• Title/Summary/Keyword: BIM설계

Search Result 469, Processing Time 0.026 seconds

A Study on Analysis of the Template Component for the Development of BIM Template (BIM 템플릿 개발을 위한 템플릿 구성요소 분석에 관한 연구)

  • Lee, Sang Heon;Kim, Mi Kyoung;Choi, Hyun Ah;Jun, Han Jong
    • KIEAE Journal
    • /
    • v.11 no.2
    • /
    • pp.123-130
    • /
    • 2011
  • BIM based design methodology requires more information than traditional design methodology in order to insure efficiency throughout the project. BIM based design not only requires all building data in the form of 3D shapes, but also all other relevant data regarding building components. Information is typically grouped in a standard classification system such as by standardized material names. The development of a domestic BIM based standard classification system is yet to be created and deployed in the industry. Each designer is specifying their own building information classification systems which is causing inconsistency in the industry. Therefore BIM based designs, are causing confusion in the industry as each designer follow no guidelines for material standardization classification. The lack of information regarding this in the BIM template will continue to cause confusion about a projects building information data consistently. This study is that of preliminary research to develop a BIM template. First, overseas BIM templates were analyzed regarding BIM standards and documentation. Examination then followed regarding the element and characteristics needed for the development of a BIM template, a suggested hierarchy of elements required for a BIM template were then made. The result of this research is that it will be used to develop a "BIM template prototype", to support the generation of building information data regarding neighborhood facilities.

Strategies to Revitalize BIM(Building Information Modeling) by the Survey Questionnaires from Design Experts in Field of Civil Engineering (토목설계 전문가 설문조사를 통한 BIM 활성화 방안)

  • Seo, Myoung-Bae;Ju, Ki-Beom
    • The Journal of the Korea Contents Association
    • /
    • v.12 no.11
    • /
    • pp.446-457
    • /
    • 2012
  • Recently, BIM(Building Information Modeling),which has been an issue in construction work, has been focused on as a new alternative of building industry for way out of crisis by slowing down and decreasing of orders in construction industry. Research for introducing BIM to the architectural field is already proceeding actively at home and abroad. However, civil engineering is so nonrecurring, horizontal, and different from regular construction works that it a large amount of information occurs because of wide range of project, which causes construction firms and design engineers to have some questions whether their initial investment cost would work or not and feel uncomfortable with the cost. In this study, technology level in engineering firms were surveyed for adapting BIM to domestic civil engineering. Development direction of BIM standard information model was drawn through awareness change analysis of BIM in civil engineering, as well. Deduced development direction is composed of guide development, system development, deliverable check and international standard proposal. The outcome will be employed as preliminary data for the study on development of infrastructure BIM standard and deliverable check system in civil engineering.

Design of Browser for The Harbor BIM Service Based on Cloud Computing (클라우드 컴퓨팅 기반 항만 BIM 서비스를 위한 브라우저 설계)

  • Chang, Jae-Yeol;Moon, Hyoun-Seok
    • Journal of KIBIM
    • /
    • v.8 no.4
    • /
    • pp.60-71
    • /
    • 2018
  • The port BIM technology has many problems such as lack of relevant system, high cost of BIM infrastructure construction, and process difference of existing domestic inter-industry. Since the port facilities as national key industries are managed and operated by public organizations, it is necessary to integrate IT resources and have a system that needs collective construction and joint utilization management. In this paper, we proposed the convergence of cloud computing technology and BIM as a way to reduce the infrastructure cost required for port BIM operation and to provide various BIM services for domestic process. To do this, we collected system requirements based on demand surveys of port staff and designed a BIM browser that provides IFC-based BIM server and customized services to reduce infrastructure cost in cloud computing environment. In terms of infrastructure, we designed cloud-based IaaS to support cost reduction, which is an essential component, and designed SaaS to support customized services in terms of services. We will perform performance verification with focus on whether port BIM servers and browsers have reached a level where they can manage four BIM models with different types and capacities.

Automated Digital Engineering Modeling of Prefabricated Bridges with Parameterized Straight Alignments (직선교량에 대한 디지털엔지니어링 모델의 선형연동 프로그램 개발)

  • Choi, Jae-Woong;Kang, Jeon-Yong;Kim, Hyun-Min
    • Journal of KIBIM
    • /
    • v.10 no.4
    • /
    • pp.40-49
    • /
    • 2020
  • This report describes the development of a program that can be linked to an alignment and extracts related information using a prefab structured digital engineering model. The subject bridge was set as a straight alignment, the Superstructure type as Precast girder and the Substructure type as Precast pier and Cast-in-situ Abutment. We identified the variables required to create a digital engineering model and reviewed them to create the digital engineering model by entering them as numerical values in the program. In addition, it is configured so that the variables linked to the alignment can be entered numerically. The quantity takeoff can be calculated when the design is complete. The purpose of the program development presented in this report is to enable the designers to select the optimal alternative by designing a bridge that best fits their current situation, extracting the relevant information and then by providing it to the manufacturer and construction company.

BIM System Development for Conceptual Design and Pre-Feasibility Study of Cable-Stayed Bridge (BIM 기반 사장교의 개념설계 및 예가분석 시스템 개발)

  • Chun, Kyoung-Sik;Park, Won-Tae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.10
    • /
    • pp.7204-7210
    • /
    • 2015
  • This paper has developed the system for supporting the approximate construction cost and the quantity estimation based on 3D model information in the pre-project planning phase of 3-span continuous cable-bridge with 2-pylons. First of all, we'd analyzed the design information (structural design report, blueprint and quantity) of the existing cable-stayed bridges and derived the design variables of cable-stayed bridges. We developed the BIM wizard that generates a cable-stayed bridge model parametrically based on derived design variables. The principle material quantities of cable-stayed bridge are calculated directly from 3-dimensional bridge model built by using the BIM wizard. Then, we can estimate the construction cost in relation to its quantities and unit cost of cable-stayed bridge. In a result, we have established the system that the construction cost can be estimated more specific than the conventional method (construction estimates per meter or square meter). We hereby will be able to review various alternatives as soon as possible in bidding process.

Schematic Estimate Framework of Finishing Works based on IFC-BIM Knowledge (IFC-BIM 연계 지식정보기반 마감공사 개산견적 프레임워크)

  • Park, Sang-Hun;Park, Hyung-Jin;Koo, Kyo-Jin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.6
    • /
    • pp.4176-4184
    • /
    • 2015
  • Cost Estimate for alternative in design phase of construction become criterion for profitability and feasibility analysis of projects. Initial design phase performed schematic estimate based on similar data in the past. The quantity take-off according to estimators experience and calculation method are occurred different or missing. IT (Information Technology) technology evolution has been promoting BIM technology in construction. It is changing the paradigm of planning, design, construction and maintenance phase throughout the construction project. A number of studies have been attempted to apply BIM technology in the construction. In this paper, we propose schematic estimation framework linking standard format IFC (Industry Foundation Classes) and estimate related knowledge. As a result, it performs a cost prediction for decision-making in the design phase, and expected to overcome the limitations of previous studies. In addition, it is possible actively coping with changes.

Advanced Sensor-based Building Information Modeling (BIM) for Construction, Operation, and Maintenance Phases of the Project Lifecycle (시공 및 유지관리 단계에서 활용 가능한 단센서 기반의 BIM 구축을 위한 기초연구)

  • Cho, Minwoo;Son, Hyojoo;Kim, Changmin;Lee, Joohyuk;Kim, Changwan
    • Journal of KIBIM
    • /
    • v.2 no.1
    • /
    • pp.7-17
    • /
    • 2012
  • In recent years, building information modeling (BIM) has been an important issue within the architect, engineering, and construction (AEC) industry. BIM provides a way to share and exchange semantically rich information about the buildings in order to achieve a successful level of collaboration, communication, and interaction between stakeholders throughout the life cycle of the project. However, despite the recognition of its potential, BIM has not yet been utilized in the construction, operation, and maintenance stages because of the need to reorganize the BIM by reflecting the as-built status of the buildings. In order to improve and increase the use of BIM at all phases of a project, several research efforts are exploring the creation of an as-built BIM that is based on advanced sensors. However, there is a lack of literature and investigation on this research area to date within the domestic AEC industry. The aim of this study is to suggest ways in which BIM can be utilized within the construction, operation, and maintenance stages based on advanced sensors so that it is an approach that might be usefully carried forward. This paper begins by presenting a review of the existing BIM research and achievement in order to determine the limitations of the use of BIM in the domestic AEC industry. Conclusively, this paper suggests a direction for the future applications of BIM and describes how it can benefit from additional research.

Prioritizing of Civil-BIM DB Construction based on Geo-Spatial Information System (지형공간정보체계 기반의 토목-BIM DB구축 우선순위 선정)

  • Park, Dong Hyun;Kang, In Joon;Jang, Yong Gu;Lee, Byung Gul
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.23 no.1
    • /
    • pp.73-79
    • /
    • 2015
  • Recently, BIM proliferates at high speeds so that BIM planning is trying to be used in various kinds of engineering. However, when using different software during design phase and construction phase, the problem of mutual compatibility is coming out. Even the BIM technology has been used or the practical applicability has been made into result, it would be fair to say that BIM has limitations in the visual level. In this research, it is meaningless to obtain the BIM result as the primary purpose. As the usefulness of it is judged incomplete, we committed to master the trend and problems of terrain spatial information systems and BIM. Furthermore, the plan of building the BIM in the civil field, especially the civil-BIM based on the technology ofterrain spatial information has been presented. It can be judged through this research that the high-capacity DB of BIM occurred during the whole process may cause poor performance of the following stage the structure system which connects the terrain spatial information and civil-BIM. In order to manage the optimal full cycle, the spatial analysis technology of the stages after choosing the DB has been described.

COBie Document Prototype for supporting BIM based Smart Maintenance of Buildings (BIM 기반 건축물 스마트 유지관리 지원 COBie 문서 프로토타입)

  • Koo, Kyo-Jin;Park, Sang-Hun;Cho, Dong-Hyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.12
    • /
    • pp.60-68
    • /
    • 2019
  • For effective building maintenance, the collection and management of various maintenance date such as work history information and material information is required. Despite the introduction of information management technologies and systems to reduce the amount of maintenance work of buildings, which have become larger and more complex, the maintenance information is not being utilized properly. As an alternative, research on the introduction and utilization of BIM is being conducted continuously. However, the BIM models generated at the design phase are not utilized in practice due to a lack of architectural maintenance information. This study proposed a COBie document prototype to support BIM-based smart maintenance tasks performed by building managers. In order to formalize various types of maintenance work procedures, a BIM-based maintenance process model is presented in two categories: inspection and maintenance. Among the BIM attribute data of the BIM model generated at the design phase, the parameters corresponding to the maintenance necessary information for each basic process are derived. Based on this, we proposed a COBie document prototype consisting of seven spreadsheets. The results of a case study confirmed that the KBIMS library-based BIM model created at the design phase without the maintenance information can be used at the maintenance phase.

Development of AAB (Algorithm-Aided BIM) Based 3D Design Bases Management System in Nuclear Power Plant (Algorithm-Aided BIM 기반 원전 3차원 설계기준 관리시스템 개발)

  • Shin, Jaeseop
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.28-36
    • /
    • 2019
  • The APR1400 (Advanced Power Reactor 1400MW) nuclear power plant is a large-scale national infrastructure facility with a total project cost of 8.6 trillion won and a project period of 10 years or more. The total project area is about 2.17 million square meters and consists of more than 20 buildings and structures. And the total number of drawings required for construction is about 65,000. In order to design such a large facility, it is important to establish a design standard that reflects the design intent and can increase conformity between documents (drawings). To this end, a design bases document (DBD) reflecting the design bases that extracted in regulatory requirements (e.g. 10CFR50, Korean Law, etc.) is created. However, although the design bases are important concepts that are a big framework for the whole design of the nuclear power plant, they are managed in 2-dimensional by the experts in each field fragmentarily. Therefore, in order to improve the usability of building information, we developed BIM(Building Information Model) based 3-dimensional design bases management system. For this purpose, the concept of design bases information layer (DBIL) was introduced. Through the simulation of developed system, design bases attribute and element data extraction for each DBIL was confirmed, and walls, floors, doors, and penetrations with DBIL were successfully extracted.