test application that it is possible to quickly judge whether the BIM object manufactured in the design process conforms to the construction design standard. Conclusion: BIM-based design standard review automation technology can improve the productivity of BIM model production work and secure the quality of the BIM model.

Development and Application of a BIM Library Placement Automation Model (BIM 라이브러리 자동 배치 모형 개발 및 사례 검증)

  • Hyeon-Seung Kim;Hyoun-Seok Moon;Leen-Seok Kang
    • Land and Housing Review
    • /
    • v.15 no.1
    • /
    • pp.157-165
    • /
    • 2024
  • As major public owner agencies in Korea have improved the application level of BIM, many design and construction companies are paying more attention to ways to improve actual work productivity in the BIM execution process. In this study, we introduce a method to automate the placement of BIM libraries, a recurring task in the BIM-based design process that serves as a prime example of BIM design automation methodologies. In particular, we classify the target surfaces for placement of BIM libraries into straight lines, curves, vertical planes, and surfaces. For each target surface, we implement a BIM library automatic placement model in Dynamo, considering the spacing and alignment according to the distance between the centers of two objects and the linear length. The results of case studies confirm that the proposed method can be employed according to various placement environments and conditions with the working time shortened. The study proposes that various objects and structures that need to be placed according to the terrain characteristics can be placed accurately, and work productivity can be significantly improved through the automation of placement.

A study on Development of Practical BIM Library for Automated BIM Design in Port and Harbor Infrastructure (항만인프라의 설계 자동화를 위한 실무형 항만 BIM 라이브러리 개발에 관한 연구)

  • Kim, Hyeon-Seung;Lee, Heon-Min;Lee, Il-Soo
    • Journal of KIBIM
    • /
    • v.9 no.4
    • /
    • pp.21-30
    • /
    • 2019
  • Many studies on BIM-based design, construction and operation have already been conducted on roads, railways, etc., but BIM research in the ports and harbors is still lacking. This research develops BIM Library and Technical contents focused on practical usability of ports and harbors infrastructure. We have developed technical content by applying various User Interfaces and workflows, considering the characteristics of ports and harbors design. In order to examine the practical utility of the developed library and contents, we tried modeling the breakwater using these. As a result, we confirmed that collaboration of BIM library and technical contents could significantly improve the productivity of BIM design by increasing library usage and automating repetitive tasks.

Development of BIM based Programs for Design and Drawing of PSC Box Girder Bridges (BIM 기반의 PSC 박스 교량 설계 자동화 및 도면 관리 툴 개발)

  • Hwang, Kyu-Hwan;Ahn, Do-Hwan;Seok, Hyun-Su;Shim, Chang-Su
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.97-100
    • /
    • 2010
  • 3차원 정보모델에 기반한 설계 자동화 프로그램의 개발은 좀 더 완성도가 높은 설계안을 도출할 수 있는 방안을 제시할 수 있다. 콘크리트 교량의 설계 과정에서 정형화된 구조 검토 단계 부분을 자동화하고 설계자로 하여금 좀 더 창의적인 설계가 가능하도록 지원하는 시스템을 개발하였다. 특히, 3차원 Building Information Modeling 기반의 프리스트레스트 콘크리트 박스 거더교에 대한 설계 자동화 시스템을 개발하였다. 이를 위하여 3차원 렌더링 알고리즘을 사용하여, 사용자가 원하는 단면 위치 및 분류 체계에 따라 설계를 자동으로 수행할 수 있도록 적용하였다. 또한 생성된 도면은 데이터 호환이 가능함으로써, 사용자의 편의성이 향상될 것으로 판단된다. 이는 설계자동화 분야에서 강교에 국한되었던 점을 콘크리트교를 포함한 주요 교량으로 확대하고 설계 성과품으로 3차원 모델을 도출할 뿐 아니라 2차원 도면을 연계하도록 구성하여 토목 엔지니어의 기술력을 향상시킬 것으로 기대된다.

  • PDF

A Development of Prototype Design Automation System for Standard Connections Using High-Strength Bolts based on BIM (BIM 기반의 고력볼트 마찰접합부 설계자동화 시스템의 프로토타입 구축)

  • Eom, Jin-Up;Shin, Tae-Song
    • Journal of Korean Society of Steel Construction
    • /
    • v.23 no.5
    • /
    • pp.637-646
    • /
    • 2011
  • This study is related to the development of a design automation system for the construction design phase of steel structures. The system intended for beam splice friction connections using high-strength bolts. The standard design method and standardization principles that are suggested in the design manual for standard connections using high-strength bolts published by the Korean Society of Steel Construction(KSSC) were reviewed. A structural analysis algorithm was formulated from the review. A design automation system that can automatically calculate the structural design of connections and automatically generate the connection model without separate inputs was developed. To verify the validity of the developed system, its results were compared with the date in the table for the connection design in the Design Manual. The development system was also applied to the sample model. Then the structural design results were compared with the properties of the connection models and drawings created from the results.

Development and Application of Tunnel Design Automation Technology Using 3D Spatial Information : BIM-Based Design for Namhae Seomyeon - Yeosu Shindeok National Highway Construction (3D 공간정보를 활용한 터널 설계 자동화 기술 개발 및 적용 사례 : 남해 서면-여수 신덕 국도 건설공사 BIM기반 설계를 중심으로)

  • Eunji Jo;Woojin Kim;Kwangyeom Kim;Jaeho Jung;Sanghyuk Bang
    • Tunnel and Underground Space
    • /
    • v.33 no.4
    • /
    • pp.209-227
    • /
    • 2023
  • The government continues to announce measures to revitalize smart construction technology based on BIM for productivity innovation in the construction industry. In the design phase, the goal is design automation and optimization by converging BIM Data and other advanced technologies. Accordingly, in the basic design of the Namhae Seomyeon-Yeosu Sindeok National Road Construction Project, a domestic undersea tunnel project, BIM-based design was carried out by developing tunnel design automation technology using 3D spatial information according to the tunnel design process. In order to derive the optimal alignment, more than 10,000 alignment cases were generated in 36hr using the generative design technique and a quantitative evaluation of the objective functions defined by the designer was performed. AI-based ground classification and 3D Geo Model were established to evaluate the economic feasibility and stability of the optimal alignment. AI-based ground classification has improved its precision by performing about 30 types of ground classification per borehole, and in the case of the 3D Geo Model, its utilization can be expected in that it can accumulate ground data added during construction. In the case of 3D blasting design, the optimal charge weight was derived in 5 minutes by reviewing all security objects on the project range on Dynamo, and the design result was visualized in 3D space for intuitive and convenient construction management so that it could be used directly during construction.

The case study of BIM-based quantity take-off for concrete and formwork (BIM 기반 물량산출 자동화를 위한 콘크리트와 거푸집 공사의 사례분석)

  • Jun, Ki-Hyun;Yun, Seok-Heon
    • Journal of KIBIM
    • /
    • v.1 no.1
    • /
    • pp.13-17
    • /
    • 2011
  • Currently, a lot of design, engineering and construction companies has been interested in BIM(Building Information Modeling) technologies for higher productivity and efficiency. The information provided from BIM can be mostly used for automated quantity takeoff. But BIM has some problems for fully automated quantity takeoff to solve. The purpose of this study is to show the problems and suggest solutions through case study, especially with concrete and form work.

The Development of Automated System for 3D Design and Stability Evaluation of Caisson (케이슨의 3D 설계 및 안정 검토 자동화 시스템 개발)

  • Lee, Hurn-Min;Kim, Hyeon-Seung
    • Land and Housing Review
    • /
    • v.11 no.4
    • /
    • pp.105-113
    • /
    • 2020
  • In this research, the automated system for 3D modeling and stability evaluation of caisson was developed. It is possible to build a BIM model while examining the stability of the structures to improve the practical use of BIM technology. This study analyzed industry cases and guidelines for caisson stability evaluation and BIM-based modeling. As a result, the data for calculating the stability evaluation of caisson as well as the modeling parameters were derived. In particular, the automated system for 3D modeling, which reflects more than 30 parameters, allows for BIM models for various types of the caisson, such as open-cell caisson, open-cell caisson with uneven, slit caisson, slit caisson with uneven, and curved caisson. The study tested the proposed system using case studies and found that it helps not only to automate the BIM model with various caisson types as parameters but also to make partial shape changes accessible. The study also confirmed that the stability evaluation can be quickly carried out with shapes changed. Finally, the study results suggest that the proposed method should complete the task seven times as fast as the conventional work method.

A Study on the Automated Estimating System using BIM based Library (BIM 기반 토목 라이브러리를 통한 견적자동화시스템에 관한 연구)

  • Han, Jung-Hoon;Nam, Sang-Hyeok
    • Journal of KIBIM
    • /
    • v.1 no.2
    • /
    • pp.12-18
    • /
    • 2011
  • The BIM techniques which manages information over the life cycle of construction project based on the 3-dimensional model are developing in the direction of integrated construction management including planning, design, analysis, estimation, 3D simulation and so on. The estimation model based on the BIM has different detail level and model information. In this study, the LOD of estimation model is catched for the bridge structures. The library classes are defined with construction information classification system, and the quantities of resources are calculated by class parameter using Microstation API. Finally, the automated estimation system using BIM based library is verified by the integrated model for adjustments of level of detail.

Automatic Inference of Standard BOQ(Bill of Quantities) Items using BIM and Ontology (BIM과 온톨로지를 활용한 표준내역항목 추론 자동화)

  • Lee, Seul-Ki;Kim, Ka-Ram;Yu, Jung-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.99-108
    • /
    • 2012
  • The rough design information is only available from BIM(Building Information Model) based schematic design. So, it is difficult to obtain sufficient information for generating BOQ. Like 2D design, there are some problems that the results are depend on what the choice of cost estimator. However, the most research of BIM based cost estimation are focus on quantity takeoff, the consideration of work item for generating BOQ is insufficient. Therefore, this paper present automatic inference process of work items in a BOQ using ontology. The proposed process and ontology is validated through applying tiling construction. If the proposed process is utilized, it is expected the basis of developing generation method for consistent BOQ by resolving intervention of cost estimator's arbitrary decision.