• Title/Summary/Keyword: BIM설계

Search Result 473, Processing Time 0.021 seconds

BIM Based Time-series Cost Model for Building Projects: Focusing on Construction Material Prices (BIM 기반의 설계단계 원가예측 시계열모델 -자재가격을 중심으로-)

  • Hwang, Sung-Joo;Park, Moon-Seo;Lee, Hyun-Soo;Kim, Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.2
    • /
    • pp.111-120
    • /
    • 2011
  • High-rise buildings have recently increased over the residential, commercial and office facilities, thus an understanding of construction cost for high-rise building projects has been a fundamental issue due to enormous construction cost as well as unpredictable market conditions and fluctuations in the rate of inflation by long-term construction periods of high-rise projects. Especially, recent violent fluctuations of construction material prices add to problems in construction cost forecasting. This research, therefore, develops a time-series model with the Box-Jenkins methodologies and material prices time-series data in Korea in order to forecast future trends of unit prices of required materials. BIM (Building Information Modeling) approaches are also used to analyze injection time of construction resources and to conduct quantity takeoff so that total material price can be forecasted. Comparative analysis of Predictability of tentative ARIMA (Autoregressive Integrated Moving Average) models was conducted to determine optimal time-series model for forecasting future price trends. Proposed BIM based time series forecasting model can help to deal with sudden changes in economic conditions by estimating future material prices.

A Study on the Optimization of Color Module BIPV Architectural Design Using BIM - Based on the data of Seoul surveyed solar radiation - (BIM을 활용한 컬러모듈 BIPV 건축 설계 최적화 방안 연구 - 서울 지역 실증 일사량 데이터 중심으로 -)

  • Jeon, Hyun-Woo;Yoon, Hea-Kyung;Park, Suh-Jun
    • Journal of KIBIM
    • /
    • v.9 no.3
    • /
    • pp.19-29
    • /
    • 2019
  • Currently, BIPV (Building Integrated Photovoltaic) design technology lacks analysis function at the planning stage, and there is a lack of understanding and reliability of BIPV design method and system for building designers. To design and consider various building integrated solar design alternatives, the color of building integrated solar is often monotonous or does not match the design direction of the building. In this study, architectural designers can select various color modules in the planning and design process of the building and analyze the characteristics of color module solar cells and compare and analyze the actual solar radiation and predicted solar radiation in Republic ofKorea Seoul to reduce the confusion of design methods. By building a BIM design integrated system that can prove the quality of the building and analyze the shading analysis and power generation performance architecturally, it can improve the reliability of color module solar cell applicability that can express aesthetics in buildings and the predicted solar power generation capacity of each region. In the initial design stage, based on the empirical data of the BIPV system, it is possible to analyze the power generation performance for each installation angle and installation direction by analyzing the surrounding environment and the installation area, and accurately determine the appropriateness of the design accordingly.

Multi-Family Housing Block Design Strategy Development by BIM-based Energy Performance Analysis - focusing on the Block Types and the Variations in Stories - (BIM 기반 에너지성능분석을 통한 공동주택의 주동 설계 전략개발 - 주동타입 및 층수 변화를 중심으로 -)

  • Jun, Jae-Hong;Park, hye-Jin;Lee, Kweon-Hyung;Choo, Seoung-Yeon
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.2
    • /
    • pp.3-11
    • /
    • 2018
  • Korea has achieved a rapid economic development and with the increase in population and national income and the expansion of social and economic activities, energy consumption has rapidly increased too. Energy consumption per head has constantly increased and currently, power consumption per head is 7.5 times bigger than in 1985. Buildings occupy 25% of total energy consumption and especially, 50% of total energy is consumed for heating and cooling. In this situation, multi-family housing, which has constantly been increased, has an energy saving rate of 1.9%, which is the lowest level and this makes the government's energy policy for sustainable energy system development useless. Besides, energy consumption leads to secondary problems, such as air, water and marine pollution and heat pollution and wastewater/drainage and the increased use of fossil fuel is a fundamental reason for ozone layer destruction and global warming. Therefore, efficient energy consumption plans are required. This study aims to analyze energy performance in each block type of high-rise and diversified multi-family housing that accounts for 60% of all the housing forms, depending on the variations in stories through BIM-based energy simulation. For this study, four representative block types were selected, based on the multi-family floor plan, which is certified for energy performance evaluation and they were applied to the floor plan of a multi-family house that is scheduled to be built. Then BIM modeling was conducted from the fifth story to the 40th story at an intervals of 5 stories and based on the finding, energy characteristics of each block type and energy performance depending on the variations in stories were analyzed. It is considered that this would serve as objective data for block type and block story decision of energy performance-based multi-family housing.

A Study on a Technique for Simplifying the Connection of a 3D Model and Schedule Information for 4D Simulation (4D 시뮬레이션을 위한 3D 모델 및 공정 정보의 연계 간소화 기법 연구)

  • Park, Sang Mi;Lee, Jae Hee;Yoon, Hyeong Seok;Hwang, Jae Yoeng;Kang, Hyo Jeong;Kang, Leen Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.6
    • /
    • pp.861-868
    • /
    • 2022
  • A key use of applying building information modeling (BIM) to the construction stage of a project is to help identify construction obstacles and to visualize construction status according to the progress of the construction schedule. When employing 4D simulation for this purpose, start and finish dates for each activity and a 3D model of the activity must be prepared. In this work, in order to simplify the configuration of a 4D model, minimum attribute information of the BIM model produced in the design stage was used to construct a system that generated activity information in the construction stage using a clustering algorithm. Its usefulness as actual schedule management information was then analyzed.

Analysis of Standardized Drawings and Breakdown Structure to Develop of 3D Object Library for Railway Infrastructure (철도인프라 3차원 객체라이브러리 구축을 위한 표준도/분류체계 분석)

  • Park, Hyung-Jin;Seo, Myoung-Bae
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.30 no.1
    • /
    • pp.71-76
    • /
    • 2017
  • In BIM design, the construction and use of a library are very important. Since the existing contents can be re-used, the design can be executed more effectively and efficiently. Unlike the construction, the civil engineering, in particular, the railroad sees an inappropriate development and standardization of libraries. Thus, this study aims to develop and standardize the 3D object library in the railroad facility. We first gather and analyze the railroad facility breakdown structure and relevant drawings. We then match the items of analyzed standard drawings and the breakdown structure items. It was reviewed whether the library was required according to all items, and if required, it was reviewed what software was proper. Available software were found to be Civil 3D, Revit, etc. Based on this analysis, we will design the attribute items and specifications of the 3D railroad infrastructure library, as well as construct the library thereof.

Prototyping a BIM-enabled Design Tool for the Auto-arrangement of Interior Design Panels - Based on the Pattern Extraction of Bitmap Image Pixels and its Representation - (BIM기반 설계를 지원하는 인테리어 패널 자동배치 도구 프로토타입 구현 - 비트맵 이미지 픽셀 패턴의 추출과 패널 표현을 중심으로 -)

  • Huang, JinHua;Kim, HaYan;Lee, Jin-Kook
    • Design Convergence Study
    • /
    • v.15 no.5
    • /
    • pp.71-83
    • /
    • 2016
  • Interior panels are usually used in finishing of interior walls for not only decorative effects but also information transfer. According to designer's design placing interior panels may need repetitive tasks and the emphasis of this paper is to support an automation of these tasks. Considering the utilization characteristics of interior panels, we propose three method to present patterns by using bitmap image pixels and interior panels' shape changes, based on the theoretical consideration. In addition, in order to approve the possibility of the proposed methods, we have implemented the BIM based interior panels auto layout tool which applied one of the three methods to present patterns by using bitmap image pixel values and panel identification attributes. This tool also supports auto generation of quantity and panel arrangement sequence information that will be used in future construction phase. We expect that this approach will also be used in other decorative objects which require repetition of the basic units, such as floor tiles.

A Study on Automated Quantity Take-off Methods of Earth Works in Road Design using 3D Design Concept (3차원 설계를 통한 도로설계단계의 토공 자동물량 산정 방안에 관한 연구)

  • Cho, Myunhwan;Kim, Nakseok;Chae, Jae-Hyun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.2
    • /
    • pp.277-283
    • /
    • 2016
  • Recently, the interests in three-dimensional design and BIM(Building Information Modeling) are increasing in civil engineering sector and the researches about three-dimensional design and quantity take-off methods for civil engineering structures have been conducted. However, these studies are just carried out the 3D design and quantity calculation of civil structures on the road or railway such as bridges and tunnels. The study on the quantity take-off methods and the evaluation of calculated results on the earth works should be performed in more detail. Based on these backgrounds in mind, the study was conducted the three-dimensional road design and evaluated the quantity take-off results on the earth works using 3D calculation method(average end area method, prismoidal method and composit method). The calculated quantity from composit method showed about 5% error of measuring efficiency than the average end area method, and when reporting the quantity calculation of earth works, it is necessary to specify the calculation method using quantity take-off of earth works.

A Study on Improving Usability focused User Interface in the BIM tool sets - Focused on Preliminary-Design and Schematic-Design in Architecture - (BlM 도구의 사용자 인터페이스 개선사항에 관한 연구 - 건축기획과 계획 설계 과정을 중심으로 -)

  • Jeong, Hyeock-Jin
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.9 no.1
    • /
    • pp.31-40
    • /
    • 2009
  • This study is intended to suggest methodologies in theory that is dedicated to improve existing features in BlM tool sets and introduce a new horizon for developing new features in the future so that more functionality can be provided to the work process of architect. To be more utilized of BlM tool sets in a useful way, it is important to make sure to program a calculation method used in the design process which is based on the information provided by architect, such as design item with detailed process and transformed parametric information on warranty data. Finding pros and cons in the usability from the well-known 3D modeling applications and taking highly usable UI features from the existing applications, and using a common wording were carried out. Design architect identifies reusable parametric information and then finds an algorithm between each items so that BlM tool sets can contribute to design field in the future. Therefore, the formula has been developed for the items considering business aspects and architecturing size in the preliminary-design, and design aspects in the schematic design with idendifying inputs and outputs that is necessary to become fixed factors.

  • PDF

A Case Study of BIM-based Framework on Constructability Tasks (BIM기반 골조공사의 시공성분석 업무 적용사례에 관한 연구)

  • Lee, Seung-Il;Kwon, Nam-Ha;Cho, Young-Sang
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.5
    • /
    • pp.45-54
    • /
    • 2010
  • Recently more and more construction projects have become high-rise, complex and intelligent. Accordingly, such projects require an integrated management system for tasks, with a lean approach to construction with work processes for management and productivity. In particular, Construction Information Technology (CIT) fields are concerned with Building Information Modeling (BIM), which represents the process of generating and managing building data during its life cycle. Constructability research has progressed for the project goal which is a cost-time-quality of optimization by integrated construction knowledge and experience. However, the current constructability process has not been performed efficiently, as the existing 2D drawings and papers lack consistent and accurate information, it is difficult to share the contents of work, and the use of information is inefficient. This study proposes that the reformation and enhancement of BIM-based constructability work process can lead to brilliant performance in the framework of the construction phase through achieving collaboration between the design team and the workers at the site.